Loading...
HomeMy WebLinkAboutWQ0042236_Regional Office Historical File Pre 2018APPLICANT INF-OI 1, Applicant's name: Applicant type: Department State of North ('arol(I. n ° ronniental Quality. Division of Water Resources Iax•'1NCAC`01T".'BOO-..-} TTRACK SEWER SYSTEM EXTENSION APPLICATION ETA (.1-1.6 I& SUPPORTING DOCUMENTATION RECEIVEQa1AIC ITttrtt A U individual Federal `'s tonne: Ste 4. Applicant's mai City: `frcltt rt) rt Applicant's contact ittftrtttntrttt° Phone number: (704) S28 ✓600 Email Address: PROJECT INFORMATION: J:, t i `e�yc Lcnneeti a t€ ")f.' I3 ritttt�Canrpus Project otaane �<'t1w__ Application°'Prc,riect status: Ei Proposer (Ne t Permit) if"tt ant alific ttion provide the e\istit is intit: 'number 4VQ0(}.._ but part oftt tttastet° pl;ttt, previcle tltc e i tita ; permit n 3. County There pioieet r le catrtl: [,reel l 4. Approximate Coon:litts:ttes ( )ee,ia tttl lt� xre.e Parcel If) (if applicable): 4731 Sr? (or Parcel IC) to closest downstream sewer) if new ce at.ic:n Number:,l eak Per I r1 !C °_() I" .tll_I)f (h) 20 Zip: III. CONSULTANT II\FORMA FION: 1. Professional I rt t,in e 13 tt tr¢tit? Finn: W' ,01 C"oni ullttt°tts. Nlailin. address: City: Morganton State Pltttne t�tnuber 11°' IV. WASTEWATER TREAT 1 NT F l_ )Facility Name Owner Name: RECEIVING DO AS" 1_ Permit Numbers Pet:mit `Prot 0 '' 1. e>at truck 80 $9i9, I.aeense Nunrlrer: 792.51 INEORMA'FIOtN: NC0020501 `t)RNI"t1ON (i 1) v nstre:mt rr? 1..k 1141 JAN 1 3 2021 WQAOS MOORESVILLE REGIONAL OFFICE ed 'Public Utility L THE COMPLETED APPLICATION PACKAGE. INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE Asheville Regional Office Water quality Section Fayetteville Regional Office Water Quality Section Mooresville Regional Office Water quality Section Raleigh Regional Office Water quality Section Washington Regional Office Section 7-ADDRESS 2090 US Highway 70 Swannanoa, North Carolina 28778 (828) 296-4500 (828) 299-7043 Fax 225 Green Street Suite 714 Fayetteville, North Carolina 28301-5094, (910) 433-3300 (910) 486-0707 Fax COUNTIES SERVED Avery, Buncombe, Burke, Caldwell, Cherokee, Clay, Graham, Haywood, Henderson, Jackson, Macon, Madison, McDowelt, Mitchell, Polk, Rutherford, Swain, Transylvania, Yancey Anson, Bladen, Cumberland, Harnett, Hoke, Montgomery, Moore, Robeson, Richmond, Sampson, Scotland 610 E. Center Avenue Alexander, Cabarrus, Catawba Cleveland, Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax 1628 Mail Service Center Raleigh, North Carolina 27699-1628 (919) 791-4200 (919) 788-7159 Fax 943 Washington Square Mall Washington, North Carolina 27889 (252) 946-6481 (252) 975-3716 Fax ilminqton Regional Office 127 Cardinal Drive Extension Water Quality Section Wilmington, North Carolina 28405 (910) 796,-7215 (910) 350-2004 Fax inston-Salern Regional Office 450 W. Hanes MiII Road Water Quality Section Suite 300 Winston-Salem, North Carolina 27105 (336) 776-9800 Chatham, Durham, Edgecombe, Franklin, Granville, Halifax, Johnston, Lee, Nash, Northampton, Orange, Person, Vance, Wake, Warren, Wilson Beaufort, Bertre, Camden, Chowan, Craven, rituck, Dare, Gates, Greene, Hertford, Hyde, Jones, Lenoir, Martin, Pamlico, Pasquotank, Perquimans, Pitt, Tyrrell, Washington, Wayne Brunswick, Carteret, Columbus, Dublin, New Hanover, Onslow, Pender Alamance„ Alleghany, Ashe, Caswell Davidson, Davie, Forsyth, Guilford, Rockingham, Randolph, Stokes, Surry, Watauga, Wilkes, Yadkin INSTRUCTIONS FORFORM: FTA 04-10 & SUPPORTING 7UNIEN1 KI Page 3 of 3 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. if the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No EN/A 3. If the Applicant is a Hume/PropertyOwners' Association. has an Operational Agreement (FORM; HOAI been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Residential Leased 0 School / preschool / day care ❑ Food and drink facilities ® Businesses / offices / factories ❑ Retail (stores, centers, malls) ❑ Retail with food preparation/service ❑ Medical f dental / veterinary facilities Church ❑ Nursing Home ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool /Clubhouse ® Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) 5. Nature of wastewater : 100 °io