Loading...
HomeMy WebLinkAboutNCC191596_NOT Closeout Documents_20210830Engineering and I� • Env-ironmental Services SURETY RELEASE October 1, 2020 Southeastern Freight Lines, Inc. Attn: Ryan Smigiel 420 Davega Rd. Lexington, SC 29073 Re: SEFL — Driver's Rest Bldg. & Loading Dock Addition Phase 2 JCN No. 5220-10 Performance Bond # -Not listed RETURN RECEIPT REQUESTED CERTIFIED MAIL # 7017 0660 0001 1209 1564 Dear Mr. Smigiel, An erosion control inspection performed on September 8, 2020 indicates that the subject project is complete and all areas are permanently stabilized. Therefore, the performance bond issued on October 8, 2019 in the amount of $31.200.00 is hereby released. Contact me at phone number 919-560-0737 if you have any questions. Sincerely, Rob Stewart Erosion Control Technician Enclosure: Performance Bond