Loading...
HomeMy WebLinkAboutNCS000482_SWMP_20210823City of 1Monroe Engineering AUG 23 2021 DENR'LAND SLITy TORAIWATER p RMITTINC City of Monroe, North Carolina S'tormwater Management Program Report Prepared By: The City of Monroe Engineering Department October 2011 Review and Updates: December 2013 December 2014 April 2016 August 2021 Table of Contents Page 1. Storm Sewer System Information.................................................................................... 4 1.1 Population Served.............................................................................................. 4 1.2 Growth Rate..................................................................................................... 4 1.3 Jurisdictional and MS4 Service Area........................................................................ 4 1.4 MS4 Conveyance System..................................................................................... 4 1.5 Land Use Composition Elements............................................................................ 4 1.6 TMDL Identification........................................................................................... 4 2. Receiving Streams......................................................................................................... 5 3. Existing Water Quality Programs..................................................................................... 7 3.1 Local Programs.................................................................................................. 7 3.2 State Programs.................................................................................................. 7 4. Permitting Information.................................................................................................. 8 4.1 Responsible Party Contact List............................................................................... 8 4.2 Organizational Chart ............................................................................................ 11 4.3 Signing Official.................................................................................................. 13 5. Co -Permitting Information............................................................................................. 13 6. Reliance on Other Government Entity to Satisfy One or More Permit Obligations ...................... 13 7. Stormwater Program Management Plan............................................................................ 13 7.1 Public Education and Outreach on Storm Water Impacts ................................................. 13 7.1.1 BMP Summary Table................................................................................ 13 7.1.2 Target Audience...................................................................................... 13 7.1.3 Target Pollutant Sources............................................................................ 14 7.1.4 Outreach Program.................................................................................... 14 7.1.5 Evaluation............................................................................................. 14 7.2 Public Involvement and Outreach............................................................................ 14 7.2.1 BMP Summary Table............................................................................... 14 7.2.2 Target Audience...................................................................................... 14 7.2.3 Participation Program................................................................................ 15 7.2.4 Evaluation............................................................................................. 15 7.3 Illicit Discharge Detection and Elimination................................................................. 15 7.3.1 BMP Summary Table................................................................................ 15 7.3.2 Storm Sewer System Map........................................................................... 15 7.3.3 Regulatory Mechanism.............................................................................. 15 7.3.4 Enforcement.......................................................................................... 15 7.3.5 Detection and Elimination........................................................................... 16 7.3.5.1 Procedures for Locating Priority Areas .................................................. 16 7.3.5..2 Procedure for Tracing the Source of the Illicit Discharge ........................... 16 7.3.5.3 Procedures for Removing the Source of the Illicit Connection ..................... 16 7.3.5.4 Procedures for Evaluation of Illicit Connection and Discharge Component ...... 16 7.3.6 Non Stormwater Discharges........................................................................ 17 7.3.7 Outreach............................................................................................... 17 2 7.3.8 Staff Training......................................................................................... 17 7.3.9 Evaluation............................................................................................. 17 7.4 Construction Site Stormwater Runoff Control.............................................................. 18 7.4.1 BMP Summary Table................................................................................ 18 7.4.2 Regulatory Mechanism.............................................................................. 18 7.4.3 Plan Reviews.......................................................................................... 18 7.4.4 Enforcement........................................................................................... 18 7.4.5 Inspections............................................................................................. 18 7.4.6 Public Information.......................................................................:............ 19 7.4.7 Evaluation............................................................................................. 19 7.5 Post -Development Stormwater Management in New Development and Redevelopment ............ 19 7.5.7 BMP Summary Table............................................................................... 19 7.5.8 Non -Structural BMP's.............................................................................. 19 7.5.9 Structural SCM's..................................................................................... 19 7.5.10 Regulatory Mechanism........................................................... ................... 