HomeMy WebLinkAboutNCG140390_DMR_20200729STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE N4 INC / V 3 " D
FACILITY NAME: y 6dQ,S1Wio o-n-i—
PERSON COLLECTING SAMPLES Q
CERTIFIED LABORATORY Lab #
Lab #
OPTIONAL INFO:
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: a°
SAMPLING RIOD: ❑ July -December January -June
COUNTY U
PHONE NO.
ADD TO USTSERVE? DYES ❑NO EMAIL: //��
DISCHARGING TO CLASS: ❑SA FHQW ❑PNA ❑Trout Other LJ
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
1
NO FLOW)
PH
(Standard
Units)
TSS
(m�L)
Event
Duration
(minutes)
Total
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
z
2 Sampling
-
-
6-9
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the Sample period above.
' If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I.
°For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
7
tO ili F41,
.k: *4 j� I'
r,- Wi C,:-!
G., 3 1 �-i M,
I
'�,ii CIT AOI 0 11. T*F� 3
fi 72 T rit- 22-yr -j
7 A.21
if F..:'r z n o fv'� o i
TV7
I u n; n-;
-
C-114" it
ti E.
u --it, C: 0 Q u,
ri 7 L) All, FT) 4r-
1 c; C- cl 9;:
f�
�
�
'0
v !.,I
br-ozi-O -..id
eND Li iEal'i � . I
?;(14 FI
7; -1
it
at I U, g,;it -j. !-4
c4v
tic
f Jr., z 1, .4