Domestic/Commercial °'° Commercial % Industrial (See 15A NCAC 02T ,0103(201) there a Pretreatment Program in effect? ❑ Yes 0 No 6. Has a flow reduction been approved under I5A NCAC 02T .0I 14(fr D Yes ® No > If Yes, provide a eopv of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(fl) Daily Design Flow" No. of Units Flow Residential (children's home) 60 gal/person 40 2,400 GPD Staff 25 gal/person 100 2,500 GPD Church 3 gal/seat 200 G- GPD Fitness Center 50 gal/100 s1, fi-, 5,000 2,500 GPD Gymnasium 50 gal/100 S. , ff. 5,000 2,500 GPD Swimming Pool 10 gal/person 200 2,000 GPD Total 12,500 GPD t/ a Sea I S A NCAC 02T .01 14(b), (d), (el(11 and (e)(2' far caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G,S. 42A-4), b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 12.500, GPD (per 15A NCAC 02T .0114) A Do not include future flows or previously permitted allocations if permitted flow is zero, indicate why: 0 Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: 0 Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 GRAVITY SEWER DESIGN d %RITERFA (lf Applicable) 02T .0305 & Sauutitariz r be pertn itted: DC es to meet niintnllll.fn la .ing of Gravi o minimum slope i n l cat° Sewers): �r design criteria ed and a violation of the MDC VIII. I. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .030- MI)C (Pump Statiola /Force l�I OI PLE"IE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Purnp statio 2. Approximate Coordinates (Dec atra t1 Degrees): l.ati Design flow of the pump station: 54 millions g 4. Operational points) of tl'ic. pttrral )s). 1 gallons per 1 5. Summarize the force mai Power reliability in accorcla.alce vit1 E Standby power source or pump Required .for all pump stations with Must be permanent to facility Or if the pump station has an average da Portable power source 1.A. ntantaal .0305(1)(4 )(C.) c or A, NC", 5 720308 I on4uitude r't capacity) 160 feet total dynamic head TM() eras daily flint fret n. 'Material wt or equal to 15,t)f)0 gallons per ns per day: ion, eltaick-connection receptacle and teleinctty 15A NCAC 02T nier cttcy pump connec It shall he demonstrated to the Divisiondrat t@le 1 and is compatible with the station. If the portable power source or pump is dedicatee capacities and the rotation schedule of portal in the case of a multiple station power outage, n and tel :meta -A NCAC 02T .0 305(h)( n red by tl'ie applicant (draft agreernetl't) tataalliple putttp stations, atn esath.aattt)n of all the pump stations' storar „c power source or pump, including travel timelrames, shall he provided FORM: FTA O l--16 VI. GENERAL REQUIREMENTS I. If the Applicant is a Privately -Owned Public tittlity„ has a Cernficate of Pub ic Convenience and Necessity been attached? Yes [IN° NIA 2, If the Applicant is a Developer of lots to he sold, has a Developers Operational AzreetrientlEORM:, DLV,) been attached? ri Yes JNo NIA 3, If the Applicant is a Home/Property Owners" Association, has an Operational .A.D. einem (FORNE flak) been attached? El Yes LINo N/A 4. Origin of WaStewater: (check all that apply): [E] Residential Owned Ej Residential I,eased Ei School / preschool I day care El Food and drink facilities El Businesses offices / factories LI Retail (stores, centers, malls) El Retail with food preparation/service El N4edical / dental I veterinary 'facilities N Church El Nursing Home 5. Nature of Nvastewater 100 Dom.estic/Commercial 0 Cormilercial 'Indu.strial. (See I 5A. NCA.0 02T .010.300I) 1 Is there a Pretreatment Program in effect? 6,. Elas a flow reduction been approved under 15ANCAC 021 .0114(0? If yes, provide a copv of flow reduction approval letter Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Residntial (children's home) Staff Church. Fitness Center Gymnasium Svvim.min.g Pool 60 gal/person 25 gal/person 3 gal seat 50 gall100 50 gall 00 10 tot/person Car Wash. ri :Hotel and/or Motels Swimming Pool /Club,house NI Swimming Pool/Filter Ba,ckwash El] Other (Explain in Attachment) 'No. of Units 40 Flow 2,400 GP) i 00 2,500 GP.D 200 12,5.00 GPD 5,000 2,500 GPI) 5,000 2,500 GPI) 200 2,000 GPI) Toted 12,500 GPD a See 15.A NC AC 021 .01144b1„,;(_cille)( ) and (c),(2J for caveats