20 7.5.11 Operation and Maintenance......................................................................... 20 7.5.12 Natural Resource Protection........................................................................ 20 7.5.13 Open Space Protection.............................................................................. 20 7.5.14 Tree Preservation.................................................................................... 20 7.5.15 Development in Areas with Existing Infrastructure ............................................. 20 7.5.16 Mixed -Use Development............................................................................ 20 7.5.17 Street Design........................................................................................... 20 7.5.18 Reduce Parking Requirements...................................................................... 21 7.5.19 Minimizing Stormwater from Parking Lot ........................................................ 21 7.5.20 Green Infrastructure Practices...................................................................... 21 7.5.21 Evaluation............................................................................................. 21 7.6 Pollution Prevention / Good Housekeeping for Municipal Operations .................................. 21 7.6.1 BMP Summary Table............................................................................... 21 7.6.2 Affected Operations.................................................................................. 22 7.6.3 Training................................................................................................ 24 7.6.4 Maintenance and Inspections........................................................................ 24 7.6.5 ............................... Vehicular Operations ................................ ................. 24 7.6.6 Waste Disposal....................................................................................... 24 7.6.7 Flood Management Projects........................................................................ 25 7.6.8 Existing Ordinances................................................................................. 25 7.6.9 Evaluation............................................................................................ 25 8.0 Contract Operations.............................................................................................. 25 Appendix A — BMP Summary Table....................................................................................... 26 Appendix B — Erosion and Sedimentation Control....................................................................... 32 Appendix C — Stormwater Management Ordinance....................................................................... 33 Appendix D — Sanitary Sewer Connections................................................................................ 34 3 City of Monroe Stormwater Management Program Report 1. Storm Sewer System Information 1.1 Population Served Permanent Population: 35,311 Seasonal: 0 Basis of Information: NC Office of Budget and Management 1.2 Growth Rate: 3.5% Annual 1.3 Jurisdictional and MS4 Service Areas Municipal: 31.04 square miles Extraterritorial Jurisdiction: 9.5 f square miles 1.4 MS4 Conveyance System: The City of Monroe Stormwater System consists of a combination of piping, ditches, and sheet flow. Within the City of Monroe are located two water supply watersheds feeding two lakes — Lake Lee, classified as a WS-IV watershed, and Lake Twitty, classified as a WS-III watershed. The City of Monroe's Stormwater Management Ordinance requires structural SCM's on all new development and redevelopment sites to control the stormwater discharge quality and quantity leaving the site. 1.5 Land Use Composition Estimates: Residential: 40% Commercial: 30% Industrial: 15% Open Space: 15% 1.6 TMDL Identification: No TMDL allocation presently exists for any streams within the City of Monroe (aside from the statewide TMDL for Mercury). 4 2. Receiving Streams - Primary Streams Table 1. Water * Use IR Receiving Stream Stream Segment Quality Support Water Quality category Name Classific Rating Issues (2020) ation Yadkin River Basin Richardson Creek 13-17-36-(3.5) WS-�' Chlorophyll a (40 (Lake Lee) Entire Reservoir CA I µg/1, AL, NC) 5 106.4 FW Acres 13-17-36-(5)ala Richardson Creek From Monroe Water Supply Dam C I Benthos Fair (NAR, 5 (Lake Lee) to Stewarts Creek AL, FW) 6.4 FW Miles C 13-17-36-4-(2) Chlorophyll a (40 Richardson Creek From a point 0.6 mile upstream of WS-IV; I µg/1, AL, NC) 5 (Lake Monroe) Buck Creek to Richardson Creek CA 38.7 FW Acres 13-17-36-4-(0.5) Chlorophyll a (40 Richardson Creek From source to a point 0.6 mile WS-IV I µ� 1' AL' NC) 5 (Lake Monroe) ** upstream of Buck Branch 77.1 FW Acres 13-17-20-2B Benthos Poor (Nar, South Fork From source to SR 1515 to Crooked C I AL F 5 Crooked Creek Creek 5 13-17-36-9-(1) From source to a point 0.4 mile Stewarts Creek downstream of mouth of Stumplick WS-III I Benthos Fair (NAR, 5 Branch AL, FW) 8.3 FW Miles 13-17-36-9-(4.5) From a point 0.4 mile downstream of Chlorophyll a (40 Stewarts Creek mouth of Stumplick Branch to Union WS-III; I µg/1, AL, NC) 5 (Lake Twitty) County SRI681 (City of Monroe CA Intake supply) 131.1 FW acres 13-17-36-6 Bearskin Creek Source to Richardson C ND 9.7 miles Horsepen Branch 13-17-36-6-1 C ND Camp Branch 13-17-36-6-2 C ND Dry Fork 13-17-36-6-3 C ND East Fork Stewarts 13-17-36-9-2 WS-III ND Creek Lick Branch 13-17-36-9-3 WS-III ND Stumplick Branch 13-17-36-9-4 WS-III ND Catawba River Basin East Fork — 12 Mile Unknown C ND Creek ,Tributary 3 East Fork — 12 Mile Unknown C ND Creek, Tributary 5 * NR = Not Rated * ND = Not Determined * I = Impaired, Category 5 ** not within City Limits 3a Not Rated Parameter assessment is Not Rated due to insufficient or inconclusive data. 4t Impaired Parameter assessment is impaired and there is an approved TMDL for the parameter Exceeding Criteria, approved TMDL for assessed parameter 5 Impaired Parameter assessment is impaired and a TMDL development is required for the parameter Exceeding Criteria, no approved TMDL in place for assessed parameter rol 3. Existing Water Quality Programs 3.1 Local Programs 3.1(a) Stormwater Management Ordinance The City of Monroe administers a Stormwater Management Ordinance to control stormwater pollutants as well as increased stormwater volume and velocity from new development and redevelopment sites so that water quality is protected and downstream flooding is reduced. The ordinance requires a stormwater control measure (SCM) for all development and redevelopment within the corporate limits or in the extraterritorial jurisdictions within the City of Monroe. Zoning requirements also require buffers along designated streams to help retain stream water quality along developing sites. 