HomeMy WebLinkAboutNCC192387_NOT Closeout Documents_20210823North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336)
776-9800
County: Wilkes Project: Yadkin Valley Umbrella Mitigation River basin: Yadkin-PeeDee
Person financially responsible: Wildlands Engineering, Inc. - Shawn D Wilkerson, Project #: WILKE-2020-002
Manager
Address: 1430 South Mint Street, Suite 103, Charlotte, NC
1. Project Location: Antioch Church Rd., North Wilkesboro
Pictures: No
2. Weather and soil conditions: 80's sunny Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Bart Keller Title: Farmer
Inspection report: Sent Report Date given/sent: July 29, 2021
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is released. Termination of
coverage under the NPDES General Stormwater Permit for Construction Activities should be
requested by the permittee via Notice of Termination
Reported by: Tim Latham Others present:
Date of inspection: July 27, 2021 Time arriving on site: 2:40 PM Time leaving site: 3:50 PM
cc: ereinicker&wildlandeng.com; bmcquire&wildlandseng.com;