Loading...
HomeMy WebLinkAboutNCC215176_Site Plan or Location Map_20210914EROSION CONTROL LEGEND TEMPORARY CONSTRUCTION ENTRANCE/EXIT. TEMPORARY SEDIMENT FENCE. -�- TEMPORARY SEDIMENT FENCE WITH STONE OUTLET. TEMPORARY STONE CHECK DAM. TEMPORARY WIRE AND STONE INLET PROTECTION ' TEMPORARY CONCRETE WASHOUT PIT AND SIGNAGE CALCULATIONS TOTAL SITE AREA = 32,566.48 SF = 0.75 ACRES TOTAL DISTURBED AREA = 33,033.24 SF = 0.75 ACRES IMPERVIOUS AREA TOTAL SITE: EXISTING IMPERVIOUS: PROPOSED IMPERVIOUS: TOTAL IMPERVIOUS: PROPOSED IMPERVIOUS %: 32,566.48 SF 0 SF 14,030.33 SF (BUILDING) 4.239.54 SF (SIDEWALKS/PAVING) 18,269.87 SF (TOTAL PROPOSED) 18,269.87 SF 23,446 SF (OPEN SPACE) 56.1 % GENERALNOTES 1. TOTAL SITE AREA = 32,566.48 SF = 0.75 ACRES. 2. TOTAL DISTURBED AREA = 33,033.24 SF = 0.75 ACRES. 3. CUT SLOPES SHALL BE A MAXIMUM OF 2:1 UNLESS OTHERWISE SHOWN. FILL SLOPES SHALL BE A MAXIMUM OF 3:1 UNLESS OTHERWISE SHOWN. 4. CONTRACTOR SHALL COMPLY WITH ALLSTATE AND LOCAL EROSION CONTROL REQUIREMENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING EROSION CONTROL PLAN APPROVAL FOR OFF -SITE BORROW OR WASTE SOURCES. 5. REMOVE VEGETATION, TOPSOIL, DEBRIS, UNSATISFACTORY SOIL MATERIALS, OBSTRUCTIONS, AND DELETERIOUS MATERIALS FROM GROUND SURFACE PRIOR TO PLACING FILLS. PLOW, SCARIFY, BENCH, OR BREAK UP SLOPED SURFACES STEEPER THAN 1 VERTICAL TO 4 HORIZONTAL SO FILL MATERIAL WILL BOND WITH EXISTING MATERIAL. PLACE AND COMPACT FILL MATERIAL IN LAYERS TO REQUIRED ELEVATIONS. 6. PLACE BACKFILL AND FILL MATERIALS IN 8" LIFTS. UNDER STRUCTURES, BUILDING SLABS, STEPS, AND PAVEMENTS, SCARIFY AND RECOMPACT TOP 12" OF EXISTING SUBGRADE AND COMPACT EACH LAYER OF BACKFILL OR FILL MATERIAL AT 95% DRY DENSITY. UNDER LAWN OR UNPAVED AREAS, SCARIFY AND RECOMPACT TOP 6" BELOW SUBGRADE AND COMPACT EACH LAYER OF BACKFILL OR FILL MATERIAL AT 85% DRY DENSITY. 7. UNIFORMLY GRADE AREAS TO A SMOOTH SURFACE, FREE FROM IRREGULAR SURFACE CHANGES. MEET COMPACTION REQUIREMENTS AND GRADE TO CROSS SECTIONS, LINES, AND ELEVATIONS INDICATED. PROVIDE A SMOOTH TRANSITION BETWEEN ADJACENT EXISTING GRADES AND NEW GRADES. SLOPE GRADES TO DIRECT WATER AWAY FROM BUILDINGS AND TO PREVENT PONDING. 8. AREAS AS DIRECTED BY THE GEOTECHNICAL ENGINEER AND AS APPROVED BY THE OWNER. GRADING CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND OFF -SITE DISPOSAL OF EXCESS TOPSOIL AND OTHER UNSUITABLE MATERIAL. 9. CONSTRUCTION STAKEOUT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 1 � I II � II II II I II II I II II ,I III �3z WV II _ II I 0 _ �I 1 J I I I' 830 9 \829 l' O I �I� 1 ,< I J Uco \ / I N y w a� 0 IM I \ a \0I 1 I 1 Uj' ICDI jl I I II / l 111 OLD 1 1 PLAIITION/1 1 1 �, IIIlr (30 PRIgCE R/W 11 1 l a /� N / 1 1 � 1 ill I 111 1 0 / O FH � ii it ll d. i Al i LO I / / _ ./ • J _s11- - This plan complies with Chapter 8, Section 4 - Erosion Control of the Winston-Salem/Forsyth County Unified Development Ordinance. A printed set of the stamped/approved