3.1(b) Erosion and Sedimentation Control Program The City of Monroe was delegated the responsibility of administering its own Erosion and Sedimentation Control Program in June 2002. The policy parallels the State of North Carolina requirements with some modifications which include a maximum of 12,000 s.f. of disturbed area without a grading permit. The City of Monroe enforces the program through an inspection and plan review process, as well as issuing fines and citations for violations. 3.1(c) Stormwater System Repair Program The City of Monroe offers private citizens the opportunity to correct or repair problem areas on private property due to public runoff. The City provides the necessary labor, equipment, and repair materials to qualifying projects. 3.2 State Programs 3.2(a) Stormwater Control Measure Stormwater Control Measure required for post -construction related sites follow the requirements of the N.C. Department of Environmental Quality. 3.2(b) Clean Water Act of 1977 The City of Monroe, in accordance with the Clean Water Act of 1977, requires Developers/Contractors to acquire Section 401 permits for various activities related to stream and wetland water quality. 7 ,m 4. Permitting Information 4.1 Responsible Party Contact List BMP and Measurable Goals Contact Person Position Phone # Fax # Email Address Public Education and Outreach I Distribute brochures to groups and citizens Ellen Dowling Environmental Educator (704) 282-4538 (704) 282-4735 edowling-(a,monroenc.org 2 Classroom presentation Ellen Dowling Environmental Educator (704) 282-4538 (704) 282-4735 edowline ,monroenc.or_g 3 Maintain City website with stormwater information Ellen Dowling Environmental Educator (704) 282-4538 (704) 282-4735 edowling(a monroenc.org 4 Work with Regional Stormwater Partnership of the Carolina Chris Costner Stormwater Engineer (704) 2824537 (704) 282-4735 ccostner �monroenc.org Public Involvement and Partici ation l Conduct a Public meeting on the Stormwater Management Plan Sarah McAllister Director of Engineering (704) 282-4532 (704) 282-4735 smcallister(a,monroenc.ore 2 Organize and Administer a Public Involvement Program Ellen Dowling Environmental Educator (704) 282-4538 (704) 282-4735 edowling_(a,monroenc.org 3 Promote and Maintain Stormwater Hotline Ellen Dowling Environmental Educator (704) 282-4538 (704) 282-4735 edowling[a,monroenc.org Illicit Discharge and Elimination 1 Train and coordinate with other departments to report illicit connections Ellen Dowling Environmental Educator (704) 282-4538 (704) 282-4735 edowling(a,monroenc.ore 2 Prepare and distribute brochures to the public educating them on illicit connections Ellen Dowling Environmental Educator (704) 2824538 (704) 2824735 edowling-(&monroenc.org 3 Provide for public involvement to report illicit connections Ellen Dowling Environmental Educator (704) 282-4538 (704) 282-4735 edowling(dmonroenc.org 4 Identify person to follow-up on reports Heather Freeman Stormwater Compliance Coordinator (704) 282-4535 (704) 282-4735 hfreeman(a,monroenc.org 5 Develop and implement an Illicit Discharge and Elimination Program Heather Freeman Stormwater Compliance Coordinator (704) 282-4535 (704) 282-4735 hfreeman(a,monroenc.org 6 Maintain and update the map of Heather Freeman Stormwater Compliance (704) 2824535 (704) 2824735 hfreeman@monroenc.org Stormwater Outfalls Coordinator Track and document the Stormwater 7 investigation and enforcement of Heather Freeman Compliance (704) 2824535 (704) 2824735 hfreeman(amonroenc.org illicit discharges Coordinator Construction Site Stormwater Runoff Control I Sites will comply with City of Chris Easterly Land Development and Infrastructure 704-282-4529 (704) 282-4735 CEasterlv(a monroenc.orQ Monroe Erosion Control Ordinance Engineer 2 Pre -construction Meeting Sam Starnes Erosion Control Inspector (704) 2824583 (704) 2824735 sstarnes(a,monroenc.org 3 Monthly Site Inspection Sam Starnes Erosion Controlrosion (704) 2824583 (704) 2824735 sstarnesAmonroenc.org 2 3 4 12 13 4 Post Construction Site Runo New Development and Redevelopment sites will abide by the City of Monroe Stormwater Management Ordinance and 15A NCAC 2H.1000 Review annual inspection reports from owners of stormwater facilities Buffers along Streams Enforcement Pollution Prevention / Good H, Maintain inventory of Municipal owned or operated facilities. Supervise implementation and updating of Stormwater Pollution Prevention Plans at City owned municipal operations BMPs to reduce polluted runoff from Streets, Roads, and Public parking lot maintenance O&M for municipal owned or maintained catch basins and Controls Chris Costner I Stormwater Engineer 1 (704) 282-4537 1 (704) 282-4735 1 ccostner(&monroenc.org Stormwater Heather Freeman Compliance Coordinator Chris Costner Stormwater En Chris Costner Stormwater En 7usekeeping or Municipal a Stormwater Heather Freeman Compliance Coordinator Stormwater Heather Freeman Compliance Coordinator Johnny Faulk Streets Superintendent Johnny Faulk Streets Superintendent (704)282-4535 (704)282-4735 (704)282-4537 (704)282-4735 (704)282-4537 (704)282-4735 hfreeman(&monroenc.orQ (704) 282-4535 1 (704) 2824735 1 hfreemanAmonroenc.org (704) 2824535 1 (704) 282-4735 1 hfreeman(a,monroenc.org (704) 282-4553 1 1 jfaulk ,monroenc.org (704) 282-4553 I Odeaton@monroenc.org Maintain list of municipal owned Stormwater 5 or maintained structural Heather Freeman Compliance (704) 282-4535 (704) 282-4735 hfreeman@monroenc.org stormwater controls measure Coordinator 6 Pesticide, Herbicide and fertilizer Heather Freeman Stormwater Compliance (704) 2824535 (704) 282-4735 hfreemanAmonroenc.org application management Coordinator Distribute pollution prevention Environmental 7 training materials for public Ellen Dowling Educator (704) 282-4538 (704) 282-4735 edowling_(dmonroenc.org facilities Provide training for those employees who maintain the Stormwater 8 public facilities on proper disposal Heather Freeman Compliance (704) 2824535 (704) 2824735 hfreemanAmonroenc.org procedures and inspection of Coordinator public facilities Prevent