Loading...
HomeMy WebLinkAbout20130683 Ver 1_CD Stormwater Info_20130703Hugh I Gilleece, 111 & Associates, P.A. 875 Walnut Street, Suite 360 Cary, North Carolina 27511 Consulting Engineers - (919) 469 -1101 Business License C -496 Drainage Report (Includes Dry Detention Pond and Nitrogen Calculations) gilleece@bellsouth. net Bellewood Manor Subdivision 9105 Green Level Church Road Cary, North Carolina Prepared For WWD, LLC i 000 Dariingion Dr Suite 10055 Cary NC 27511 February 14, 2013 Revised May 2, 2013 Revised June 13, 2013 A' g�Jr�`�'�, o_ 024627 g .. gniSd'e0a6 '9h� General Existing Conditions Post Conditions Watershed Modeling Storm Drainage Calculations Temporary Silt Trap Calculations Ditch Lining Outlet Protection Appendix Bellewood Manor Subdivision Drainage Report Table of Contents 2 3 3 El 0 Bellewood Manor Subdivision General This project is located in Cary, North Carolina at the intersection of Green Hope School Road / Green Level Church Road. It drains to tributaries of White Oak Creek which is part of the Cape Fear River basin. The purpose of the project is to meet the Town of Cary's storm management criteria for the proposed 75 lot subdivision. Half of the existing property has been has been farmed, and the remainder is in woods / grasses. This project falls under the Lower New Hope Subbasin. The nitrogen calculations have been included in the Appendix. These calculations assume 5,000 square feet of impervious per lot. The proposed subdivision has less than 30% impervious area. With the streets having grass swales (no curb and gutter), the project is considered low density. Dry Detention Basins are being proposed storm water runoff to have the 1 year post conditions be less than the 1 year pre condition. Existing Conditions A copy of the Green Level quadrangle (Figure 1) shows the 45 acre parcel. It is near the drainage basin divide for White Oak Creek and Panther Creek. The property has two streams running through it. To properly model the pre / post development conditions, a Point of Interest was selected where the two streams merge. The total drainage area consists of three subbasins: A (north of the existing stream) is 15.8 acres with a CN value of 75. Subbasin B (south of existing stream) is 25 acres with a CN value of 74. From Kirpich method for determining Time of Concentration, a time of 10.8 minutes is obtained for a length of 1900' with a slope of 2.5 %. Subbasin C feeds the southern stream. A total of 57.2 acres (CN of 73) feeds the center of the stream. For the stream between Al /B 1 merge, the stream length of 1400' with a basin slope of 1.1% gives a time of concentration of 11.8 minutes. Figure 2 shows the breakdown of soil types used to determine the CN value. The stream length and elevations are shown which were used to calculate the time of concentration. Note that the middle of the stream was used to model the watershed. The area to the north of the stream is to be developed with the Holland Farms Subdivision. No attempt was made to incorporate its storm water management features into this hydraulic model. Post Conditions The hydraulic model for the post development condition gets complicated when considering bypass areas, detention ponds and culvert crossings. Figure 3 shows the drainage areas established to 3 model the post conditions, and Figure 4 shows the Watershed Model Schematic used in the Hydrograph computer program to evaluate the Pre / Post Development flows. Basin areas 8 and 11 (13.2 and 9.1 acres) are routed through dry detention basins (BMP 1 and 2). These basins were selected to intercept as much storm water runoff as practical for the subdivision. Topography constraints prevent to intercept all flow from the development. This was the main reason to model the basin at the Point of Interest to see Pre / Post Development flows. Watershed Modeling To model the existing conditions, hydrographs for Subbasins A and B were combined. The hydrograph for Subbasin C was then combined to determine the Pre Development flow. Figure 4 shows the schematic for routing the basin. The proposed development flow is also shown on Figure 4. With the Sabino Way roadway crossing, Subbasins A and B were divided further into areas: -4 Post Al (bypassing of flow past Sabino Way) — hydrograph 6 A, Post to BMP 1 (developed area for B that flows to Dry Pond 1) — hydrograph 8 A Route area "Post to BMP 1" through Dry Pond — hydrograph 12 A, Route Dry Pond Outfall and Post Al - hydrographs from 6 and 12 were combined to form hydrograph 13 Bypass to Sabino Way (undisturbed area for A that flows to Sabino Way) — hydrograph 16 Post B 1 Bypass (undisturbed area for B that flows to Sabino Way) — hydrograph 7 Post to Roadway (developed area for B that flows to Sabino Way) — hydrograph 9 Combined hydrographs 7, 9 and 16 to form hydrograph 17. Route hydrograph 17 (23 acre basin) through the roadway crossing at Sabino Way and obtain hydrograph 18. The post development conditions for Subbasins A and B are represented by hydrographs 13 and 1.8. Subbasin C is divided into two areas, of which one area is routed through Dry Pond 2 Bypass Post C 1 (undisturbed area for basin C) — hydrograph 10 Post to BMP 2 (developed area that flows to Dry Pond 2) — hydrograph 11 A- Route through Dry Pond 2 — hydrograph 14 Combined hydrograph 10 and 14 to obtain hydrograph 15. Hydrograph 15 represents post developed condition for Subbasin C. The Post Developed Condition is obtained by combining hydrographs 13, 15 and 18 to create the final post hydrograph 19. The Hydrograph Return Period Recap (Figure 5) shows the summary of the Pre / Post Conditions for the 1, 2 ,5, 10, 25, 50 and 100 year storm events. The 5 and 10 year design storm has a less than 5% increase for the watershed, while the 25 and 100 year design storms are less than the existing rd conditions. This is due to modeling the drainage basin with the proposed roadway crossing at Sabin Way. The point of interest is just south of