Loading...
HomeMy WebLinkAbout20201377 Ver 1_22010-Site Impacts Plan C1_11x17_20210913Strickland, Bev From: Norton, April R CIV USARMY CESAW (USA) <April.R.Norton@usace.army.mil> Sent: Tuesday, September 14, 2021 9:20 AM To: Goss, Stephanie; Ian Eckardt Subject: RE: [External] RE: Request for Additional Information (SAW-2018-01693) South Ellerbe Restoration CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. NWPs 27, 18, and 14. 0 April R. Norton Regulatory Division US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 57 Fax: (919) 562-0421 Email: Aprii.R.Norton@usace.army.mil From: Goss, Stephanie <stephanie.goss@ncdenr.gov> Sent: Tuesday, September 14, 2021 9:18 AM To: Norton, April R CIV USARMY CESAW (USA)<Aprii.R.Norton@usace.army.mil>; Ian Eckardt <ieckardt@wildlandseng.com> Subject: [Non-DoD Source] RE: [External] RE: Request for Additional Information (SAW-2018-01693) South Ellerbe Restoration So, for clarification on my end, which nationwide permits will be used for this project? Stephanie Z. Goss Environmental Program Consultant Division of Water Resources Raleigh Regional Office 380o Barrett Drive Raleigh, NC 27609 919-791-4256 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Norton, April R CIV USARMY CESAW (USA) <Aprii.R.Norton@usace.army.mil> Sent: Tuesday, September 14, 2021 9:07 AM To: Ian Eckardt <ieckardt@wildlandseng.com> Cc: Goss, Stephanie <stephanie.goss@ncdenr.gov> Subject: [External] RE: Request for Additional Information (SAW-2018-01693) South Ellerbe Restoration 1 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. I'd also like to mention that I am authorizing Impacts W2, W3, and W4 under NWP 18 as they do not appear to be a true part of the restoration portion of the project. April R. Norton Regulatory Division US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 57 Fax: (919) 562-0421 Email: April.R.Norton@usace.army.mil From: Ian Eckardt <ieckardt@wildlandseng.com> Sent: Tuesday, September 14, 2021 8:31 AM To: Norton, April R CIV USARMY CESAW (USA) <April.R.Norton@usace.army.mil> Cc: Goss, Stephanie <stephanie.goss@ncdenr.gov> Subject: [Non-DoD Source] RE: Request for Additional Information (SAW-2018-01693) South Ellerbe Restoration April, I misinterpreted the site remediation (grading and removing of impervious surfaces) as a potential activity that would align with the NWP 38 however the proposed wetland impact (W1) to Wetland B is for upfront site grading to remove historic floodplain fill to facilitate the re-establishment of a stream and wetland complex so I think it makes sense to consider W1 for wetland re-establishment/relocation. Let me know if you need any further information. I'm in the field today but will be checking emails periodically. I can plan to update the impact sheet with the NWP sought revision for W1 and restate the impact acreage of W3 as <0.001 tomorrow if these updates work for everyone. Thanks, Ian Eckardt, PWS I Environmental Scientist 0: 704.332.7754 x108 M: 704.517-4988 Wildlands Engineering, Inc. 1430 S. Mint St, Suite 104 Charlotte, NC 28203 From: Norton, April R CIV USARMY CESAW (USA) <Aprii.R.Norton@usace.army.mil> Sent: Monday, September 13, 2021 3:50 PM To: Ian Eckardt <ieckardt@wildlandseng.com> Cc: Goss, Stephanie <stephanie.goss@ncdenr.gov> Subject: RE: Request for Additional Information (SAW-2018-01693) South Ellerbe Restoration Dear Ian, 2 Thank you for the overall plan sheet for the subject project. Could you please provide more