or minimise Stormwater 9 contamination of stormwater runoff form areas used for vehicle Heather Freeman Compliance (704) 2824535 (704) 2824735 hfreeman@monroenc.org and equipment cleaning Coordinator Evaluate spill response program Stormwater 10 and determine effectiveness on minimizing impacts iv Heather Freeman Compliance (704) 282-4535 (704) 282-4735 hfreemanAmonroenc.org stormwater quality Coordinator 0 4.2 Organizational Chart: Mayor and City Council Bobby Kilgore, Mayor City Attorney' Mujeeb Shah -Khan • Appointed by City Council " Appointed by City Council, but reports to City Manager JCITy42j City Manager' Lary Faison City Clerk " Airport Manager Bridgette Robinson Peter Cevallos Director of Communucation and Tourism Executive Director of Economic Development Pete Hovanec W Chris Plate' Director of Energy Services David Luccre Fire Chief Ron Fowler Director of Information Technology Bruce Bounds Director of Water Resources Russ Colbath Director of Finance Lisa Strickland Director of Human Resources Debra C.Reed Chief of Police Bryan billiard Assistant City Attorney Ashley Britt Assistant City Manager Brian Borne Downtown Director Matthew Black Director of Engineering Sarah McAllister Director of Parks and Recreation Tonga Edwards Director of Planning and Development Lisa Stiwinter Revised 7/7/2021 Org charts distributed Land Development Stormwater & Infrastructure Engineer Engineer Erosion Control Star'lnWater Plan Review Engineering Associate Construction Sormwater 1:Coordinator Inspector II mpince Erosion Control Stormwater Inspector (Eng. Engineering Tech. II) Tech. II Infrastructure Stormwater Technician (Eng. Engineering Tech. II) Tech. II Plat Review / Environmental Addressing Educator Tech. I(Eng. Director of Engineering Administrative Assistant II Solid Waste Coordinator GIS — Engineering Technician II Solid Waste Technician Crew Leader Il Stormwater Maintenance Street Superintendent . Administrative �� Street Sign Assistant II Specialist Crew Leader I Crew Leader 1 Special Projects Concrete Equipment F Equipment Equipment erator II i Operator I Operator H Stormwater Street Maintenance Street Sweeper Maintenance Worker II Worker II Stormwater Street Maintenance Street Sweeper Maintenance Worker II Worker II Stormwater Maintenance Worker II Equipment Operator II Crcw Leader II' Crew Leader 11 Asphalt Asphalt Maintenance Reclamation Equipment Equipment Operator I Operator I Street Street Maintenance Maintenance Worker II Worker II Street Street Maintenance Maintenance Worker II Worker II 4.3 Signing Official: Ranking Elected Official: Mayor Name: Bobby G. Kilgore The City Charter of the City of Monroe designates the Mayor as the official head of the City government. 4.4 Duly Authorized Representative: N'A 5. Co -Permitting Information (if applicable) N/A 6. Reliance on Other Government Entity to Satisfy One or More Permit Obligations None 7. Stormv,,ater Management Program Plan 7.1 Public Education and Outreach on Storm Water Impacts 7.1.1 BMP Summary Table (See Appendix A for Further Information) 1.) Distribute brochures to groups and citizens at various events including neighborhood meetings and public events 2.) Present storm water information to students and teachers 3.) Maintain City website with stormwater information 4.) Continue to work with Regional Stormwater Partnership of the Carolinas to promote good stormwater practices at both the local and regional levels. 7.1.2 Target Audience: The target audience for this measure will be the general public ranging from homeowners to students to business owners. The Spanish-speaking and other non-English speaking communities will be included as well. 13 7.1.3 Target Pollutant Sources: 1.) Oils and Greases: Petroleum products can suffocate living organisms and cause harmful secondary chemical compounds, as well as clog sewer lines and harm equipment. 2.) Trash: Trash can clog sewer lines and cause hazardous water blockages. 3.) Sediment: Sediment can clog storm pipes and suffocate wildlife in the creeks and streams by invading the gills of fish and destroying habitat areas. 4.) Herbicides/Pesticides: Specific chemicals are toxic to different species of wildlife and plant life. Runoff into the storm system can carry these chemicals into the streams and creeks. 5.) Nutrients: Excess nutrient can cause algae and bacteria blooms in our lakes and streams. Algae will consume oxygen, increase turbidity in the water body and eventually die along with the fish and other aquatic life that need oxygen to live. In addition, excess nutrient can lead to taste and odor in the drinking water. 7.1.4 Outreach Program: Information concerning public education will be distributed at neighborhood meetings, classroom presentations, public events, by word-of-mouth, fliers, brochures and the City's website. The number of citizens reached by these methods is expected to be in the order of 1,000 people at neighborhood meetings and public events and 15,000 people with utility billing. 7.1.5 Evaluation: A count of the number of people that attend educational events of the effectiveness of the program. In addition, positive response from the general public includes citizens. 7.2 Public Involvement and Participation 7.2.1 BMP Summary Table (See Appendix A for Further Information) 1.) Conduct a Public Meeting on the Stormwater Management Plan 2.) Maintain and promote the stormwater Hotline 3.) Coordinate volunteer community involvement programs a. Storm Drain Marking b. Adopt -A -Stream Program c. Volunteer Water Quality Monitoring 14 7.2.2. Target Audience: The general public will be the target audience. Civic groups will be encouraged to participate, as well as any other concerned citizens group. 7.2.3 Participation Program: A public meeting will be held by the Public Enterprise Committee to allow the general public to comment on the Stormwater Management Plan and the associated program. Civic and neighborhood group members will be encouraged to volunteer to participate. They will also be encouraged to get involved in the various volunteer programs. 7.2.4 Evaluation: Attendance and involvement in various stormwater events and volunteer programs will gauge the effectiveness of the measure. 7.3 Illicit Discharge Detection and Elimination 7.3.1 BMP Summary Table (See Appendix A for Further Information) 1.) Train and coordinate with other departments to report illicit connections. 2.) Continue to distribute brochures to the public educating them on illicit connections. 