From: Norton, April R CIV USARMY CESAW (USA) <April.R.Norton@usace.army.mil>
Sent: Tuesday, September 14, 2021 9:20 AM
To: Goss, Stephanie; Ian Eckardt
Subject: RE: [External] RE: Request for Additional Information (SAW-2018-01693) South Ellerbe
Restoration
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
NWPs 27, 18, and 14. 0
April R. Norton
Regulatory Division
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 57
Fax: (919) 562-0421
Email: Aprii.R.Norton@usace.army.mil
From: Goss, Stephanie <stephanie.goss@ncdenr.gov>
Sent: Tuesday, September 14, 2021 9:18 AM
To: Norton, April R CIV USARMY CESAW (USA)<Aprii.R.Norton@usace.army.mil>; Ian Eckardt
<ieckardt@wildlandseng.com>
Subject: [Non-DoD Source] RE: [External] RE: Request for Additional Information (SAW-2018-01693) South Ellerbe
Restoration
So, for clarification on my end, which nationwide permits will be used for this project?
Stephanie Z. Goss
Environmental Program Consultant
Division of Water Resources
Raleigh Regional Office
380o Barrett Drive
Raleigh, NC 27609
919-791-4256
E-mail correspondence to and from this address may be subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Norton, April R CIV USARMY CESAW (USA) <Aprii.R.Norton@usace.army.mil>
Sent: Tuesday, September 14, 2021 9:07 AM
To: Ian Eckardt <ieckardt@wildlandseng.com>
Cc: Goss, Stephanie <stephanie.goss@ncdenr.gov>
Subject: [External] RE: Request for Additional Information (SAW-2018-01693) South Ellerbe Restoration
1
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
I'd also like to mention that I am authorizing Impacts W2, W3, and W4 under NWP 18 as they do not appear to be a true
part of the restoration portion of the project.
April R. Norton
Regulatory Division
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 57
Fax: (919) 562-0421
Email: April.R.Norton@usace.army.mil
From: Ian Eckardt <ieckardt@wildlandseng.com>
Sent: Tuesday, September 14, 2021 8:31 AM
To: Norton, April R CIV USARMY CESAW (USA) <April.R.Norton@usace.army.mil>
Cc: Goss, Stephanie <stephanie.goss@ncdenr.gov>
Subject: [Non-DoD Source] RE: Request for Additional Information (SAW-2018-01693) South Ellerbe Restoration
April,
I misinterpreted the site remediation (grading and removing of impervious surfaces) as a potential activity that would
align with the NWP 38 however the proposed wetland impact (W1) to Wetland B is for upfront site grading to remove
historic floodplain fill to facilitate the re-establishment of a stream and wetland complex so I think it makes sense to
consider W1 for wetland re-establishment/relocation. Let me know if you need any further information. I'm in the field
today but will be checking emails periodically. I can plan to update the impact sheet with the NWP sought revision for
W1 and restate the impact acreage of W3 as <0.001 tomorrow if these updates work for everyone.
Thanks,
Ian Eckardt, PWS I Environmental Scientist
0: 704.332.7754 x108 M: 704.517-4988
Wildlands Engineering, Inc.
1430 S. Mint St, Suite 104
Charlotte, NC 28203
From: Norton, April R CIV USARMY CESAW (USA) <Aprii.R.Norton@usace.army.mil>
Sent: Monday, September 13, 2021 3:50 PM
To: Ian Eckardt <ieckardt@wildlandseng.com>
Cc: Goss, Stephanie <stephanie.goss@ncdenr.gov>
Subject: RE: Request for Additional Information (SAW-2018-01693) South Ellerbe Restoration
Dear Ian,
2
Thank you for the overall plan sheet for the subject project. Could you please provide more information regarding the
purpose and need for the proposed impacts to Wetland B, impact W1? The application states that the soil does not pose
a risk to human health or the environment, and the compounds found are commonly found in urban areas of North
Carolina. It seems as though this proposed activity involves grading and does not seem to meet the terms and conditions
of Nationwide Permit 38. The proposed activity may qualify for NWP 18, if the impacts are reduced and do not exceed
the 0.10-acre threshold. Additionally, compensatory mitigation would be required for impacts exceeding 0.10-acre (this
would not include impacts listed under NWP 27).