information regarding the purpose and need for the proposed impacts to Wetland B, impact W1? The application states that the soil does not pose a risk to human health or the environment, and the compounds found are commonly found in urban areas of North Carolina. It seems as though this proposed activity involves grading and does not seem to meet the terms and conditions of Nationwide Permit 38. The proposed activity may qualify for NWP 18, if the impacts are reduced and do not exceed the 0.10-acre threshold. Additionally, compensatory mitigation would be required for impacts exceeding 0.10-acre (this would not include impacts listed under NWP 27). However, NWP 27 allows the relocation of non -tidal wetlands and streams on the project site provided there are net increases in aquatic resource functions and services. Would you consider the proposed impacts at Wetland B a result of wetland relocation? I am available to discuss tomorrow, if you'd like. Thanks, April April R. Norton Regulatory Division US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 57 Fax: (919) 562-0421 Email: April.R.Norton@usace.army.mil From: Ian Eckardt <ieckardt@wildlandseng.com> Sent: Monday, September 13, 2021 9:56 AM To: Norton, April R CIV USARMY CESAW (USA) <April.R.Norton@usace.army.mil> Cc: Goss, Stephanie <stephanie.goss@ncdenr.gov> Subject: [Non-DoD Source] RE: Request for Additional Information (SAW-2018-01693) South Ellerbe Restoration April, Attached is an overall site plant sheet with itemized stream and wetland impacts. A table on the upper left of the sheet summarizes each individual impact and the corresponding Nationwide (NWP) permit sought. Initially a NWP 3 was requested for stream impact S1 (culvert extension) however it has been revised to a NWP 14. Currently NWP's 14, 27, & 38 are requested. The plan sheet addresses requested items 1 and 2. For requested item 3, wetland impact (W3) is reported as less than 0.000 acres because it's below the 0.000 AC reporting threshold. Please let me know if you need any other information. Thanks, Ian Eckardt, PWS I Environmental Scientist 0: 704.332.7754 x108 M: 704.517-4988 Wildlands Engineering, Inc. 3 1430 S. Mint St, Suite 104 Charlotte, NC 28203 From: Norton, April R CIV USARMY CESAW (USA) <April.R.Norton@usace.army.mil> Sent: Thursday, July 29, 2021 11:45 AM To: ieckardt@wildlandeng.com Cc: Goss, Stephanie <stephanie.goss@ncdenr.gov>; Trone, Rick V <rick.trone@ncdenr.gov>; Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: Request for Additional Information (SAW-2018-01693) South Ellerbe Restoration Dear Ian Eckardt, Thank you for your PCN and attached information, dated July 1, 2021, for the above referenced project. I have reviewed the information and need clarification before proceeding with verifying the use of Nationwide Permits (NWPs) 38, 27, 14, and 3. Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider your application withdrawn and close the file: 1) Please itemize stream and wetland impacts on the plan sheets; for example, S1 - permanent impacts due to culvert installation. All proposed permanent and temporary impacts should be labeled on the plan sheets. Please ensure that the labeling on the PCN matches the labeling on the plan sheets. 2) Please indicate which NWP you are requesting for each stream and wetland impact. For example, NWP 14 for impact S1 — culvert extension. 