3.) Continue to provide for public involvement to report illicit connections. 4.) Develop and implement a program to conduct dry weather flow Illicit Discharge detection program. 7.3.2 Storm Sewer System Map: The City of Monroe currently has maps depicting the location of storm sewer system pipes and appurtenances in a GIS format. The maps also indicate creek and stream names. The maps were developed utilizing a GPS surveying system. As new systems are added or existing systems are amended, the map will be updated utilizing the GPS surveying system. 7.3.3 Regulatory Mechanism and Annual Review: The City of Monroe will continue to use the existing Section 159-701 Illicit Discharges and Connections of the Stormwater Management ordinance that addresses cross connections and discharges into the stormwater system. 7.3.4 Enforcement: The Section 159-701 Illicit Discharges and Connections of the Stormwater Management ordinance makes it a violation to cause or allow the discharge, emission, disposal, pouring, 15 pumping, or connect directly or indirectly to any stormwater conveyance, the waters of the State, or upon the land in any manner for purposes of discharging anything other than stormwater runoff into the system. The language in the ordinance contains, as a minimum, that a notification will be issued to the owner outlining the procedures for remediation and consequences for non-compliance. 7.3.5 Detection and Elimination: The City will continue to use existing City personnel, citizens and civic groups to detect illegal discharges and connections to stormwater conveyance systems through the Illicit Discharges and Connections program. Inspections and evaluations will be conducted during dry weather periods when illegal flows will be most obvious, or in response to reports received from city personnel or the general public. 7.3.5.1 Procedures for Locating Priority Areas: Those areas where parcels are not yet connected to public sewer and depend upon septic systems will be examined on maps. Inspection of older existing sanitary sewer lines by the Water Resources Department will help identify those areas where a potential for cross contamination could occur. The public at large will be provided the ability to report illicit connections. Employees will be trained in the use of detection methods. 7.3.5.2 Procedures for Tracing the Source of the Illicit Discharge: The City will use various methods to trace the source of the illicit discharge including but not limited to visual inspection, field screening, and TV the stormwater system as required. 7.3.5.3 Procedures for Removing the Source of the Illicit Discharge: The Illicit Discharges and Connections ordinance gives the City the authority to remove illegal connections and discharges. City employees are given the authority to enter upon private property for purposes of inspection and empowered to issue fines and Notice of Violations. 7.3.5.4 Procedures for Evaluation of Illicit Connection and Discharge Component: An annual review of the illicit connection detection program by City staff will gauge its effectiveness. The effectiveness will be measured by comparing the number and type of illicit connection identified and corrected during the reporting period. 16 7.3.6 Non Stormwater Discharges: Activity Allowed Not Allowed Water Line Sampling and Flushing X Landscape Irrigation X Diverted Stream Flows X Rising Ground Water X Uncontaminated Ground Water Infiltration * X Uncontaminated pumped ground water X Discharges from Potable Water Sources X Foundation Drains X Air Conditioning Condensation X Irrigation Water ** X Springs X Water from Crawlspace Pumps X Footing Drains X Lawn Watering X Individual Residential & Charity Car Washing X Flows from Riparian Habitats & Wetlands X Dechlorinated Swimming Pool Discharges X Street Wash Water X Flows from Emergency Fire Fighting X * As defined at 40 CFR §35.2005(20) ** Does not include reclaimed water as defined at 15A NCAC 2H .0200 7.3.7 Outreach: The public will be notified through the Public Education and Outreach Program about the hazards and potential effects of illegal connections. Internal training programs for City employees will be presented via the Pollution Prevention / Good Housekeeping Program. 7.3.8 Staff Training: Internal training programs for City employees will be presented via the Pollution Prevention / Good Housekeeping Program. As part of the internal training program, City employees will be informed on what City Department to call to report any illicit discharge or connection. 7.3.9 Evaluation: Measurement of the success of this program will be defined by the quality and quantity of the stormwater at the outfalls. A secondary measurement will be the number of illicit connections discovered and removed. 17 7.4 Construction Site Stormwater Runoff Control 7.4.1 BMP Summary Table: See Appendix A. 7.4.2 Regulatory Mechanism: Per the City of Monroe Ordinance, Title XV: Land Usage, Chapter 158: Erosion and Sedimentation Control, a grading permit is required for sites disturbing an area equal to 12,000 s.f. or more. The City of Monroe was delegated in June 2002 to review and enforce its own Sedimentation and Erosion Control Program. Copies are attached in Appendix B. 7.4.3 Plan Reviews: A grading plan for the site is prepared by a qualified professional and presented to the City of Monroe for review of erosion control measures. Site plans are also given to the Planning and Development Department for review of required natural buffers along streams, if applicable. Nonresidential sites disturbing 12,000 s.f. or more of area are required to obtain a grading permit. While residential sites disturbing one acre or more are required to obtain a grading permit. Single-family lot disturbing less than 1 acre must submit a Maintenance Agreement. Non-residential sites disturbing less than 12,000 sf. must submit a non-residential Installation and Maintenance Agreement. 7.4.4 Enforcement: The current Erosion and Sedimentation Control Ordinance provides for penalties to be assessed when site inspections reveal violations. If a site is in violation, a Notice of Violation is sent to the responsible party explaining the violation, which contains a remedy date by which corrections are to be made, and a warning that failure to comply can result in civil or criminal penalties. 