HomeMy WebLinkAboutNCG020045_Inspection Report_20210603 Compliance Inspection Report
Permit:NCG020045 Effective: 05/06/21 Expiration: 06/30/21 Owner: Martin Marietta Materials Inc
SOC: Effective: Expiration: Facility: Martin Marietta-Arrowwood
County: Mecklenburg
11325 Texland Blvd
Region: Mooresville
Charlotte NC 28217
Contact Person:Jay Nivens Title: Phone:704-409-1475
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 06/03/2021 Entry Time 11:OOAM Exit Time: 12:OOPM
Primary Inspector:Jeffrey A Chandler Phone: 704-663-1699
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Mining Activities Stormwater Discharge COC
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG020045 Owner-Facility:Martin Marietta Materials Inc
Inspection Date: 06/03/2021 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Mine is in compliance. General housekeeping is necessary at the shop onsite and updates to the map are needed with new
landowners and leasers surronding the mine site.
Page 2 of 3
i
A
Permit: NCG020045 Owner-Facility:Martin Marietta Materials Inc
Inspection Date: 06/03/2021 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑
#Does the Plan include a General Location(USGS)map? 0 ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? 0 ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? N ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? E ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑
#Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑
#Does the Plan include a BMP summary? 0 ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan(SPRP)? 0 ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑
#Does the facility provide and document Employee Training? 0 ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑
#Is the Plan reviewed and updated annually? ❑ E ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ E
Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑
Comment: SWPPP needs to be reviewed and updated annually.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment:
Analytical Monitorinq Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑
Comment:
Permit and Outfalls Yes No NA NE
#Is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑
#Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
#If the facility has representative outfall status,is it properly documented by the Division? ❑ ❑ ❑
#Has the facility evaluated all illicit(non stormwater)discharges? ❑ ❑ E ❑
Comment:
Page 3 of 3