plans must be kept on the construction site for reference when installing required erosion control measures. matthewo 09/08/2021 10:37:06 AM OWNER / DEVELOPER: 253 S. PEACEHAVEN, LLC 11 BROOKSTOWN AVE. WINSTON SALEM, NC 27101 PHONE: 336- EMAIL: ENGINEER: ALLIED DESIGN, INC. 4720 KESTER MILL ROAD WINSTON-SALEM, N.C. 27103 PHONE: (336) 765-2377 EMAIL: SCAUSEY @,ALLIED-ENGSURV.COM al.,meor = a � u 011ie'$ Bargain OulletQ ? ArhA +S �wnx v. eesaner `t ar6 AQ611me1116 �q Beeca B,,II I09 Play II Agam $pOh$ a Wlnfiton Salem a""�e ICI ry Day Sell 8 BOf angles / Wa[grean 9 ®BawlsTimer °• SedgeFleld.Apanmenls Kimono: n Q ®HesYaura And Sushi Bar ghn Asses of les �'s� �6 �a �nTh s'' Duk�'s a Nr ""�r,, Q se Salem Gymnastics & Mnli Bankof Ai,', S4� 'ItOZune Auto Parts v ATM (Drive w +ft"�rm War 'H'a a,e1rq Footl Ll4 ®Camel Cily Homesm>Y•�` inspecllon$ ( I s 1 Breckinrldge Club Hoose �} a ate` xmo�n.�o a xrvc,nwe• A'aao�»a�m o. Wp j �Carollna sampi., e 1 q Jumper Glen© \ "' old almiaam c� 1 � .... Fltler Fat Boutique Old Nam h 9 , vBrookdale Winster-Salem $avannan Placev aq „ Carle' Apartments I Plaza WesIQ § 200 BraehIllQ MCD. VICINITY MAP " NOT TO SCALE EROSION CONTROL CONSTRUCTION SEQUENCE 2-12-13 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL AND PERMIT FROM THE CITY OF WINSTON-SALEM INSPECTIONS. 2. CONTACT EROSION CONTROL INSPECTOR TO ESTABLISH A PRE -CONSTRUCTION CONFERENCE AND INSPECTION SCHEDULE. SELF INSPECTION ----- EFFECTIVE OCTOBER 1, 2010, PERSONS CONDUCTING LAND -DISTURBING ACTIVITIES, LARGER THAN ONE (1) ACRE, MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE INSPECTION IN WRITING ON APPROVED FORMS AVAILABLE FROM THE CITY OF WINSTON-SALEM INSPECTIONS OFFICE. THE PHASES ARE AS FOLLOWS: 1. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. 2. CLEARING AND GRUBBING OF EXISTING GROUND COVER. 3. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS. 4. INSTALLATION OF STORM DRAINAGE FACILITIES. 5. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 6. ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. 3. CLEAR SITE ONLY AS NECESSARY TO INSTALL INITIAL EROSION CONTROL MEASURES AS FOLLOWS: A. TEMPORARY CONSTRUCTION ENTRANCE/EXIT B. TEMPORARY SEDIMENT BASINS. FOR SITES OVER ONE (1) ACRE, OUTLET STRUCTURES [SKIMMERS] THAT ONLY WITHDRAW WATER FROM THE SURFACE OF THE BASIN, SHALL BE UTILILIZED. NO SEDIMENT TRAPS OR ROCK DAMS ALLOWED. C. TEMPORARY DIVERSION BERMS D. TEMPORARY SILT FENCING SEED EMBANKMENTS AND DISTURBED AREAS OF DEVICES (INCLUDING "CLEAN" WATER DIVERSION) UPON COMPLETION OF CONSTRUCTION. SEE GROUND STABILIZATION CRITERIA BELOW FOR MORE INFORMATION. 4. BEGIN CLEARING, GRUBBING, AND STRIPPING OF SITE AS REQUIRED. EARTHEN -MATERIAL STOCKPILES ON -SITE FOR LATER DISTRIBUTION AND/OR REMOVAL, AREAS DEDICATED FOR MANAGEMENT OF LAND CLEARING AND DEMOLITION DEBRIS, CONSTRUCTION AND DOMESTIC WASTE, AND HAZARDOUS OR TOXIC WASTE SHALL BE LOCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS (UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE), AND WITHIN AREAS PROTECTED BY EROSION CONTROL MEASURES. 