Loading...
HomeMy WebLinkAboutNCC190807_NOT Closeout Documents_20210824North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Duke Energy Progress, LLC Fayetteville County: Cumberland Project: 230kV Substation River basin: Cape Fear Person financially responsible: Duke Energy Progress, LLC - Timothy Same, Project N: CUNME-2019-187 Manager of Substation Engineering Address: 410 South Wilmington Street, Raleigh, NC 27601 1. Project Location: Cumberland Road/SR 1141, Fayetteville Pictures: No 2. Weather and soil conditions: rainy, not workable 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: No If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Rick Sago, Will Russell Title: Ass't. Site Manager, Maintenance Worker Inspection report: Sent Report Date given/sent: July 09, 2020 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination_ Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Date of inspection: July 08, 2020 Time arriving on site: 1:00 PM Time leaving site: L IO PM cc: Jared Gainey, Rick Sago (via email)