Loading...
HomeMy WebLinkAboutNCC214497_Site Plan or Location Map_20210827e® (n z w 0 t LEGEND GEOTEXTILE FABRIC UNDERY .w ti PARCEL BGUNDAY 41. AA _A I� ' LIMIT DISTURBANCE 1-7 , 9 riFLOOD ZONE --FZ w SILT FENCE POCK OUTLE STING EXI GON f 4..3L.JRS \—WIDTH AS REOUIRED EMERGENG t�V��1=LC>tfV WETLAND (15 ELEV 67.50 �p/ IVgp�+�—� /+yyg{(�e^q� Tt.mf Y9! '4i �Y"tfO YA DIVERSION TEMPORARY s NC GRID N D 83 (2011) ADDITIONAL N OTE"S 4 ,00> 0 100' 200' 7 70 __. _. _ __. _ . r _ _, _ _. ..... , _. _ _. _.._ _ _,.._ _ _. _.. _ _ 1 INCH =100 FEET HORZ. 1. TOPOGRAPHIC fINC., Q QGRAPFiIC INFORMATION PROVIDED CAPE FEAR ENGINEERING, ELEVATION , ___ ,__.__. _._ _.___ . __ .._68 1 INCH =` 00 FEET VERTICAL -BASED ON NAVD88. 66 66 2 CONTRACTOR TO FIELDV VERIFY ALL EXISTING UNDERGROUND UTILITIES BEFORE m.n. . -� I _v_ _ --�---__._ M _______� .. ____ ___,______{_. _____ BEGINNING CONSTRUCTION.2 -------------- ,' 62 60 3. THE TOTAL AREA 4F DISTURBANCE IS 569,859 SF (13.08 AC). REQUIRED QRQUNDCOVER TIMES 4. WETLAND DELINEATION BY NEEE HAM ENVIRONMENTAL, USACE VERIFICATION AND SEE SEQUENCE OF LAND DISTURBANCE ,NOTES APPROVAL SAW-2000-4029 �- f AND VEGETATION SCHEDULE DETAIL ON SHEET D-1� 5. INSTALL POND 7, FOREBAY, AND POND #8 WITH STQRMWATER OUTLETS AND I + ��� 12 � I3 i� � I7+ i��C�c�I�+7 f _ I5 Ida + PIPING INFRASTRUCTURE BETWE=N POND #8 AND POND #7 BEFORE BEGINNING 7 DAY MAXIMUM 1 ANY GRADING OR CONSTRUCTION. !m 14 DAY MAXIM "U M ISSUED FOR agar } OY F e. 8 m 3 A LIEN 10/ 4/17 0 ADDED BORROW POND REMISED LOT LAYOUT, RAS ISSUED FOR CONSTRUCTION 5 17 A ISSUED FOR STORMWATER, EROSION E N CONTROL AND CONTRACTOR PRICING 1 ,/10/14 REV; DESCRIPTION R VAY REVISIONS �±j f iRt?JECT NUF.RBER SHEE �Ellv9.g�;R