HomeMy WebLinkAboutNCC191596_NOT Closeout Documents_20210830Engineering and
I� • Env-ironmental Services
SURETY RELEASE
October 1, 2020
Southeastern Freight Lines, Inc.
Attn: Ryan Smigiel
420 Davega Rd.
Lexington, SC 29073
Re: SEFL — Driver's Rest Bldg. & Loading Dock Addition Phase 2
JCN No. 5220-10
Performance Bond # -Not listed
RETURN RECEIPT REQUESTED
CERTIFIED MAIL # 7017 0660 0001 1209 1564
Dear Mr. Smigiel,
An erosion control inspection performed on September 8, 2020 indicates that the
subject project is complete and all areas are permanently stabilized. Therefore, the
performance bond issued on October 8, 2019 in the amount of $31.200.00 is hereby
released.
Contact me at phone number 919-560-0737 if you have any questions.
Sincerely,
Rob Stewart
Erosion Control Technician
Enclosure: Performance Bond