the southern channel merging with the main channel. A cross section was obtained to determine differences in flood elevations for the 1, 10 and 100 year storm. These calculations are in the appendix. in summary, the flood elevations for the various storms are less than 0.1' increase for the 10 year storm. Design Year Storm Flow (cfs) Flood Elevation Difference 1 Year Pre / Post 119/121 296.51 0' 10 Year Pre / Post 365/380 298.7 / 298.78 0.08' 100 Year Pre / Post 686/665 300.05 / 299.97 0.06' Storm Drainage Calculations Storm drainage calculations have been run using the Carlson computer software. In the appendix, the table showing flows for the 10 year design storm. The Sabino Way Roadway crossing was used to determine backwater calculations. The 100 year backwater elevation is 322.1' which is shown on the plans. All of the pipe have the Hydraulic Grade Line for the 10 year storm to be below the top of the pipe. The 25 year storm hydraulic grade line is below the top of yard inlet for all structures. The hydraulic grade lines are shown on Sheets C29 and C30 in the plan set. Temporary Silt Trap Calculations The project has been sub divided into three phases. Each phase can stand on its own, although phase 1 needs to be constructed first. A total of 5 silt traps / basins are needed for the project. A design of each basin is included in the appendix. Ditch Lining With little storm drainage pipes being provided, calculations for the drainage swales are needed for the 2 year design storm (bare and lined) and 10 year design storm (permanent protection). A summary of these calculations are in the appendix. E Outlet Protection The velocities for the 10 year design storm were used to determine rip rap protection at the outlet of all FES. The design for the outlet protection is included in the appendix. 0 Channel Report Hydraflow Express Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. Friday, Jun 14 2013 Bellewood Point of Interest User - defined Highlighted Invert Elev (ft) = 291.00 Depth (ft) = 5.51 Slope ( %) = 0.01 Q (cfs) = 121.00 N -Value = 0.030 Area (sqft) = 151.10 Velocity (ft/s) = 0.80 Calculations Wetted Perim (ft) = 73.67 Compute by: Known Q Crit Depth, Yc (ft) = 1.50 Known Q (cfs) = 121.00 Top Width (ft) = 71.93 EGL (ft) = 5.52 -�830a001Q2.�0 rQ30) - (111.00, 294.00, 0.030) (117.00, 291.00, 0.030) - (127.00, 291.00, 0.030) - (133.00, 294.00, 0.030) (150.00, 296.00, 0.030) `�� as -( '0bb��, 66.00, 0.030) Elev (ft) 301.00 299.00 297.00 295.00 293.00 291.00 289.00 -50 Section Depth (ft) 10.00 0 50 100 150 200 250 Q4-- 14N You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) 11MI 6.00 4.00 2.00 BE -2.00 300 Channel Report Hydraflow Express Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. Friday, Jun 14 2013 Bellewood Point of Interest User - defined Highlighted Invert Elev (ft) = 291.00 Depth (ft) = 7.70 Slope ( %) = 0.01 Q (cfs) = 365.00 N -Value = 0.030 Area (sqft) = 413.71 Velocity (ft/s) = 0.88 Calculations Wetted Perim (ft) = 173.54 Compute by: Known Q Crit Depth, Yc (ft) = 2.85 Known Q (cfs) = 365.00 Top Width (ft) = 171.70 EGL (ft) = 7.71 �(8 0 98o 1U"3!(37 8'.00, 60)00,11 030) 294.00, 0.030) - (117.00, 291.00, 0.030) - (127.00, 291.00, 0.030) - (133.00, 294.00, 0.030) - (150.00, 296.00, 0.030) Elev (ft) 301.00 297.00 295.00 293.00 291.00 289.00 -50 Section 0 50 100 150 200 250 Q +— IPA You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) Depth (ft) 10.00 1 . IN 4.00 E 1111M 1 -2.00 300 Channel Report Hydraflow Express Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. Friday, Jun 14 2013 Bellewood Point of Interest User - defined Highlighted Invert Elev (ft) = 291.00 Depth (ft) = 7.78 Slope ( %) = 0.01 Q (cfs) = 380.00 N -Value = 0.030 Area (sgft) = 427.61 Velocity (ft/s) = 0.89 Calculations Wetted Perim (ft) = 177.62 Compute by: Known Q Crit Depth, Yc (ft) = 2.91 Known Q (cfs) = 380.00 Top Width (ft) = 175.78 EGL (ft) = 7.79 _MQQ� 30 O�i1�@Ma2 p00r 30) - (111.00, 294.00, 0.030) - (117.00, 291.00, 0.030) - (127.00, 291.00, 0.030) - (133.00, 294.00, 0.030) - (150.00, 296.00, 0.030) �'�f b1j Y3bT' -( g'0 66.00, 0.030) Elev (ft) 301.00 299.00 297.00 295.00 293.00 291.00 289.00 -50 Section 0 50 100 150 200 250 0 +_ 14\ You created this PDF from an application that is not licensed to print to novaPDF printer (ht . / /www.novapdf.com) Depth (ft) 10.00 111MI f� I� 4.00 2.00 o We 99MUM Hydraflow Express Extension for AutoCADO Civil 3DO 2012 by Autodesk, Inc. Friday, Jun 14 2013 Bellewood Point of Interest User - defined Highlighted Invert Elev (ft) = 291.00 Depth (ft) = 9.05 Slope ( %) = 0.01 Q (cfs) = 686.00 N -Value = 0.030 Area (sqft) = 684.39 Velocity (ft/s) = 1.00 Calculations Wetted Perim (ft) = 237.44 Compute by: Known Q Crit Depth, Yc (ft) = 4.15 Known Q (cfs) = 686.00 Top Width (ft) = 235.55 EGL (ft) = 9.07 V QQ� 3 '10�i1Q 2 Q0 �Qt30) - (111.00, 294.00, 0.030) (117.00, 291.00, 0.030) - (127.00, 291.00, 0.030) (133.00, 294.00, 0.030) - (150.00, 296.00, 0.030) `(s . 3 -( $ 0b., 66.10, 0.030) Elev (ft) 301.00 299.00 297.00 295.00 293.00 291.00 Section Depth (ft) 10.00 0 50 100 150 200 250 0 +_ if+\ You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www,novapdf.com) � M We 4.00 2.00 IIIM -2.00 300 L , • Hydraflow Express Extension for AutoCADO Civil 3DO 2012 by Autodesk, Inc. Friday, Jun 14 2013 Bellewood Point of Interest User - defined Highlighted Invert Elev (ft) = 291.00 Depth (ft) = 8.97 Slope ( %) = 0.01 Q (cfs) = 665.00 N -Value = 0.030 Area (sqft) = 672.91 Velocity (ft/s) = 0.99 Calculations Wetted Perim (ft) = 238.36 Compute by: Known Q Crit Depth, Yc (ft) = 4.08 Known Q (cfs) = 665.00 Top Width (ft) = 236.48 EGL (ft) = 8.99 QQ� 3Q9�00 14( 2 t0'OJ J 30) - (111.00, 294.00, 0.030) - (117.00, ", 291.00, 0.030) - (127.00, 291.00, 0.030) - (133.00, 294.00, 0.030) - (150.00, 296.00, 0.030) -� 8 0, aa3p� ( g 0� 66.00, 0.030) Elev (ft) 301.00 299.00 297.00 295.00 293.00 291.00 289.00 Section Depth (ft) 10.00 -50 0 50 100 150 200 250 04-- /4\ You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) 1 0001 4.00 2.00 wo] -2.00 300 Appendix Nitrogen Calculation Sheet Hydrocad Hydrograph Report with Pond Volumes Storm Sewer Tables Temporary Silt Traps Outlet Protection 7. Nitrogen Control Plan Calculations Jordan Lake Developer Nutrient Reporting Form (Note: A separate form is available for Neuse, Tar - Pamlico, and Falls Lake reporting.) Jordan Nutrient Load Reporting Form. September 12, 2012 eQ I F d' ?Sleti„6 v ' ZL to t O• mod' a cq ° d CD t� n� nnn mma�i as ao rn m �T ° —' o ��..