Loading...
HomeMy WebLinkAboutNCC191410_NOT Closeout Documents_20210823Sedimentation/ConstrUCtion Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Mecklenburg Project: CSX Charlotte - Truck Staging Lot Expansion River basin: Catawba Person financially responsible: CSX - Richard Hisrich, Director Terminal Project #• MECKL-2020-016 Development Address: 500 Water Street, S/C J350, Jacksonville, FL 32202 1. Project Location: Hovis Road, Charlotte Pictures: No 2. Weather and soil conditions: Sunny, Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No One Title: Inspection report: Sent Report Date given/sent: August 13, 2021 9. Corrective action needed: 10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion, however there are some bare areas that need to be repaired and stabilized along perimeter slopes and within basins. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT) unless permit approval date was prior to April 1 st 2019. The NOT is available at: https:Hedocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Jeffrey Chandler Others present: Date of inspection: August 12, 2021 Time arriving on site: 2:45 PM Time leaving site: 3:00 PM cc: Yes