to wastewater design .flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; 'public access facilities located near high public use areas; and residential property located south or east of the, Atlantic Intracoastal Waterway to be used as k'action rentals as defined in (i.S. 42A-4). h Per 15A NCAC 021 .01.I 4(c), design flow rates for estahlishinents not identified fin table 1.5A NCAC 02/f 01 f4,j shall he determined using available flow data, water using .fixtures, occupancy or operation patterns, and other measured data. 8, Wastewater generated by project: 12,500 GPI) (per 15.ANC,Acf.)2I,0114) Do not include future flows or previously permitted allocations If permitted flow is rero, indicate why: El Pump Station or Gravity Sewer where flow will be peril:lined in subsequent permits that connect to if Li Flow has already been allocated in Permit Number: El Rehabilitation or rep cement of existing sewer v th no new tloss e.,- e-ft.:!d El Other (Explain): 1ORM: Ff A 04-16 Page 2 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(0: 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) ➢ 15A NCAC 02T.0305(fl contains minimum separations that shall be provided for sewer systems: ® Yes El No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) . I8 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells,, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water - 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal. high water (or tide elevation) and wetlands (see item IX.2) . 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement . 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ I5A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g)., see Section X of this application • 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® NIA ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch ❑ Yes ® No Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ®Yes El No ❑N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIO;NS: I. Does the submitted system ,comply wit and Force Mams,.f,latcst )ersiot tend the L No estnCrateria Criteria (latest v ipplica tat[ If No, ornplete and submit the Variance/Al e ative Design Ftawtpuest application (VA f)( I.Ci-14) and supporting documents for review, Approval of the request is required prior to submittal (Attie Fast Track Application and supportin documents., Professional rtt ttcer's CertiGic:;ation: (Prolc'ssicmal °tigineer.s nartee Errant A application 11 BHA s Breit re l vved by me ra.aad is accurate, complete and consistent with the in engine calculations, and all other supporting documentation to the best of of ni knowledge the proposed design has been prepared in accordance vi Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum of Pump Stations and Force 'Nit -tins (latest version? A.lthouth other professionals submittal package, inclusion of these materials under my signature and seal sag have,lud.ged it to be consistent with the proposed design. NO'1 F, •- En accordance with (:;eraeral Statutes 14a3-2 15.6A. ar statement, representation. or ceriiIica include a fine not to exceed S10:000, as sell as civil Applteat cation pa aloes tr North Carolina Professional Engincter's scal, AC: has been reviewed by rt• this application are not application package is subvi and is acct p and/or criminal of this lertrait be viealated. 1 also understand that if porting information. and attachments are not application for nation supplied in the plans, specific: Lions. knowledge, I further attest that to the befit the applicable regulations, Gravity Sewer the ''as't-Track. Permitting ed certain portions of this ?.6fi, any person who knosviu 11 be gt:rilty of a Class . ure, and date: 1plete to the hest NOTE -, In accord:aneem c�itla C;eraertal Sttattates ld statement, representation, or certiftc.ta,tic n in. any ap include a fine not to exceed S 10,000 as well as civil penal aI.s6A al y knowledge. 1 understand 11' entatioaa aani attachments ar and that an) dkL1 ction that water il.e, against the Diva parts of this application package are not completed and that if this application package will be returned to me as Mich may applica d I42ry2I .6B, ckatc sl°tall be gu to S2 3.000 per vio equtred parts Lai included, this tee- ti ona t'W- ade et v'tl penalties, should a condition in.