�� � Q ° ~�. `� �+ ''� � g,, -•• � � � '^ O O 4 o O'4`O 4 O O'O O ,j�e��+� .VI "'} Y,z N eY N LL.Y. O 3 nom! T S Q 9 LLB ^.' 4 V Q 4 O tt5' 1++� l y� . A: f rr� b .-n k" .�i � 1 e C. r-i ,-� nn ,� m G �+ r ! m Q`� 'y Vi�y/ i '� }{7_. —� R� •a. a �� u G, 8 2. � � a€ N n m � N fin" 2,: „`�.�. 3� ^ 6 ? iPl J "o O N -. N N N N N. N m C) M Lu i4 0 4 O ` 4 4 O 4 4. Q O: O 0 0 N N_ s. N y P, N O w 0 -v 0 a c z b 0 ti �:A @J C] W tA N W E E E z O a N W 2 O 7 G S' a m z Q 7 VI D 2 y K F Q 3 E 3` 8 8: 5 i i k :m ma E i E � o I _ sE a i, '� 6s a a 9 _ m S m 5 1 o x I q n 3 u � iE o v i 3 :m ma i r g o n E FIF, E _ '� 6s a a 9 _ m S m 5 1 8 E aeE E P S E _ 6 a E o g z E E E a V=i 6 f0 m` f m'. s f mF f' �� s ` f" f- f m m � 1 �N„ f "� m � e .. s ' t e l 3 fE, if z� f,� I s ": i _ _ ,,,. _ ._ _... m= �mF ,� � $ � s� � o � �- f t a mE e.. � ,.g E X v � f � � 2 Si 5 � •.E ,$ q v f 92 � 3 3\I 2 e e 3 3, e � �3 E � � E� m Z': 3 e` � E c ;- E � 3 $ g °o° � � E i � � : E a °o o R z —: E E � � a E Y e Hydrocad Report with Pond Volumes Pond Worksheet 90% TSS Removal Project: Bellewood Manor Basin: DP #1 z: \Jobs \220000 \Documents \Reports \Pond Work(HS).xls Total Area = 574992 s. f. = 13.20 acres Factors used on this worksheet: The following formulas from the SCS method are used: S = 1000 /CN - 10 Tp = Vol. /1.39Qp Q* = (P - 0.2S) ^2 /(P + 0.8S) Rational C SCS CN Woods, etc. 0.21 77 Lawn, etc. 0.22 61 Impervious 0.96 98 The following formulas from the SCS method are used: S = 1000 /CN - 10 Tp = Vol. /1.39Qp Q* = (P - 0.2S) ^2 /(P + 0.8S) Storm Date: Qp (cfs) To Basin Impervious = 172497.6 Lawn, etc. = 350000 Woods, etc. = 52494.4 Rational C = 0.441 Storm I (iph) Qp (cfs) P (in.) Q* (in.) Tp (min.) 1 year 4.52 26.54 3.00 0.8857 19.2 2 year 5.76 33.82 3.60 1.2819 21.8 5 year 6.58 38.63 4.65 2.0536 30.5 10 year 7.22 42.39 5.38 2.6318 35.7 25 year 8.19 48.08 6.41 3.4882 41.7 50 year 8.96 52.60 7.21 4.1778 45.6 100 year 9.72 57.06 8.00 4.8748 49.1 Treatment volume F 0.3520 acre -ft. = 15333 c. f. (min. 3630 c. f. for stormwater wetlands) Surface Area Required Wet Retention Pond Depth = 3 ft. Impervious = 30.0 % SA/DA Ratio = Surface Area Required = 1 10925 s. f. Bio- Retention Area (7% x C Factor x area) Surface Area Required = 1 17754 s. f. SCS CN = 73.6 SCS S = 3.5942 mpervious 1= Rv = 1.90 % 30.00 % 0.3200 6/3/13 Permit No. (to be provided by DWQ) OF IN as - �---^® STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR p 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all the required information. I. PROJECT INFORMATION Project name Bellewood Manor Contact person Don Sever Phone number 919 469 -1101 Date 3- Jun -13 Drainage area number 1 Site Characteristics 2.00 days Drainage area 574,992.00 ;ft2 Impervious area 172,497.60 `> ft' % Impervious 030 OK Design rainfall depth 1.00 in Peak Flow Calculations Basin side slopes 3.0 1 -yr, 24 -hr rainfall depth 3.01 in Rational C, pre - development 0.21 (unitless) Rational C, post - development 0.45 (unitless) Rainfall intensity: 1 -yr, 24 -hr storm 5.10 in /hr Pre - development 1 -yr, 24 -hr peak flow 14.10 ft3 /sec Post - development 1 -yr, 24 -hr peak flow 30.30 ft3 /sec Pre /Post 1 -yr, 24 -hr peak control 16.20 ft3 /sec Storage Volume: Non -SA Waters Length to width ratio 3.00 Minimum required volume 15,333.00 ft3 Provided volume 15,500.00 ft3 OK Sediment storage volume provided 3,875.00 ft3 OK Storage Volume: SA Waters 1.5 runoff volume ft3 Pre - development 1 -yr, 24 -hr runoff volume ft3 Post - development 1 -yr, 24 -hr runoff volume ft3 Minimum required volume ft3 Provided volume ft3 Sediment storage volume provided ft3 Basin Design Parameters Drawdown time 2.00 days OK SHWT elevation 313.00 fmsl Basin bottom elevation 317.00 fmsl OK Storage elevation 319,50 fmsl Basin side slopes 3.0 :1 OK Top elevation 322.50 fmsl OK Freeboard provided 3.00 ft OK Basin Bottom Dimensions Basin length 120.00 ft Basin width 40.00 ft Length to width ratio 3.00 ' :1 OK Form SW401 -Dry Extended Detention Basin -Rev.3 Parts I. & II. Design Summary, Page 1 of 2 Permit No. Additional Information Total runoff volume captured by basin 13.20 ac -in Forebay is required Forebay provided y ` (Y or N) Is basin in a recorded drainage easement? y (Y or N) OK Does basin capture all runoff at ultimate build -out? y (Y or N) OK Is a sediment depth indicator included? y` (Y or N) OK Does the basin include a drain? y' (Y or N) OK (to be provided by DWQ) Form SW401 -Dry Extended Detention Basin -Rev.3 Parts I. & II. Design Summary, Page 2 of 2 Pond Worksheet 90% TSS Removal Project: Bellewood Manor Basin zAJobs \220000 \Docum ents \Reports \Pond Work(HS).As Total Area = 396396 s. f. = 9.10 acres Factors used on this worksheet: DP #2 Date: Rational C SCS CN Woods, etc. 0.21 77 Lawn, etc. 0.22 61 Impervious 0.96 98 DP #2 Date: The following formulas from the SCS method are used: S = 1000 /CN - 10 Tp = Vol. /1.39Qp Q* = (P - 0.2S) ^2 /(P + 0.8S) Storm To Basin Impervious = 118918.8 Lawn, etc. = 225000 Woods, etc. = 52477.2 Rational C = 0.441 The following formulas from the SCS method are used: S = 1000 /CN - 10 Tp = Vol. /1.39Qp Q* = (P - 0.2S) ^2 /(P + 0.8S) Storm I (iph) Qp (cfs) P (in.) Q* (in.) Tp (min.) 1 year 4.52 18.28 3.00 0.9196 19.9 2 year 5.76 23.29 3.60 1.3232 22.5 5 year 6.58 26.61 4.65 2.1058 31.3 10 year 7.22 29.19 5.38 2.6905 36.5 25 year 8.19 33.12 6.41 3.5547 42.5 50 year 8.96 36.23 7.21 4.2495 46.5 100 year 9.72 39.30 8.00 