7.4.5 Inspections: Construction sites are inspected as required. Those sites disturbing the greatest area and could pose a threat to adjoining streams and creeks are inspected first and more often. Commercial sites are inspected at least once per month or more frequently depending upon site deficiencies and rainfall events. Items are inspected as presented on the approved erosion control plan and, if needed, revision may be required to the approved plans and initiation of the revision for compliance. 7.4.6 Public Information: The Erosion and Sedimentation Control Ordinance was presented to City Council for approval and open to public discussion. As new amendments are made, the public will have the opportunity to comment. 18 7.4.7 Evaluation: The success of this program will be measured by the number of projects with sediment leaving the construction sites and the number of Notice of Violation (N.O. V.) issued and fines levied. 7.5 Post -Construction Site Runoff Controls 7.5.1 A copy of the City of Monroe Stormwater Management Ordinance is attached. See Appendix C. 7.5.2 Maintenance requirements of the SCM's are included in the Stormwater Management Ordinance. See Appendix C. 7.5.3 The City of Monroe owns and maintains its own wastewater collection system with non-sewered areas served by septic systems, as per City of Monroe Ordinance Title V, Chap. 52, § 52.010. See Appendix D. 7.5.4 No surface waters within the City of Monroe drain into SA waters. 7.5.5 No surface waters within the City of Monroe drain into TR waters. 7.5.6 No surface waters within the City of Monroe drain into Nutrient Sensitive waters. 7.5.7 BMP Summary Table: See Appendix A. 7.5.8 Non -Structural BMP's: 7.5.8.1 Zoning Ordinances for land development requires that proper vegetative buffers be placed or existing ones be maintained, along designated streams. Other measures include requirements for open space and landscaped areas in commercial and multi -family projects. 7.5.8.2 Interconnectivity of impervious surfaces is discouraged by requiring internal landscaped areas within project sites. 7.5.8.3 Conduct developer/contractor forums to address concerns with construction, inspection and long term maintenance of structural best management practices. 7.5.9 Structural SCM's: 7.5.9.1 Current water quality practices allow the use of wet detention ponds, in addition to those contained in the "Stormwater Design" manual by the N.C. Department of Environmental Quality (NC DEQ). 19 7.5.10 Regulatory Mechanism: In October 2007, the City of Monroe adopted a Stormwater Management ordinance that addresses post - construction runoff from new development and redevelopment. Attached is a copy of the City of Monroe Stormwater Management Ordinance. See Appendix B. 7.5.11 Operation and Maintenance: Permitted SCM's will be inspected annually by the owner and / or his representative and a report prepared by a qualified professional shall be submitted to the City of Monroe Engineering Department. 7.5.12 Natural Resource Protection: Land Development Plan requires a 50-foot undisturbed buffer along all perennial and intermittent streams in conditional districts and a 35-foot undisturbed buffer along all other perennial and intermittent streams. 7.5.13 Open Space Protection: Zoning Ordinances for land development requires thatl2.5% of the gross area of the development tract be dedicated to open space. 7.5.14 Tree Preservation: 7.5.14.1 Section 156.221 Tree Preservation in the Zoning Ordinances for land development requires that deciduous and evergreen trees be preserved to the greatest extent possible. 7.5.14.2 Section 156.221 Tree Preservation in the Zoning Ordinances for land development requires that a tree preservation plan be submitted prior to any land disturbing activities. The tree preservation ordinances include a section on tree protection and preservation during construction. 7.5.15 Development in Areas with Existing Infrastructure: Land Development Plan encourages industries to locate in areas already served by adequate infrastructure, such as sewer, water, natural gas, and roads. 7.5.16 Mixed -Use Development: Land Development Plan map and Downtown Master Plan for the Downtown Area designate specific areas of the city for Mixed -Use Development. 7.5.17 Street Design: The Unified Development Ordinance and Land Development Plan encourage rear garages and alleys. 20 7.5.18 Reduced Parking Requirements: The developer/builder is to determine the required parking spaces according to the Land Development Plan and the Unified Development Ordinance. 7.5.19 Minimizing Stormwater From Parking Lot: The Unified Development Ordinance requires landscaped planted areas within or adjacent to the parking area as tree islands, at the end of parking bays, inside seven (7) foot wide or greater medians, or between rows of cars. 7.5.20 Green Infrastructure Practices: Stormwater Management application and plans are required to be submitted prior to an applicant receiving their Erosion and Sediment Control permit. In addition, a developeribuilder cannot receive their Certificate of Occupancy until Stormwater Management requirements are met including but not limited to stormwater maintenance agreement(s), stormwater control measure(s), as -built and post -construction checklist. 7.5.21 Evaluation: The effectiveness of this measure will be determined by the success of obtaining a higher degree of water quality in the lakes and streams. 7.5.21 Enforcement: Notice of violations are tracked. 7.6 Pollution Prevention / Good Housekeeping for Municipal Operations 7.6.1 BMP Summary Table. See Appendix A. 1) Distribute pollution prevention training materials to those employees who maintain the public facilities on the principals of good housekeeping and how improper maintenance can be detrimental to the waterways. 2) Provide training for those employees who maintain the storm sewer systems with emphasis on disposal of sediments and other solids removed from the systems. 3) Provide training on the use of herbicides and other chemicals and how they can enter the storm systems through improper application. 4) Inspect street operations facility to ensure that all stored chemicals are properly contained and any spill potential is minimized. 5) Inform vendors with City contracts to practice good site housekeeping. 6) Review the current spill response program for its effectiveness and adjust accordingly. 7) Review and evaluate the effectiveness of the street sweeping program and adjust accordingly. 8) Review municipality owned or operated regulated industrial activities. 