5. BEGIN SITE GRADING. MAINTAIN EROSION CONTROL DEVICES IN ACCORDANCE WITH THE MAINTENANCE PLAN. INSTALL ADDITIONAL EROSION CONTROL MEASURES AS REQUIRED. 6. INSTALL STORM DRAINAGE SYSTEM AND UTILITIES. STORM PIPING SHALL BE INSTALLED TO THE POINT WHERE IT ENTERS EACH DEVICE. COMPLETION OF PIPING WILL ONLY BE ALLOWED ONCE THE SITE HAS BEEN DEEMED STABLE BY THE EROSION CONTROL INSPECTOR. INSTALL PROTECTION AROUND ALL INLETS AS STORM DRAIN SYSTEM IS INSTALLED. GROUND STABILIZATION CRITERIA SITE AREA STABILIZATION STABILIZATION DESCRIPTION TIMEFRAME TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES, & SLOPES SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH & ARE NOT STEEPER THAN 2:1, 14 DAYS ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES > 50 FEET IN LENGTH ALL OTHER AREAS WITH 14 DAYS NONE SLOPES FLATTER THAN 4:1 7. PRIOR TO THE CONTRACTOR DEMOBILIZING FROM THE SITE (AT APPROXIMATELY 45 DAYS PRIOR TO DEMOBILIZATION), THE FINANCIALLY RESPONSIBLE PARTY (OR THE DESIGNEE) WILL NOTIFY JOE FOGARTY (CITY OF WINSTON-SALEM STORMWATER ENGINEER 336-747-6961) AND THE DESIGNATED EROSION CONTROL INSPECTOR OF THEIR ANTICIPATED DATE TO LEAVE THE SITE. AN ON -SITE INSPECTION WILL BE CONDUCTED PRIOR TO THE LEAVE DATE BY MR. FOGARTY AND THE DESIGNATED EROSION CONTROL INSPECTOR TO MAKE CERTAIN ALL ACTION ITMES HAVE BEEN ADDRESSED BY THE CONTRACTOR.. 8. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN ESTABLISHED OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION CONTROL MEASURES ONLY AFTER FINAL INSPECTION AND APPROVAL BY INSPECTOR. EROSION CONTROL MAINTENANCE PLAN 2-12-13 1. INSPECT ALL SEDIMENTATION AND EROSION CONTROL DEVICES FOR STABILITY AND FUNCTION EACH WEEK AND FOLLOWING EACH RAINFALL EVENT. 2. REMOVE SILT/SEDIMENT FROM TEMPORARY DEVICES WHEN ACCUMULATED VOLUME HAS REACHED 50% CAPACITY. 3. REMOVE ACCUMULATED SILT/SEDIMENT FROM BEHIND TEMPORARY SEDIMENT FENCE WHEN DEPTH EXCEEDS APPROXIMATELY 0.5'. REPAIR AND REPLACE SILT FENCE AS NECESSARY. 4. SEED AND STABILIZE TEMPORARY DIVERSION BERMS IMMEDIATELY AFTER CONSTRUCTION INCLUDING "CLEAN" WATER DIVERSION BERMS. RE-GRADE/REPAIR BERMS AS REQUIRED. 5. CONTRACTOR SHALL APPOINT AN ON -SITE INSPECTOR AND MAINTAIN RECORDS OF INSPECTIONS IN ACCORDANCE WITH THE PROVISIONS OF THE GENERAL NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES. M fn O V wZ N z_ J U O U) 0 U E ,J 0 O 0 5. OZ C to '^ M O 0) U) Z J N I C o 0 W Q S UZ�o W YIO� J O U) N Z O CU Q U > d ILL L FIRM LICENSE C-1891 �yt4ifF13: FARO 0 o�ESS/ yy9 = 97 frR M.CN ya z z U z LU LU 06 > o rJn vN Q LU lclL = J Q LU U inU) a O z LU z 0 N o Y O J 2 O (n N N O 0 O Z � m U Z m � W 0 Z w O > W a � U CD Z O z O (/) H U) W W � a Of O ILL 0 W D J) W QN 00 O Q Z SITE INDIVIDUAL LOT EROSION CONTROL PLAN GRAPHIC SCALE SHEET 30 0 15 30 60 120 C1 ( IN FEET ) 1 inch = 30 ft.