4.9510 49.9 Treatment volume = 0.2427 acre -ft. _ ,0571 c. f. (min. 3630 c. f. for stormwater wetlands) Surface Area Required Wet Retention Pond Depth = 3 ft. Impervious = 30.0 % SA/DA Ratio = Surface Area Required = 1 7532 s. f. SCS CN = 74.2 SCS S = 3.4738 mpervious I = 30.00 % Rv = 0.3200 1.90 % Page 2 6/3/13 Permit No. (to be provided by DWQ) W A�R4 O G STORMWATER MANAGEMENT PERMIT APPLICATION FORM of ' NCDENR 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all the required information. Project name Bellewood Manor Contact person Don Sever' Phone number 919 469 - 1101 Date 3- Jun -13 Drainage area number 2 Site Characteristics Drainage area 396,396.00 ft Impervious area 118,918.80 ft2 % Impervious 0.30 Design rainfall depth 1.00 in Peak Flow Calculations 1 -yr, 24 -hr rainfall depth 3.01 " in Rational C, pre - development 0.21 (unitless) Rational C, post - development 0.45 (unitless) Rainfall intensity: 1 -yr, 24 -hr storm 5.10 in /hr Pre - development 1 -yr, 24 -hr peak flow 14.10 ft3 /sec Post - development 1 -yr, 24 -hr peak flow 22.30 ft3 /sec Pre /Post 1 -yr, 24 -hr peak control 8.20 ft3 /sec Storage Volume: Non -SA Waters Minimum required volume 10,571.00 ft3 Provided volume 10,600.00 >'ft OK Sediment storage volume provided 2,700.00 ft OK Storage Volume: SA Waters 1.5" runoff volume ft3 Pre - development 1 -yr, 24 -hr runoff volume ; ft' Post - development 1 -yr, 24 -hr runoff volume ft Minimum required volume ft 3 Provided volume ft3 Sediment storage volume provided ft3 Basin Design Parameters Drawdown time 2.00 dally OK SHWT elevation 301.00 » fmsl Basin bottom elevation 303.00 fmsl OK Storage elevation 306.00 fmsl Basin side slopes 3.0 :1 OK Top elevation 308.50 fmsl OK Freeboard provided 2.50 it OK Basin Bottom Dimensions Basin length 95;00 ` ft Basin width 30.00 ft Length to width ratio 3.00 :1 OK Form SW401 -Dry Extended Detention Basin -Rev.3 Parts I. & II. Design Summary, Page 1 of 2 Additional Information Total runoff volume captured by basin Forebay provided Is basin in a recorded drainage easement? Does basin capture all runoff at ultimate build -out? Is a sediment depth indicator included? Does the basin include a drain? 9.10 '_ ac -in y (Y or N) y (Y or N) y (Y or N) y;' , (Y or N) y; >_ (Y or N) Forebay is not required OK OK OK OK Permit No. (to be provided by DWQ) Form SW401 -Dry Extended Detention Basin -Rev.3 Parts I. & II. Design Summary, Page 2 of 2 o `� llll �,_ _- •� -� � °sue °�� � 1 ` �-• � �.. /�, � �, o o . woe_ � ° :�, , �;- . � =� D 1 � � ' � -��✓ •o r o � II oo S +\ Z� � ip \lj � /) � "�'• 11 ,/'_� �.' �I o� �� ��'��_ "' o` `•;_ %,�-� _, �� ���� •III. ��) > '..�� �`� �� � h �� �`�I �� � � � 300 /�--�� �� 1 %- � �. � '� -vii✓ /'���/�� ��l app Vf ill[[�� l � � r' � • � `� � �r /%� n � A � �, � 1, _ v _ � � ,, � -, :�_ v� too ;�Jj � `° ° �`� — 4. 0- A oe V ail Vs 01 M u CS C5 "D co ON U 0 cS E U -- Ln cD + cd Sm r4 t i3 Re C-i V9 i iA ri L U I, w Lj_ in V% %, Irl ro r-I Ln Sm r4 t i3 Re C-i V9 i iA ri L U I, w Lj_ in V% %, Irl rl- ILL z'a \� I ROM ININ IMM \\ \\ FINIY Table 8.05d Curve Numbers and Rational C Cover DeEri lion Curve Number Rational C Percent HSO HSO MG Huso H80 1 me .711 DSG ImI)L Impervious' Pull �Ioedurban areas Opens ce Poor condition (<50% g-s) 68 79 96 99 016 0.58 032 0.78 .Pair condition (50-75% . .. ......... , glass) 49 69 79 84 0.15 0.39 OA 0.68 Good oondition, (>50% grass) 39 61 '74 80 T15 -6-H � 0.48 0,60 Trapervious areas k_ Pavement, roofs 98 98 98 98 0196 0-96 0.96 0.96 Gravel 76 85 89 91 OM 0.70 0.78 W�� -0.g-2 Dirt 72 $UZ 87 89 0,44 0:64 0.74 - 0,79 Urban districts Commercial and business Industrial . ,- 81 88 91 93 0.62 VO 0.92 AM 72 Residential areas lot size IA acre (town houses, condos 77 85 90 92 -0,54 65 114 acre 61 75 83 97 0.22 38 1/3 acre 57 72 81 86 0.15 30 117 acre 54 70 W 85 0-15 25 I Rom 51 68 79 04 0J5 036 0.58 0.68 20 2 sores 46 77 82 0.15 0.30 0.54 0,-64 12 A "cultural areas Pa4tare, grassland Poor 68 79 --19- '-6-3-6 -0 -59- -0.72 -0.-78- Fair 49 69 79 84 0,15 018 059 -0,-68 Good 39 61 74 80 0.15 10,221 0.49 040 ---wgow MOIYOLd) 30 58 71 78 0.15 10.16 0.42 -63-6 Brush 0.15 0.15 0.15 ­4]5- Poor r67 77 83 - .54 0.66 Fair -is- 35 56 70 77 U0,15034 0.15 15 10.15 0.40 0,54 Good 30 48 65 73 �15 OA5 0.15 () 15 0.30 OA6 Woods and grass (i�rc tar Poor 57 73 82 86 D.15 046 -"- 064 '; 072 Fair 43 5 65 76 015 �3 ( 0.64 Good 32 72 5 _I !0 0 0.16 0,44 1 0.59 Woods 'Poor 45 66+1-7 83 0.15 0.32 0.54 0-.66 rain 36 60 1 73 79 015 0.20 0.46 0.58 Good 30 55 70 77 0.15 0.15 0.40 Row r-rops, sti-aight, good 67 78 85 89 0.34 0.56 0.70 N0.54 0.79 Row -qopqc9jj Not . good -T- 5 82 43 S6 1). 0.30 '- - 'BO 0.64 0.72 Small a2in, good 63 75 97 0,26 L 6.�O -b766- 0,74 Farmsteaft 59---74­81-F 6 H --�- 1-8 1-6,48 0 1 0:6:4 0=72 In the table values of Rational C were computed from C = 0.020 CN -1.0 Source: Malcom 2003, Supplement to Elements of Urban Stormwater Design b. NRCS (SCS) Method: See Section 8.5.A.2 for both peak flow and volume calculations. c. Regional Regression Equation Analysis: Regression equations for rural and urban areas in North Carolina for various return periods are listed in the documents WRIR 96-4114 and WRIR 96-4084, The National Flood- Frequency Program-Methods for Estimating Flood Magnitude and FINAL April 20108 add 5 200100 8-80 Hydraflow Table of Contents Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2012 by Autodesk, Inc. v9 Williams pre post trial 4.gpw Friday, 00 14, 2013 WatershedModel Schematic ...................................................... ............................... 1 Hydrograph Return Period Recap .............................................. ............................... 2 - Year 27 SummaryReport .......................................................................................... ............................... 3 HydrographReports .................................................................................... ............................... 4 HydrographNo. 