21 7.6.2 Affected Operations: Major Significant Facilities Major Significant Facilities No. Name Comments 1 Street Division Center 2 Landscape Maintenance facility 3 Operations Center & City Garage 4 Fire Stations Five stations 5 Fire training center 6 Energy Services 7 Monroe Country Club and driving range 8 Water Treatment Plant 9 Monroe Aquatic and Fitness Center 10 Charlotte Monroe Executive Airport 11 Wastewater Treatment Plant Minor facilities No. Name Comments 1 Belk Tonawanda Park 2 Creft Park 3 Dickerson Park 4 Don Griffin Park (Jaycee Park) 5 Ellen Fitzgerald Senior Center 6 J. Ray Shute Center 7 Old Armory Community Center 8 Parks William Complex 9 Sunset Park 10 Sutton Park 11 Winchester Center 12 Gateway Park 13 Lake Twitty Boathouse 14 Lake Lee Boathouse 15 Lake Monroe 16 Sunset Cemetery 17 Hillcrest Cemetery 17 Police Shooting Range 18 Gasoline Fueling Facility 22 Parking Lots only No. Name Comments 1 City Hall 2 Hotel Joffree Parking Lot 3 Church Street Parkin lot (Correll & the Bain 4 Church Street Parkin Lot (RR Tracks) 5 Customer Service 6 Main Street Parkin Lot (Belk) 7 Main Street Parkin Lot (Correll) 8 Parking Lot at Hayne & Crowell 9 Parking Lot at Franklin & Church 10 Parking Lot on Morgan at Hayne St 11 Old City Hall 12 Science Center 13 Dowd Center Theater 14 Fire / Police Station Minor Facilities No. Name Comments 1 Sewer Pump Stations: Stitt Street Stewarts Creek East Avenue Alda Drive Sunset Lane Charlotte Ave Tower Industrial Unionville Indian Trial Rd & Rocky River Hillsdale Euclid St. Buckhill 200 South Myers Meadows Bakers Typar 200 North Glendalough Kimberly Ct 2 Electric Substations: 601 S Camp Sutton Goldmine Road Hale Coan Substation 23 Airport (by Allvac) Allvac 1 Bakers (inside Allvac) Allvac 2 Icemorlee Police Substation Maurice St. Police Substation 3 Gas Facilities Morgan Mill Site 150 and 160 City Gate Station 4 Water Tanks: Airport Camp Sutton Goldmine Rd. Nelson heights Patten Ave. Rocky River 7.6.3 Training: An employee training video will be utilized to emphasize best management practices. Flyers and handouts, along with the City of Monroe's Employee Guide to Prevent Stormwater Pollution, will be distributed to employees emphasizing the need for good housekeeping practices. Other government training materials will be sought out and used. Specialty training will be provided on a case -by -case basis through the use of seminars and other educational opportunities through outside agencies. 7.6.4 Maintenance and Inspections: Street sweeping will constitute the major thrust toward keeping solid debris from entering the MS4 system, along with solids collection during trash pick-up times. Uptown streets and sidewalks are swept at least once per week, while streets with curb and gutter are swept at least 5 times per year and all other streets at least twice per year. Garbage is collected throughout the City weekly. Presently, the Street Division inspects and maintains the storm sewer system after each rainfall event and on as as -needed basis. The City's stormwater utility program enables the stormwater maintenance crews to repair private drainage systems that receive public runoff. All tanks, valves, pumps, pipes, and other equipment related to the distribution of water resources and energy services are inspected and maintained on a daily or weekly basis by their respective Department. 7.6.5 Vehicular Operations: City parking lots are swept as needed. Road salt is stored within a covered storage facility. 7.6.6 Waste Disposal: Solids removed from the MS4 system are transported to the Street Division Facility for pick up by the solid waste disposal contractor. Larger loads are transported to the County transfer station for disposal. 24 7.6.7 Flood Management Projects: Flood management projects are designed with N.C. Department of Environment and Natural Resources requirements, as well as U.S. Army Corps of Engineers requirements. 7.6.8 Existing Ordinances: The following City ordinances were identified as having impacts on water quality: 1) Title XV, § 158.05 — Erosion and Sedimentation Control 2) Title VII, § 71.20 — Spilling or Tracking of Crushed Rock, Dirt, Garbage, Liquids, Trash, and Other Objectionable Material 3) Title IX, Public Health Nuisances 4) Title V, Chapter 55 — Solid Waste 5) Title V, Chapter 52 — Waste Water 6) Title V, Chapter 53 — Water Distribution System 7.6.9 Evaluation: The success of this measure will be evaluated through the responsiveness of the employees to new BMP's. Documentation of activities related to housekeeping practices will measure the extent of the program. 8. Contract Operations Contract operations including but not limited to solid waste pickup, pesticide applications, construction contracts include language in the agreement requiring contractors and subcontractors to meet all Applicable laws. Formal contract agreements are kept on file in the City Clerk's office with the respective department responsible for record retention of all informal agreements. 25 Appendix A BMP SUMMARY TABLE 26 1. BMP's and Measurable Goals for Public Education and Outreach BMP Measurable Goals Responsible Position Brochures will also be available at city hall. In addition, 1 Distribute brochures to brochures will be available at neighborhood meetings Environmental Educator groups and citizens and city events. The number published and distributed will be recorded. Students and teachers will be presented the impacts of 2 Classroom presentation stormwater pollution and what can be done to reduce Environmental Educator impacts. Number of students and teachers presented the information will be tracked. Maintain the City website to include information on stormwater related issues, phone numbers to use for 3 Maintain the City website incident reporting and current stormwater activities Environmental Educator taking place. A counter will be used to track the number of requests or hits. Regional Stormwater Continue to work the Regional Stormwater Partnership 4 Partnership of the Carolina of the Carolina to promote good stormwater practices at Stormwater Engineer both the local and regional level. 2. Public Involvement and Participation BMP Measurable Goals Responsible Position Conduct a Public Meeting provide public an opportunity to comment on the 1 on the Stormwater Stormwater Management Program Engineering Director Management Program Public Enterprise Utilize the Public Enterprise Committee for input on 2 Committee stormwater issues and the stormwater management City Council program. Continue to provide an opportunity for civic and volunteer group to participate in the Storm Drain Marker program. Continue to administer the 3 Public Involvement and Promote the Adopt -A -Stream program and coordinate Environmental Educator Participation Program(s) creek clean-ups. Develop and coordinate a local Volunteer Water Monitoring Program 4 Promote and Maintain Promote and maintain Stormwater Hotline for public Environmental Educator Stormwater Hotline input and reporting. 