HomeMy WebLinkAbout20211334 Ver 1_Pre-Filing Acknowledgement Email_20210909Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Thursday, September 9, 2021 12:36 PM
To: amandajohnson@wsp.com
Cc: Ridings, Rob
Subject: Pre -Filing Meeting Request Acknowledgement - Intersection Improvements at SR
2320 and Shepard School Rd - 20211334 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form
for Intersection Improvements at SR 2320 and Shepard School Rd that you submitted on (date). The
ID number for that project is 20211334, Version 1.
Reviewer Contact Information:
Reviewer: Robert Ridings
Reviewer Email: rob.ridings@ncdenr.gov
Reviewing Office: Central Office - (919) 707-9000
When you submit your application please upload a copy of the attached document in this email.
For internal use only: Transportation Project
This email was automatically generated by Laserfiche workflow. Please do not respond to this email
address, as responses are not monitored.
i
DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20211334
Version *
Central Office - (919) 707-9000
Rob Ridings
Pre -Filing Meeting Request submitted 9/8/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
1
Amanda Johnson
amanda.johnson@wsp.com
Intersection Improvements at SR 2320 and Shepard School Rd
Chris Ray, Town of Zebulon
Wake
Owner Address: Street Address
450 East Horton Street
Address Line 2
City State / Rovince / Region
Zebulon North Carolina
Fbstal / Zip Code Country
27597 United States
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
r Shoreline Stabilization
Does this project have an existing project ID#?*
(' Yes r No
Please list all existing project ID's associated with this projects.*
20210937
Do you know the name of the staff member you would like to request a meeting with?
Rob Ridings
Please give a brief project description below and include location information. *
The Town of Zebulon is seeking to improve vehicular and pedestrian
safety at the SR 2320 (Old Bunn Road/Proctor Street) and Shepard
School Road intersection by adding turn lanes, sidewalks, and
pedestrian and traffic signals. To accommodate the sidewalks and
additional lanes, drainage improvements are also being proposed.
The proposed project limits extend approximately 0.17 mile along
Shepard School Road and 0.22 mile along SR 2320.
The project study area is approximately 8.4 acres in size. Areas of
maintained road right-of-way, residential and commercial
development, pasture, agriculture fields, stormwater features,
wetlands, streams, and undeveloped forest occur within the study
area. This project lies in the Neuse River Basin and is subject to the
Neuse River Buffer Rules. There are three different locations where
the project crosses an unnamed tributary of Beaverdam Creek.
As this project is on NCDOT owned roadway, the project will be
administered through NCDOT and all design has been done to their
standards. The existing typical section allows for a two-lane section
that transitions to add a left turn lane at the Walmart Driveway. This
existing typical will be expanded to become a four -lane divided
roadway with a variable width raised median, bike lanes, sidewalks,
and curb and gutter throughout.
Within the project study area, Shepard School Road is being
proposed to be widened to include a variable turn and median lane
and curb and gutter will be installed on both sides. Catch basins are
proposed along the curb and gutter and tie into the existing 30"
reinforced concrete pipe (RCP) -III. The cross pipe would be collared
and extended to proposed roadway fill. By not replacing 30" RCP -III,
impacts to the wetland (W1) will be minimized to temporary fill impacts
for roadway construction. Proposed permanent stream impacts
include pipe extension and channel stabilization at this site.
Along SR 2320 (Proctor Street), a proposed 48" RCP -III cross pipe
would replace the existing 30" RCP. Proposed permanent stream
impacts include rip rap at embankment at the outlet of a proposed
lateral 'v' ditch and pipe inlet channel stabilization at the inlet of the
proposed 48" RCP -III. At the outlet of the proposed 48" RCP -III, rip
rap at the embankment at the outlet and pipe outlet channel
stabilization are being proposed. A roadside ditch that runs parallel to
Shepard School Road north of the intersection will be filled.
Please attach the documentation you would like to have the meeting about.
Shepard School Rd_ DRAFT Buffer Permit
3.1MB
Drawings_Selected Pages.pdf
Shepard School Rd_ DRAFT Wetland and
3.65MB
Stream Permit Drawings_Selected Pages.pdf
Zebulon Shepard Rd Features DWR.pdf 267.06KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 9/8/2021