1, SCS Runoff, Pre Al ................................................... ............................... 4 Hydrograph No. 2, SCS Runoff, Pre B1 ................................................... ............................... 5 Hydrograph No. 3, SCS Runoff, Pre C1 ................................................... ............................... 6 Hydrograph No. 4, Combine, Pre Al and B1 ........................................... ............................... 7 Hydrograph No. 5, Combine, Pre Al B1 C1 .............................................. ............................... 8 Hydrograph No. 6, SCS Runoff, Post Al .................................................. ............................... 9 Hydrograph No. 7, SCS Runoff, Post B1 bypass ................................... ............................... 10 Hydrograph No. 8, SCS Runoff, Post to BMP1 ....................................... ............................... 11 Hydrograph No. 9, SCS Runoff, Post to roadway crossing ..................... ............................... 12 Hydrograph No. 10, SCS Runoff, Post C1 bypass .................................. ............................... 13 Hydrograph No. 11, SCS Runoff, Post C1 to BMP2 ............................... ............................... 14 Hydrograph No. 12, Reservoir, Route BMP1 .......................................... ............................... 15 PondReport - Dry Basin B2 ............................................................... ............................... 16 Hydrograph No. 13, Combine, Post Al bypass and BMP1 ..................... ............................... 17 Hydrograph No. 14, Reservoir, Route w/ BMP2 ...................................... ............................... 18 PondReport - Dry Pond C .................................................................. ............................... 19 Hydrograph No. 15, Combine, Post C w/ pond ....................................... ............................... 20 Hydrograph No. 16, SCS Runoff, bypass to Sabino way crossing .......... ............................... 21 Hydrograph No. 17, Combine, Sabino way crossing ............................... ............................... 22 Hydrograph No. 18, Reservoir, Route through roadway ......................... ............................... 23 Pond Report - Sabino way crossing ................................................... ............................... 24 Hydrograph No. 19, Combine, Post combine .......................................... ............................... 25 2 - Year Summary Report. ....................................................... ............................... 26 .. .............................. HydrographReports .................................................................................. ............................... 27 Hydrograph No. 1, SCS Runoff, Pre Al ................................................. ............................... 27 Hydrograph No. 2, SCS Runoff, Pre B1 ................................................. ............................... 28 Hydrograph No. 3, SCS Runoff, Pre C1 ................................................. ............................... 29 Hydrograph No. 4, Combine, Pre Al and B1 ......................................... ............................... 30 Hydrograph No. 5, Combine, Pre Al B1 C1 ............................................ ............................... 31 Hydrograph No. 6, SCS Runoff, Post Al ................................................ ............................... 32 Hydrograph No. 7, SCS Runoff, Post B1 bypass ................................... ............................... 33 Hydrograph No. 8, SCS Runoff, Post to BMP1 ....................................... ............................... 34 Hydrograph No. 9, SCS Runoff, Post to roadway crossing ..................... ............................... 35 Hydrograph No. 10, SCS Runoff, Post C1 bypass .................................. ............................... 36 Hydrograph No. 11, SCS Runoff, Post C1 to BMP2 ............................... ............................... 37 Hydrograph No. 12, Reservoir, Route BMP1 .......................................... ............................... 38 Hydrograph No. 13, Combine, Post Al bypass and BMP1 ..................... ............................... 39 Hydrograph No. 14, Reservoir, Route w/ BMP2 ...................................... ............................... 40 Hydrograph No. 15, Combine, Post C w/ pond ....................................... ............................... 41 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Contents continued... Williams pre post trial 4.gpw Hydrograph No. 16, SCS Runoff, bypass to Sabino way crossing .......... ............................... 42 Hydrograph No. 17, Combine, Sabino way crossing ............................... ............................... 43 Hydrograph No. 18, Reservoir, Route through roadway.. ...................................................... 44 Hydrograph No. 19, Combine, Post combine .......................................... ............................... 45 5 - Year SummaryReport ........................................................................................ ............................... 46 HydrographReports .................................................................................. ............................... 47 Hydrograph No. 1, SCS Runoff, Pre Al.. .............................................................................. 47 Hydrograph No. 2, SCS Runoff, Pre B1 ................................................. ............................... 48 Hydrograph No. 3, SCS Runoff, Pre Cl ................................................. ............................... 49 Hydrograph No. 4, Combine, Pre Al and B1 ......................................... ............................... 