27 3. Illicit Discharge Detection and Elimination BMP Measurable Goals Responsible Position Train and coordinate with Distribute information to other City departments 1 other departments to report outlining the methods used to detect and identify illicit Environmental Educator illicit connections connections Distribute brochures to the Notification to the public via brochures outlining illicit 2 public to educate them on connections. A count of the quantity sent out will Environmental Educator illicit connections indicate the BMP's effectiveness. Provide for public Continue to provide the public with a means of Stormwater Compliance 3 involvement to report illicit reporting illicit connections or illegal dumping activities Coordinator connections via tele hone and/or the city web a e 4 Identify person to follow- Continue to provide an annual report outlining the Stormwater Compliance up on reports amount of reported and identified illicit connections Coordinator 5 Develop and implement an Illicit Discharge and Develop a program to inspect outfalls, and identify and Stormwater Compliance Elimination program eliminate Illicit Discharges. Coordinator 4. Construction Site Stormwater Runoff Control BMP Measurable Goals Responsible Position Sites will comply with the City of Monroe Erosion and Require construction site operators to implement Land Development & 1 Sedimentation Control erosion and sediment controls at construction sites and Infrastructure Engineer Ordinance provides actions to ensure compliance. A Pre -Construction meeting A Pre -Construction meeting will be held with City staff 2 will be held for each site and Financial Responsible person and/or their Erosion Control Inspector representative(s) A monthly site inspection will be held with City's 3 Monthly Site Inspection Erosion Control Specialist and Financial Responsible Erosion Control Inspector person and/or their representative(s) 28 5. Post Construction Stormwater Management in New Development and Redevelopment BMP Measurable Goals Responsible Position New developed and redeveloped sites will abide All new developed and redeveloped sites must meet 1 by the City's Stormwater City Stormwater Management Ordinance requirements Stormwater Engineer Management ordinance and for water quality and quantity 15A NCAC 2H.1000 Ensure property owner(s) Maintain an inventory of SCMs. Review annual 2 are maintaining the Stormwater Facilities on inspection report submitted from owners of stormwater Stormwater Engineer their site facilities Assist Water Resources Department and Planning and 3 Stream Buffers Development with ensuring that buffers are protected Stormwater Engineer along all erennial and intermittent streams 4 Enforcement Issue and tracking of Notice of Violations Stormwater Engineer 6. Pollution Prevention / Good Housekeeping for Municipal Operations BMP Measurable Goals Responsible Position 1 Maintain inventory of Municipal owned or Review and update the list of municipal facilities on an Stormwater Compliance operated facilities. annual basis. Coordinator Review of municipality Conduct annual review of the industrial activities with a owned or operated Phase I NPDES stormwater permit owned and operated regulated industrial by the permittee. Review the following aspects: the 2 activities, and development anStormwater Stormwater Pollution Prevention Plan where one is Stormwater Compliance of Pollution required, the timeliness of any monitoring reports Coordinator Prevention Plans. required by the Phase I permit, and the results of (O&M Plan) inspections and subsequent follow-up actions at the facilities. Review the current Spill 3 Response Program for its Make an annual review of the responses to spills and Stormwater Compliance effectiveness and adjust evaluate the outcome of each one. Coordinator accordingly. Review the street sweeping program and adjust Records will be kept of the volume of materials picked 4 accordingly to reduce polluted stormwater runoff up by the street sweeping equipment and presented in an Streets Superintendent from streets, roads and annual report. public parking lots. O&M for municipal owned 5 or maintained catch basins Periodic cleanout of catch basins. Streets Superintendent and conveyance systems Maintain list of municipal Keep list of stormwater SCMs along with inspection 6 owned or maintained structural SCM for records. (see Post Construction Stormwater Stormwater Engineer municipal operations Management above) 29 7 O&M for Municipally owned or maintained Develop and implement an inspection checklist for each Stormwater Engineer structural controls SCM type Implement an employee training program for municipal 8 Staff training 1 employees involved in implementing pollution Environmental Educator revention and good housekeeping._ Provide training on the use of herbicides and other chemicals and how they Maintain records of those licensed to apply herbicides. Stormwater Compliance 9 can enter the storm systems Provide information on how storm systems receive Coordinator through improper runoff from vegetated areas using handouts. application Inspect street operations facility to ensure that all Make a weekly inspection of those areas where 10 stored chemicals are chemicals used in the street operations are properly Street Superintendent properly contained and any stored and secured against spillage. spill potential is minimized. Inform vendors with City Inspect each vendor's work site in the City and evaluate 11 contracts to practice good the degree of compliance. Stormwater Engineer site housekeeping 30 Appendix B EROSION AND SEDIMENTATION CONTROL ORDINANCE http://enp-ineerinll.monroenc.or2/wp-content/uploads/2014/11/Oripinal-Ordinance-0-2003-33-revised-per-0-2011-12.pdf 31 Appendix C STORMWATER MANAGEMENT ORDINANCE fty:HLIp.monroenc.or web/en¢/Administrative%2OManual%20SWM0%2ODownload/ 32 Appendix D SANITARY SEWERS & CONNECTIONS Monroe Code of Ordinances Title V Chapter 52 S 52.010 http://www.amlegal.cominxtlgateway.dll/North%20Carolina/monroe/cityoftnonroenorthcarolinacodeofordinance?�templates$f i =default.htm$3.0$vid=amlegal:monroe nc 33