3) Wetland Impact at Site W3 does not list an impact area in acres. Please list a valid acreage. Please note that responses to the questions above may prompt additional information requests to allow full evaluation of the proposed project. Let me know if you have any questions. Sincerely, April Norton April R. Norton Regulatory Division US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 57 Fax: (919) 562-0421 Email: Aprii.R.Norton@usace.army.mil 4 S3- TEMPORARY IMPACT FOR OHE� O S4-TEMPORARY I MPACT Impact Areas a OHE OHE OHE OHE OHE OHE ACCESS TO INSTALL FOR RESTORATION TIE IN 0$1 Square Feet of Impacted Area Impacted Area -- N/F BOTTOMLESS CULVERT GRADING P P -r p cmaou,nam S7 PERMANENT IMPACT 304,004 1%ACF (W) (W) - (W 3HE —/— i �,OHE �'� OW�OHE TAHE �IPlry oazz zo-az-assa S6-TEMPORARY IMPACT -FOR FOR RESTORATION 306,W4 1%ACF Future �; i oB zzau7ol _ O' � T �v ;�' i PBz3sz4a Fr ACCESS TO I NSTALL BOTTOM LESSRO� - A 327,259 0.2%ACF —SS --�$ SS��SS—�-��-- S$.S�SSS CULVERT Wetland A DaClen venue i.0 F' 76,480 Floodwa Dacian Avenue , �� I 60' Public Right of Way r _ -- - _ '-_ i \ '60' Pubhc Righ of Way ` `� i '�, I �. 46,888 Surface Water Buffer Disturbance Zone �C I - _ _ _,,,_ __ Q� -- D Fcnmozss- ---- - -- - ,� '�OhLE - HE T' - 31,077 Surface Water Buffer Disturbance Zone2 --xlsrlry _ __ __- _ _ __ _- - _ ��_- —��—-----a000vulrvANcc -;�` S8-PERMANENT IMPACT 42B5F -- —TING W—D w lEl FOR RESTORATION W2 PERMANENT IMPACT Stream Impact Permanent/ Impact Length L Numher(SiF) Stream Name Temporary Type of Impact Nationwide (NWP) (linearfeet) Si South Ellerbe Permanent Culvert extension NWP 14 36 V e0 Tributary � 52 South Ellerbe Permanent Restoration NWP27 892 Tributary (, C 53 South Ellerbe Temporary Construction access for NWP 14 25 Tributary bottomless culvert install 2 South Ellerbe i v 54 Tributary Temporary Tie in grading NWP27 16 \v SS Uri Permanent Restoration NWP27 16 Construction access for I 56 Uri Temporary bottomless culvert instal NWP 14 8 vt S7 UT2-Intermittent Permanent Restoration NWP27 142 J 58 UT2-Perennial Permanent Restoration NWP27 163 I p Total Permanentlmpact(LF) 1,2A8 ,gl N Total Temporary lmpact(LF) 49 Total Impact LIF 1,297 Wetland Impacts Wetland Impact I Wetland Name Permanent/ Number(WN) (A, B, C....I Temporary Type of Impact Nationwide(NWP) Impact Acreage , I'. Harper PIacE 25Riight of Way �— OH NIF JNG f ham,- PIN 08z2 30.81-0209 DR 745_ PB 15-59//[ _X V / N/F ING InD 1LLC PIN .22-20- ro . DB 74 0— PB 1 59 9ou[nern Repairs 35j2__ - PIN 0822-2081d5Q1_/ PisI OHE ; OHE Total Permanent Impacts JAC) 0.180 / r ij Total Impacts AC 0.180 sull— ATERBDFFIR --- = -- --- -----.-a- ---; —= -; =--------------- --- ---- — ----"- — _ — -----------_ _, ' -------—------------- ----- --_- ------------_-_- _- 3_-1--___-- --- =3�-------- — 3:- - _`--`-'-------- —----------------- ------------ ---_—. —3x_RuANo'ZON -— - --_ ' - _ ----— _ _- 3 a`,---__----- III' O ---_----------- -----------___ -- OH — OHE_- _ OHE HE---� — O �____-_ -- i---"; E� 3 Trinitenue- W s Trinity, n _. --'- 80' Public Right of Way --- i1i -_ ;WI (W) (W) o i (W) (W) (W) (W) (W)—(W+ — II �'®ate .. - -,. ,: , • �Illfl RE tw 1 14 ►���4����►-���.►-����%� , . Ili sF W4 PERMANENT IMPACT FOR RESTORATION LEGEND 1%ACF i 1%ACF Future 0.2%ACF Floodway Q Q Q 4 d 4 4 d Existing Wetlands a 4 Phase III Surface Water Buffer Disturbance Zone 1 Surface Water Buffer Disturbance Zone 2 Wetland Impact - Permanent Stream Impact - Permanent Stream Impact - Temporary Stream Impact Reach Break N w N gg� O 0' 40' 80' 120' F U (HORIZONTAL) 3 v v � Z � rs