50 Hydrograph No. 5, Combine, Pre Al B1 Cl ............................................ ............................... 51 Hydrograph No. 6, SCS Runoff, Post Al ................................................ ............................... 52 Hydrograph No. 7, SCS Runoff, Post B1 bypass ................................... ............................... 53 Hydrograph No. 8, SCS Runoff, Post to BMP1 ....................................... ............................... 54 Hydrograph No. 9, SCS Runoff, Post to roadway crossing ..................... ............................... 55 Hydrograph No. 10, SCS Runoff, Post Cl bypass .................................. ............................... 56 Hydrograph No. 11, SCS Runoff, Post Cl to BMP2 ............................... ............................... 57 Hydrograph No. 12, Reservoir, Route BMP1 .......................................... ............................... 58 Hydrograph No. 13, Combine, Post Al bypass and BMP1 ..................... ............................... 59 Hydrograph No. 14, Reservoir, Route w/ BMP2 ...................................... ............................... 60 Hydrograph No. 15, Combine, Post C w/ pond ....................................... ............................... 61 Hydrograph No. 16, SCS Runoff, bypass to Sabino way crossing .......... ............................... 62 Hydrograph No. 17, Combine, Sabino way crossing ............................... ............................... 63 Hydrograph No. 18, Reservoir, Route through roadway ......................... ............................... 64 Hydrograph No. 19, Combine, Post combine .......................................... ............................... 65 10 -Year SummaryReport ........................................................................................ ............................... 66 HydrographReports .................................................................................. ............................... 67 Hydrograph No. 1, SCS Runoff, Pre Al ................................................. ............................... 67 Hydrograph No. 2, SCS Runoff, Pre B1 ................................................. ............................... 68 Hydrograph No. 3, SCS Runoff, Pre Cl ................................................. ............................... 69 Hydrograph No. 4, Combine, Pre Al and B1 ......................................... ............................... 70 Hydrograph No. 5, Combine, Pre Al B1 Cl ............................................ ............................... 71 U .Jr...�rne,h 1�I.+ R QI'Q Qiinnff Dnc� �'I 1 1 UrOgrcalph No. 6, vvv , Juno , i oSt A � ................................................ ............................... 72 Hydrograph No. 7, SCS Runoff, Post B1 bypass ................................... ............................... 73 Hydrograph No. 8, SCS Runoff, Post to BMP1 ....................................... ............................... 74 Hydrograph No. 9, SCS Runoff, Post to roadway crossing ..................... ............................... 75 Hydrograph No. 10, SCS Runoff, Post Cl bypass .................................. ............................... 76 Hydrograph No. 11, SCS Runoff, Post Cl to BMP2 ............................... ............................... 77 Hydrograph No. 12, Reservoir, Route BMP1 .......................................... ............................... 78 Hydrograph No. 13, Combine, Post Al bypass and BMP1 ..................... ............................... 79 Hydrograph No. 14, Reservoir, Route w/ BMP2 ...................................... ............................... 80 Hydrograph No. 15, Combine, Post C w/ pond ....................................... ............................... 81 Hydrograph No. 16, SCS Runoff, bypass to Sabino way crossing .......... ............................... 82 Hydrograph No. 17, Combine, Sabino way crossing ............................... ............................... 83 Hydrograph No. 18, Reservoir, Route through roadway ......................... ............................... 84 Hydrograph No. 19, Combine, Post combine .......................................... ............................... 85 You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) Contents continued... Williams pre post trial 4.gpw 25 - Year 106 SummaryReport ........................................................................................ ............................... 86 HydrographReports .................................................................................. ............................... 87 Hydrograph No. 1, SCS Runoff, Pre Al ................................................. ............................... 87 Hydrograph No. 2, SCS Runoff, Pre B1 ................................................. ............................... 88 Hydrograph No. 3, SCS Runoff, Pre C1 ................................................. ............................... 89 Hydrograph No. 4, Combine, Pre Al and B1 ......................................... ............................... 90 Hydrograph No. 5, Combine, Pre Al B1 C1 ............................................ ............................... 91 Hydrograph No. 6, SCS Runoff, Post Al ................................................ ............................... 92 Hydrograph No. 7, SCS Runoff, Post B1 bypass ................................... ............................... 93 Hydrograph No. 8, SCS Runoff, Post to BMP1 ....................................... ............................... 94 Hydrograph No. 9, SCS Runoff, Post to roadway crossing ..................... ............................... 95 Hydrograph No. 10, SCS Runoff, Post C1 bypass .................................. ............................... 96 Hydrograph No. 11, SCS Runoff, Post C1 to BMP2 ............................... ............................... 