Loading...
HomeMy WebLinkAboutGW1-2021-00891_Well Construction - GW1_20210402 WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor Information: Jon Keifer 14.WATER ZONES FROM TO DESCRIPTION Well Contractor Name ft. ft. NCWC 4097-A ft. ft. NC Well Contractor Certification Number 15.OUTER CASING for multi-cased weUS)OR L[NER if a ►icable Landprobe, Dept. of Bunnell Lammons Eng., Inc. FROM TO DIAMETER THICKNESS MATERIAL ft. ft. in. Company Name 16.INNER CASING OR TUBING(geothermal closed-loop) 2.Well Construction Permit#: WR03001 15 FROM TO I DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC,County,State, Variance,etc) 0 ft. 78_55 ft- 6" 1D Schd 80 PVC 3.Well Use(check well use): ft. fr. in. Water Supply Well: 17.SCREEN pp y FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public 78 5 ft• 88.5 ft. 6" im .010 Schd 80 SS 304 ❑Geothermal(Heating/Cooling Supply) ❑Residential Water Supply(single) ft- 78 5 ft. 1O ❑Industrial/Commercial ❑Residential Water Supply(shared) 18-GROUT ❑Irri ation ❑Wells>100000 GPD FROM I TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 f`' 69.5 ft• Neat Grout Tremie 150 Gallons ❑Monitoring CJRecovery tt. ft. Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK if applicable) ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENTMETHOD ❑Aquifer Test ❑Storm water Drainage 78.5 ft• 88.5 f`' #2 Filter Sand JTremie ❑Experimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG attach additional sheets if necessary) ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM TO DESCRIPTION color,hardness,soiUmck type,grain size,etc. 0 ft. 20 ft. Not logged-Vacuum utility Clearance(0'-1 0),No Recovery(10'-20') 4.Date Well(s)Completed: 03/31/21 Well ID# EX-20 20 ft. 60 ft. Sift 5a.Well Location: 60 f` 80 f` Weather Rock Allen Steam/Duke Energy N/A 80 f` 90.3 f` Bedrock Facility/Owner Name Facility tD#(ifapplicable) ft. ft. .� 253 Plant Allen Road, Belmont, NC 28012 ft. ft. Physical Address,City,and Zip fr. ft' AP Gaston 3592779998 21.REMARKS l 't County Petrel Identification No.(PIN) 1it�ll� t10I11 j`^ .n 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one lat/long is sufficient) 22.Certification: 528710.1 N 1399432 Easting W Jon Keifer Jon Kilr 2021-03-3116:14:40 3/31/2021 6.Is(are)the well(s): OPermanent or ❑Temporary Signature of Certified Well Contractor Date By signing this form,1 hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or ONo 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the ofthis record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page':to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 90.3 (fL) For multiple wells list all depths if different(example-J r200'and 2 a@100') Submit this GW-1 within 30 days Of well completion per the following: 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: (ft) Information Processing Unit,1617 MSC,Raleigh,NC 2 7699-16 17 Ifwater level is above casing,use It.Borehole diameter•' 10 (in.) 24b.For Injection Wells:Copy to DWR,Underground Injection Control(IUC) 12.Well construction method: Rota'] Program,1636 MSC,Raleigh,NC 27699-1636 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCUA Permit Program,1611 MSC,Raleigh,NC 27699-1611 13a.Yield(gpm) Method of test: 13b.Disinfection type: Amount: Form GW-I North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018