Unfortunately, the SW plan was lacking a lot of info, See attached bullets,
Thanks,
Annette
From: Smith, Cherri L
Sent: Monday, July 08, 201310:13 AM
To: Lucas, Annette
Subject: 13 -0576 Halifax Sawmill
Hi Annette,
Where did the weekend go, and here it is Monday again! I just wanted to let you know that Walter explained the buffer impact I was having trouble with so I'm
okay with the impacts for this project. The buffer impact is for a spur off of the main rail line into the facility. In this case, it's allowable with mitigation.
Hope your day is going well so far.
Cherri
Cherri Smith
NCDENR Division of Water Quality
Raleigh Regional Office
1628 Mail Service Center
Raleigh, NC 27699 -1628
ph. 919 - 791 -4251
E -mail correspondence to and f rom this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties
13 -0576 Klausner Lumber Two Project
AML comments
July 8, 2013
1. The Division does not currently have enough information to conduct a thorough
technical review of the two proposed wet detention ponds. Please provide the following
information so that your designs can be reviewed:
a. Full -sized plan sheets showing the entire site with its storm drainage system,
including every inlet, outlet and conveyance device. Please show how
stormwater management requirements have been met at every proposed outlet
location.
b. A BMP Supplement Form with all required items that have been omitted for each
of the two proposed wet detention ponds on the site (see
http: / /portal.ncdenr.org /web /wg /ws /su /bmp- manual). Please be sure these
items are at the requested scales.
c. An original signed and notarized O &M Agreement form. Sample O &M forms are
available at: http: / /portal.ncdenr.org /web /wg /ws /su /bmp- manual.