Loading...
HomeMy WebLinkAbout20071032 Ver 1_Approval Letter_20070603~OF W ATF,QQ Michael F. Easley, Governor ~~ ~i William G. Ross Jr., Secretary ~ ~ North Carolina Department of Environment and Natural Resources ~ ~ ~ .~ Coleen Sullins, Director Division of Water Quality July 3, 2007 Rockingham County DWQ Project No. 07-1032 Honeysuckle Rd (SR 2304) APPROVAL of 401 Water Quality Certification Mr. J.M. Mills, P.E. Division Engineer, Division 7 North Carolina Department of Transportation 1584 Yanceyville Street Greensboro, North Carolina, 27415 Dear Mr. Mills: You have our approval, in accordance with the attached conditions and those listed below, to incur the following impacts in order to replace a bridge with a corrugated metal pipe arch on Honeysuckle Rd (SR 2304) in Rockingham County: • 90 linear feet of fill impacts to a Little Jacob's Creek; and • Temporary dewatering impacts of 50 square feet during construction. The project shall be constructed in accordance with your application dated June 11, 2007. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Nos. 3627, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Numbers 14. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 federal permit. This condition supercedes condition No. 19 in the General Certification 3627. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the Division of Water Quality (Division) and submit a new application. If the property is sold, the new owner must be given a copy of this approval letter and certifications, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification and any additional conditions listed below. A preconstruction meeting with the Division Environmental Officer or Environmental Specialist shall be conducted on site prior to commencing any in-stream work. The Division of Water Quality shall be notified of the preconstruction meeting as far in advance as possible prior to the meeting.. The preconstruction meeting shall discuss culvert alignment, culvert installation in bedrock, and flood plain bench elevation and installation at a minimum. No e hCarolina ~aturally North Carolina Division of Water Quality 585 Waughtown Street Phone (336) 771-5000 Customer Service Internet: www.ncwaterquality.org Winston-Salem, NC 27107 FAX (336) 771-4630 1-877-623-6748 An Equal OpportunitylAffirmative Action Employer- 50% Recycledl10% Post Consumer Paper Mr. Mike Mills, P.E. July 3, 2007 DWQ# 07-1032 Page 2 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. 4. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the completion of the project. 5. Native riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 6. Stormwater should be directed to vegetated buffer areas, grass lined ditches or other means appropriate to the site for the purpose of pre-treating stormwater runoff, and must not be routed directly into streams. Mowing of existing vegetated buffers is strongly discouraged, so that they maybe utilized for stormwater sheet flow. 7. Given the bedrock nature of the stream, the culverts shall not be buried but shall be placed at grade as much as practical. 8. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. 9. The dimension, pattern and profile of the stream above and below the crossing should not be modified. Disturbed floodplains and streams should be restored to natural geomorphic conditions. 10. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. 11. If concrete is used during construction, a dry work area should be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 12. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. 13. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. 14. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 15. Under no circumstances must rock, sand or other materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate vicinity of the culverts. 16. Temporary dewatering sites must be restored to preexisting conditions unless more natural geomorphic conditions can be provided. Mr. Mike Mills, P.E. July 3, 2007 DWQ# 07-1032 Page 3 17. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 18. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification. 19. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certification of Completion Form" to notify DWQ when all work included in the 401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the Division of Water Quality upon completion of the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Sue Homewood at 336-771-4964 or at Sue.Homewood@ncmail.net. Sincerely, ~J" ,~y~Coleen Sullins Attachment cc: Andy Williams, USACE Raleigh Field Office Jerry Parker, Division 7, Division Environmental Officer DWQ ~~N,e>~11~/,~40I, Trpc~rtativn-Unit DWQ Winston Salem Regional Office DWQ Central Files