However, NWP 27 allows the relocation of non -tidal wetlands and streams on the project site provided there are net
increases in aquatic resource functions and services. Would you consider the proposed impacts at Wetland B a result of
wetland relocation?
I am available to discuss tomorrow, if you'd like.
Thanks,
April
April R. Norton
Regulatory Division
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 57
Fax: (919) 562-0421
Email: April.R.Norton@usace.army.mil
From: Ian Eckardt <ieckardt@wildlandseng.com>
Sent: Monday, September 13, 2021 9:56 AM
To: Norton, April R CIV USARMY CESAW (USA) <April.R.Norton@usace.army.mil>
Cc: Goss, Stephanie <stephanie.goss@ncdenr.gov>
Subject: [Non-DoD Source] RE: Request for Additional Information (SAW-2018-01693) South Ellerbe Restoration
April,
Attached is an overall site plant sheet with itemized stream and wetland impacts. A table on the upper left of the sheet
summarizes each individual impact and the corresponding Nationwide (NWP) permit sought. Initially a NWP 3 was
requested for stream impact S1 (culvert extension) however it has been revised to a NWP 14. Currently NWP's 14, 27, &
38 are requested. The plan sheet addresses requested items 1 and 2.
For requested item 3, wetland impact (W3) is reported as less than 0.000 acres because it's below the 0.000 AC
reporting threshold.
Please let me know if you need any other information.
Thanks,
Ian Eckardt, PWS I Environmental Scientist
0: 704.332.7754 x108 M: 704.517-4988
Wildlands Engineering, Inc.
3
1430 S. Mint St, Suite 104
Charlotte, NC 28203
From: Norton, April R CIV USARMY CESAW (USA) <April.R.Norton@usace.army.mil>
Sent: Thursday, July 29, 2021 11:45 AM
To: ieckardt@wildlandeng.com
Cc: Goss, Stephanie <stephanie.goss@ncdenr.gov>; Trone, Rick V <rick.trone@ncdenr.gov>; Cohn, Colleen M
<colleen.cohn@ncdenr.gov>
Subject: Request for Additional Information (SAW-2018-01693) South Ellerbe Restoration
Dear Ian Eckardt,
Thank you for your PCN and attached information, dated July 1, 2021, for the above referenced project. I have reviewed
the information and need clarification before proceeding with verifying the use of Nationwide Permits (NWPs) 38, 27,
14, and 3. Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this
Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider your application
withdrawn and close the file:
1) Please itemize stream and wetland impacts on the plan sheets; for example, S1 - permanent impacts due to culvert
installation. All proposed permanent and temporary impacts should be labeled on the plan sheets. Please ensure that
the labeling on the PCN matches the labeling on the plan sheets.
2) Please indicate which NWP you are requesting for each stream and wetland impact. For example, NWP 14 for impact
S1 — culvert extension.
3) Wetland Impact at Site W3 does not list an impact area in acres. Please list a valid acreage.
Please note that responses to the questions above may prompt additional information requests to allow full evaluation
of the proposed project.
Let me know if you have any questions.
Sincerely,
April Norton
April R. Norton
Regulatory Division
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 57
Fax: (919) 562-0421
Email: Aprii.R.Norton@usace.army.mil
4
S3- TEMPORARY IMPACT FOR OHE� O S4-TEMPORARY I MPACT
Impact Areas a OHE OHE OHE OHE OHE OHE ACCESS TO INSTALL FOR RESTORATION TIE IN 0$1
Square Feet of Impacted Area Impacted Area -- N/F BOTTOMLESS CULVERT GRADING
P P -r p cmaou,nam S7 PERMANENT IMPACT
304,004 1%ACF (W) (W) - (W 3HE —/— i �,OHE �'� OW�OHE TAHE �IPlry oazz zo-az-assa S6-TEMPORARY IMPACT -FOR FOR RESTORATION
306,W4 1%ACF Future �; i oB zzau7ol _ O' �
T �v ;�' i PBz3sz4a Fr ACCESS TO I NSTALL BOTTOM LESSRO� - A
327,259 0.2%ACF —SS --�$ SS��SS—�-��-- S$.S�SSS CULVERT Wetland A DaClen venue i.0 F'
76,480 Floodwa Dacian Avenue , �� I
60' Public Right of Way r _ -- - _ '-_ i \ '60' Pubhc Righ of Way ` `� i '�,
I �.
