Loading...
HomeMy WebLinkAboutSW3210702_Supplement-EZ Form_20210910SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name PROVISION CHRUCH 2 Project Area ac 9.562 3 F4 Coastal Wetland Area ac NA Surface Water Area ac 0.2 5 Is this project High or Low Density? Low 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMS: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader -Filter Strip LS-FS 20 Disconnected Impervious Surface DIS 21 Treatment Swale 22 1 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: NEAL SMITH, PE 28 Organization: NEAL SMITH ENGINEERING, INC. 29 Street address: 139 PINEHURST AVE. STE C 30 City, State, Zip: SOUTHERN PINES, NC 28387 31 Phone numbers : 910-695-8825 32 Email: nsmith@nsengineering.com Certification Statement: I certify, under penalty of law that this Supplement-F7 form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. N CA j SEAL 19311 ; SM116611 R����.��`` 1VV — Signa re of Designer Date DRAINAGE AREAS 1 Is this a high densi!y project? No 2 If so, number of drainage areas/SCMs 0-Jan 3 Does this ro ect have low density areas? Yes 4 If so, number of low density drainage areas 1 5 Is all/part of this project subject to previous rule versions? Yes FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LD 7 4 Type of SCM N/A 5 Total BUA from project (sq ft) 63598 sf 6 1995 rules SL 2006-246 2008 rules 2017 rules 7 New BUA on subdivided lots (subject to permitting) (sq ft) N/A 1995 rules SL 2006-246 2008 rules 2017 rules 8 New BUA not on subdivided lots (subject to permitting) (sf) 63598 sf 1995 rules SL 2006-246 2008 rules 2017 rules 9 Offsite - total area (sq ft) sf 1995 rules SL 2006-246 2008 rules 2017 rules 10 Offsite BUA (sq ft) sf 1995 rules SL 2006-246 2008 rules 2017 rules 11 Design storm (inches) N/A 1995 rules SL 2006-246 2008 rules 2017 rules 12 Breakdown of new BUA: - Parking (sq ft 44744 sf - Sidewalk (sq ft 2714 sf - Roof (sg ft 16140 sf - Roadway s n - Future (sq ft - Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on Isubdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 15% 19 1 Desi n volume of SCM cu ft 20 1 Calculation method for design volume ADDITIONAL INFORMATION 121 Please use this space to provide any additional information about the drainage area(s): LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECrS FROM 02H .1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per.1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) 3:1 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 6 Are curb outlet swales proposed? Yes 7 Maximum longitudinal slope of curb outlet swale(s) (%) 5% 8 Bottom width of curb outlet swale(s) (feet) 3 ft 9 Maximum side slope of curb outlet swale(s) (H:V) 3:1 10 Minimum length of curb outlet swale(s) (feet) 100 ft 11 Are treatment swales used instead of curb outlet swales? No 12 is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 Are variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 1 Please use this space to provide any additional information about this low density project: ©�� r r• r®" ® rr �� r r r • r .r � r .• � rr �®