97 Hydrograph No. 12, Reservoir, Route BMP1 .......................................... ............................... 98 Hydrograph No. 13, Combine, Post Al bypass and BMP1 ..................... ............................... 99 Hydrograph No. 14, Reservoir, Route w/ BMP2 .................................... ............................... 100 Hydrograph No. 15, Combine, Post C w/ pond ..................................... ............................... 101 Hydrograph No. 16, SCS Runoff, bypass to Sabino way crossing ........ ............................... 102 Hydrograph No. 17, Combine, Sabino way crossing ............................. ............................... 103 Hydrograph No. 18, Reservoir, Route through roadway ....................... ............................... 104 Hydrograph No. 19, Combine, Post combine ........................................ ............................... 105 50 - Year SummaryReport ...................................................................................... ............................... 106 HydrographReports ................................................................................ ............................... 107 Hydrograph No. 1, SCS Runoff, Pre Al ............................................... ............................... 107 Hydrograph No. 2, SCS Runoff, Pre B1 ............................................... ............................... 108 Hydrograph No. 3, SCS Runoff, Pre C1 ............................................... ............................... 109 Hydrograph No. 4, Combine, Pre Al and B1 ....................................... ............................... 110 Hydrograph No. 5, Combine, Pre Al B1 C1 .......................................... ............................... 111 Hydrograph No. 6, SCS Runoff, Post Al .............................................. ............................... 112 Hydrograph No. 7, SCS Runoff, Post B1 bypass ................................. ............................... 113 Hydrograph No. 8, SCS Runoff, Post to BMP1 ..................................... ............................... 114 Hydrograph No. 9, SCS Runoff, Post to roadway crossing ................... ............................... 115 Ll I ,yd rog ap 4 No. 10, wC/v Runoff, Post C.11 hvypaac a ................................ ............................... 1 ' 4v : Hydrograph No. 11, SCS Runoff, Post C1 to BMP2 ............................. ............................... 117 Hydrograph No. 12, Reservoir, Route BMP1 ........................................ ............................... 118 Hydrograph No. 13, Combine, Post Al bypass and BMP1 ................... ............................... 119 Hydrograph No. 14, Reservoir, Route w/ BMP2 .................................... ............................... 120 Hydrograph No. 15, Combine, Post C w/ pond ..................................... ............................... 121 Hydrograph No. 16, SCS Runoff, bypass to Sabino way crossing ........ ............................... 122 Hydrograph No. 17, Combine, Sabino way crossing ............................. ............................... 123 Hydrograph No. 18, Reservoir, Route through roadway ....................... ............................... 124 Hydrograph No. 19, Combine, Post combine ........................................ ............................... 125 100 - Year SummaryReport ...................................................................................... ............................... 126 HydrographReports ................................................................................ ............................... 127 You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) Contents continued... Williams pre post trial 4.gpw Hydrograph No. 1, SCS Runoff, Pre Al ............................................... ............................... 127 Hydrograph No. 2, SCS Runoff, Pre B1 ............................................... ............................... 128 Hydrograph No. 3, SCS Runoff, Pre C1 ............................................... ............................... 129 Hydrograph No. 4, Combine, Pre Al and B1 ....................................... ............................... 130 Hydrograph No. 5, Combine, Pre Al B1 C1 .......................................... ............................... 131 Hydrograph No. 6, SCS Runoff, Post Al .............................................. ............................... 132 Hydrograph No. 7, SCS Runoff, Post B1 bypass ................................. ............................... 133 Hydrograph No. 8, SCS Runoff, Post to BMP1 ..................................... ............................... 134 Hydrograph No. 9, SCS Runoff, Post to roadway crossing ................... ............................... 135 Hydrograph No. 10, SCS Runoff, Post C1 bypass. ........................................................... — 136 Hydrograph No. 11, SCS Runoff, Post C1 to BMP2 ............................. ............................... 137 Hydrograph No. 12, Reservoir, Route BMP1 ........................................ ............................... 138 Hydrograph No. 13, Combine, Post Al bypass and BMP1 ................... ............................... 139 Hydrograph No. 14, Reservoir, Route w/ BMP2 .................................... ............................... 140 Hydrograph No. 15, Combine, Post C w/ pond ..................................... ............................... 141 Hydrograph No. 16, SCS Runoff, bypass to Sabino way crossing ........ ............................... 142 Hydrograph No. 17, Combine, Sabino way crossing ............................. ............................... 143 Hydrograph No. 18, Reservoir, Route through roadway ....................... ............................... 144 Hydrograph No. 19, Combine, Post combine ........................................ ............................... 