46,888 Surface Water Buffer Disturbance Zone �C
I - _ _ _,,,_ __ Q� --
D Fcnmozss- ---- - -- - ,� '�OhLE - HE T' -
31,077 Surface Water Buffer Disturbance Zone2 --xlsrlry _ __ __- _ _ __ _- - _ ��_-
—��—-----a000vulrvANcc -;�`
S8-PERMANENT IMPACT 42B5F -- —TING W—D
w lEl
FOR RESTORATION
W2 PERMANENT IMPACT
Stream Impact
Permanent/
Impact Length
L
Numher(SiF)
Stream Name
Temporary
Type of Impact
Nationwide (NWP)
(linearfeet)
Si
South Ellerbe
Permanent
Culvert extension
NWP 14
36
V
e0
Tributary
�
52
South Ellerbe
Permanent
Restoration
NWP27
892
Tributary
(, C
53
South Ellerbe
Temporary
Construction access for
NWP 14
25
Tributary
bottomless culvert install
2
South Ellerbe
i v
54
Tributary
Temporary
Tie in grading
NWP27
16
\v
SS
Uri
Permanent
Restoration
NWP27
16
Construction access for
I
56
Uri
Temporary
bottomless culvert instal
NWP 14
8
vt
S7
UT2-Intermittent
Permanent
Restoration
NWP27
142
J
58
UT2-Perennial
Permanent
Restoration
NWP27
163
I p
Total Permanentlmpact(LF)
1,2A8
,gl N
Total Temporary lmpact(LF)
49
Total Impact LIF
1,297
Wetland Impacts
Wetland Impact
I Wetland Name
Permanent/
Number(WN)
(A, B, C....I
Temporary
Type of Impact
Nationwide(NWP)
Impact Acreage
,
I'.
Harper PIacE
25Riight of Way
�— OH
NIF
JNG f ham,-
PIN 08z2 30.81-0209
DR 745_
PB 15-59//[
_X V /
N/F
ING InD 1LLC
PIN .22-20- ro .
DB 74 0—
PB 1 59
9ou[nern Repairs 35j2__ -
PIN 0822-2081d5Q1_/
PisI
OHE ;
OHE
Total Permanent Impacts JAC) 0.180 / r ij
Total Impacts AC 0.180
sull— ATERBDFFIR
---
=
-- --- -----.-a- ---; —= -; =---------------
---
----
—
----"-
— _ —
-----------_
_,
'
-------—------------- -----
--_-
------------_-_- _-
3_-1--___-- ---
=3�--------
— 3:- -
_`--`-'--------
—-----------------
------------
---_—. —3x_RuANo'ZON
-—
- --_
'
- _ ----—
_
_-
3
a`,---__-----
III'
O
---_-----------
-----------___
--
OH — OHE_- _ OHE
HE---�
— O
�____-_
--
i---";
E�
3
Trinitenue-
W s Trinity,
n
_. --'-
80' Public Right of Way ---
i1i
-_
;WI (W) (W)
o i
(W)
(W)
(W) (W) (W)—(W+
—
II
�'®ate .. - -,. ,: , • �Illfl
RE
tw
1 14
►���4����►-���.►-����%� , . Ili
sF
W4 PERMANENT IMPACT
FOR RESTORATION
LEGEND
1%ACF
i
1%ACF Future
0.2%ACF
Floodway
Q Q Q
4
d 4 4
d
Existing Wetlands
a 4
Phase III
Surface Water Buffer
Disturbance Zone 1
Surface Water Buffer
Disturbance Zone 2
Wetland Impact -
Permanent
Stream Impact -
Permanent
Stream Impact -
Temporary
Stream Impact Reach
Break
N
w N
gg� O
0' 40' 80' 120' F U
(HORIZONTAL) 3 v v
� Z � rs