`rli' makes any tal.se which naay FORM: ETA 04-I( e5of5 IX. SETBACKS & SEPAJtt TIONS 0213 .0200 & I5A NC'AC 02T .0305(t`)): 1. Does the project comply with all separations found in 15A NC;\C 0 1, .0305(0 .4z (a) 15A NCAC 02' 0305(f) contains tr, imuni. se p rations that shall be pro Setback. Parana-. orm sewers tancf otlni.r tttiiities not listed below (vcrtit:al) twins dveriical vvatea' oven" evv°er includint in benchcal trenches ao-ns izontr Reclainned ain lrnes (verticalrc-elatnled over scvvcr) naatcr Reclaimed avatar lines (hc`rrizontal - rcclaittned over 4evr°er) *Any private or public water supply source, including any wells,.VV" I lvatcrs of Class 1 C r s Il ina outnded reservoirs used as a source of"drinking vstiater. *a tifi'atcrs e.lassit ed WS (except WS-I or WS-V). B. SA„ CONY', tiVrA'', or SB from normal lti h water or ttcle elt vation) arid. wetlarnds sec. item l X.2) vAnd° other strcart, take, impottndtaaent, or rour'rd rsater lowering and surface drama *e:• s% buildi toesto pot Drat tt s'. il11. eat h a] AuV Final hanktalet or ca 2 feet err' nitre vfe.r and interceptor drains 15A NCAC tl(}m(t;) contains altern **Stream classifications can be identified using nconrplianec with 0 1 0. 0 t) or_(z), see Se teal height 24 inches 18 Melnt 10 feet 36 nac n 02 l 0305JD cannot be achieved. n's NC Surface.,_ Water Classifications wehparte is application Does the project comply with SCatiort rccluirenretnts f'inr vetlaands'i (50 feet o See the Diivi,sion's draft see,°ia°ttiorl aeetttrrerttnts for situa.tit , No variance is required if the aliennitir e. clesifn et'iterta specifre As built documents should reference the location cif arenas effected Yes riNo Yes Li No NIA be meet and construction .Does the project comply vrith se:tl+acks t`crut°rci rn the river hasrules pt r ;I5A NCAC 0213 02Q0 LI Yes NIA • 'This would include Irclut Bul'f"ered Streams per flSANCAC 2B 0202 4. Does the project, require cover, aa e;'arathorizdtion under a 404 Nationwide or indivxidual permits or 401 Water Quality Certifications`' Information can be ohtaine-d from the 401 & ):tuner Pci matt iz k twatlrc t Does project comply l CAt Oaf 01.05(c)(t) (ad.ditional pernnits'certifica a5'es No No Per ISA NCAC Q2T .O1.051c)(6„), directly related environmental permits or ccrti'tictttion applications are l eitia prepared, have been applied for, or have been obtained. issuance of this p€:•rmit is contingent on issuan .e of dependent permit, (erosion and sedimentation control plans, stui111 vrater management Owls, etc.), Does this project in etude an} sesse•r collection lines that aaa"e dee Per 15A NCAC( 02E 0402. "hi h priority sewer" means "air positioned parallel to streaanihanks that is subject to erosion tha ii i h-pr contaetina strrt`atce vvaate rs,. siphon, N:A dun ; type (aerial line, size, material, and 1 High priority lines shall iae inspected by the perrnittee or its representative nt feast oc documented per 15A NCAC: ()2"-.04030)(5) or the perntiiee's individual System-VVic nouths and .inspections i nerotit. 6 SULTA TS put- 1)elebitibeif28a2020 405:Sputh.Ste888g $treet„ Morganton,. NC:286575 42.8 43325681 fax .828 •213a. 5662. Nofo@weNt-c828288t821888,828 Mooresville Regional Office NCDENR - Water Quality Section 610 East Center Avenue Mooresville, NC 28115 RECEIVED/NODES/EWE JAN I 3 2021 WI:EROS MOORESVILLE REGIONAL OFFICE Seer Pertnitifor Connection.to .CHA Barium-( ataptiS if° Whom It Ma) Concern.; The project will consist of the installation of approximately 2,895 let of 8-Mull graVi ty sewer, pump replacements for Technology Drive PS and approximately 4,245 feet or(" force Italia The project location is on the north side of the Town of Troutman. The project will serve Childrens I lope Alliance's Barturn Springs Campus, which will add 12,500 GP!) to ifroutman's system. Included in this submittal is the 1 ast01 rack Application, Flow Tracking Applicatiem, maps and a check for S480,00. Sincerely, WEST CONSULTANTS, P1I2C Benjamin B, Thomas, PE Enclostires High Priority (Aerial) Line Description There will be one aerial line for this project. The aerial line is on Sheet 2 of the plans between ex. manhole 174 and manhole 1. The aerial line will be constructed over Duck Creek and will be 8" flanged ductile iron with flanges centered with the creek. Concrete anchors will be installed on each side of the creek. Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Troutman Project Name for which flow is being requested: Connection to CHA Barium Campus More than one FTSE may be required for a single project if the owner of the WJVTP is not responsible for all pump stations along the route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit #: All flows are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request 0.0125 g. Total actual and obligated flows to the facility h. Percent of permitted flow used 11. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** Tech. Dr 0.454 0.181 0.0034 0.0243 0.028 0.153 I-L Crk. 1.140 0.455 0.198 0.2435 0.4415 0.0135 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Statesville Third Creek WWTP Downstream Permit Number: - NC0020591 Page 1 of FTSE 10-18 `Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Troutman Project Name for which flow is being requested: Connection to CHA Barium Campus More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit #: c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 0.0125 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations Iocated betsveen the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pt), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** Tech. Dr 0.454 0.181 0.0034 0.0243 0.028 0.153 I-L Crk. 1.140 0.455 0.198 0.2435 0.4415 0.0135 * The Firm Capacity (design flow) of any pump station is defined as themaximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Statesville Third Creek WWTP Downstream Permit Number: NC0020591 Page 1 of 6 FTSE 10-18 CCertit'acation Statement: t Steve Shealy tlae volume of wastewater to he: permitted in this wastewater treatment facility and that the flow related sanitary server overflows or overburden a o the best of iect has been ov+ led the ad -valuated along the route cipated to cause any capacity lip station en route to the receiving t.naent plant gander normal circumstances, given the iitapletaaentatwn of the planned improvements ified in the planning assessment where ;applicable. This analysis has been performed in accordance ocal established policies and procedures using the best avaailaable data, This certification applies to 1 above in Sections 1 and. II plus all attached planning assessment: aaddendums for which l am the responsible party, Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. FTSI' l0-18 W . Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Troutman Project Name for which flow is being requested: Connection to CHA Barium Campus More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Third Creek WWTP b. WWTP Facility Permit #: NC0020591 Allflows lows are in MGD c. WWTP facility's permitted flow 6 d. Estimated obligated flow not yet tributary to the WWTP 0.7157 e. WWTP facility's actual avg. flow 1.0 f. Total flow for this specific request 0.0125 g. Total actual and obligated flows to the facility 1.7282 h. Percent of permitted flow used 28.8 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / PO, Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. V Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not Less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Downstream Permit Number: Page 1 of FTSE 10-18 III. Certification Statement: I William E. Vaughan, PE certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. ign`ing Official Signature Tit e of Signing Official Date Page 2 of 6 FTSE 10-18 DUCK CREEK CLASS C PROPOSED 8°' GRAVITY SEWER TECHNOLOGY DRIVE P,S, PROPOSED 6" F oRC E MAIN RIMMER FARM ROAD Tr utrn USGS MAP TOWN OF TROUTMAN SEWER EXTENSION TO ELIMINATE NPDES DISCHARGE AT CHILDREN'S HOPE ALLIANCE (CHA) PROPERTY TROUTMAN, NC NOT TO SCALE IVE MER FA PROJECT LOCATION MAP TOWN OF TROUTMAN SEWER EXTENSION TO ELIMINATE NPDES DISCHARGE AT CHILDREN'S HOPE ALLIANCE (CHA) PROPERTY TROUTMAN, NC NOT TO SCALE 404 `h 433,5861 NO 44»5565 No 4,0203