145 You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www,novapdf.com) Watershed Model Schematic 1 HYdraflow Hydrographs Extension for AutoCADO Civil 3D(D 2012 by Autodesk, Inc. v9 J 2 3 7 12 91' CD 73 k" "Z 4 A ��q PihS OeV A,, 77 7 ri- Pw,VT 6F" 6 7!"1 4 51 112* 2Jq 13 PwIT r 8 CD Pasv 0'� 93 CD ami4 14VC 16 15 'V iv -v, Project: CACivil 3D Projects\Williams tract\Williams pre post trial 3.gpw V17 ry Monday, 00 11, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) T Tt� 9 10 D- Pasv 0'� 93 CD ami4 14VC 16 15 'V iv -v, Project: CACivil 3D Projects\Williams tract\Williams pre post trial 3.gpw V17 ry Monday, 00 11, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Hydrograph Return Period RecP� y raflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr 1 SCS Runoff - - - - -- 21.38 31.53 - - - - - -- 48.01 61.83 81.48 97.59 114.27 Pre Al 2 SCS Runoff - - - - -- 31.74 47.44 - - - - - -- 72.94 94.54 125.35 150.69 176.97 Pre B1 3 SCS Runoff - - - - -- 67.91 103.00 - - - - - -- 160.08 208.76 278.59 336.16 395.99 Pre C1 4 Combine 1, 2, 53.12 78.97 - - - - - -- 120.96 156.37 206.84 248.28 291.24 Pre Al and B1 5 Combine 3,4 121.03 1 181.96 - - - - - - -- 28097 36513 485 43 584.45 687.23 Pre Al B1 C1 6 SCS Runoff - - - - -- 12.84 18.24 - - - - - -- 26.84 34.02 44.12 52.35 60.82 Post Al 7 SCS Runoff - - - - -- 9.542 15.56 - - - - - -- 25.61 34.15 46.76 57.36 68.46 Post B1 bypass 8 SCS Runoff - - - - -- 28.18 38.90 - - - - - -- 56.05 69.90 89.21 104.83 120.85 Post to BMP1 9 SCS Runoff - - - - -- 9.647 12.62 - - - - - -- 17.10 20.62 25.47 29.35 33.30 Post to roadway crossing 10 SCS Runoff - - - - -- 50.47 77.76 - - - - - -- 122.44 160.43 215.51 261.06 308.49 Post C1 bypass 11 SCS Runoff - - - - -- 22.31 30.22 - - - - - -- 42.36 52.04 65.44 76.21 87.23 Post C1 to BMP2 12 Reservoir 8 13.50 15.94 - - - - - -- 47.04 65.75 86.49 101.94 117.86 Route BMP1 13 Combine 6, 12 24.59 35.06 - - - - - -- 77.36 101.25 130.58 153.96 177.85 Post Al bypass and BMP1 14 Reservoir 11 4.081 22.26 - - - - - -- 29.55 44.61 62.14 73.97 85.14 Route w/ BMP2 15 Combine 10,14 50.67 98.85 - - - - - -- 151.67 205.04 273.30 328.09 384.76 Post C w/ pond 16 SCS Runoff - - - - -- 16.14 22.93 - - - - - -- 33.75 42.77 55.47 65.81 76.45 bypass to Sabino way crossing 17 Combine 7, 9, 16 33.40 48.62 - - - - - -- 73.07 93.28 122.02 145.60 170.05 Sabino way crossing 18 Reservoir 17 32.08 46.66 - - - - - -- 67.82 83.87 99.38 111.27 122.15 Route through roadway 19 Combine 13, 15 18 L119.69 �j 180.44 P - - - - - -- i 296.27 f, 379.761, 488.05 i, 576.49 665.18 T ` Post combine F k IZO T _r q c� 44 1'4 $, r=� -� {. °' toe VV Proj. file: Williams pre post trial 4.gpw Friday, 00 14, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) Hydrograph Summary Report 3 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 21.38 2 722 57,214 - - - - -- - - - - -- - - - - -- Pre Al 2 SCS Runoff 31.74 2 722 85,592 - - - - -- - - - - -- - - - - -- Pre 131 3 SCS Runoff 67.91 2 722 184,897 - - - - -- - - - - -- - - - - -- Pre C1 4 Combine 53.12 2 722 142,806 1, 2, - - - - -- - - - - -- Pre Al and 131 5 Combine 121.03 2 722 327,702 3,4 - - - - -- - - - - -- Pre Al 131 C1 6 SCS Runoff 12.84 2 718 25,679 - - - - -- - - - - -- - - - - -- Post Al 7 SCS Runoff 9.542 2 722 27,544 - - - - -- - - - - -- - - - - -- Post 131 bypass 8 SCS Runoff 28.18 2 718 56,489 - - - - -- - - - - -- - - - - -- Post to BMP1 9 SCS Runoff 9.647 2 716 19,629 - - - - -- - - - - -- - - - - -- Post to roadway crossing 10 SCS Runoff 50.47 2 722 138,957 - - - - -- - - - - -- - - - - -- Post C1 bypass 11 SCS Runoff 22.31 2 716 45,047 - - - - -- - - - - -- - - - - -- Post C1 to BMP2 12 Reservoir 13.50 2 722 56,444 8 320.19 19,299 Route BMP1 13 Combine 24.59 2 718 82,124 6,12 - - - - -- - - - - -- Post Al bypass and BMP1 14 Reservoir 4.081 2 726 44,850 11 306.67 20,915 Route w/ BMP2 15 Combine 50.67 2 722 183,807 10,14 - - - - -- - - - - -- Post C w/ pond 16 SCS Runoff 16.14 2 718 32,283 - - - - -- - - - - -- - - - - -- bypass to Sabino way crossing 17 Combine 33.40 2 718 79,455 7, 9, 16 - - - - -- - - - - -- Sabino way crossing 18 Reservoir 32.08 2 718 79,455 17 318.10 950 Route through roadway 19 Combine 119.69 2 720 345,466 13, 15, 18 - - - - -- - - - - -- Post combine Williams pre post trial 4.gpw Return Period: 1 Year Friday, 00 14, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 1 Pre Al Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 15.800 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 3.01 in Storm duration = 24 hrs Q (cfs) 24.00 16.00 12.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 4 Friday, 00 14, 2013 = 21.38 cfs = 722 min = 57,214 cuft = 75 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 2 Pre B1 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 25.000 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 3.01 in Storm duration = 24 hrs Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Friday, 00 14, 2013 = 31.74 cfs = 722 min = 85,592 cuft = 74 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 3 Pre C1 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 57.200 ac Basin Slope = 1.1 % Tc method = KIRPICH Total precip. = 3.01 in Storm duration = 24 hrs Q (cfs) 70.00 50.00 K� 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre C1 Hyd. No. 3 -- 1 Year LGI Friday, 00 14, 2013 = 67.91 cfs = 722 min = 184,897 cuft = 73 = 1400 ft = 11.71 min = Type II = 484 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com I M Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 4 Pre Al and B1 Hydrograph type = Combine Peak discharge = 53.12 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 142,806 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 40.800 ac Q (cfs) 60.00 50.00 K� 30.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Hyd No. 1 Hyd No. 2 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 5 Pre Al B1 C1 Hydrograph type = Combine Peak discharge = 121.03 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 327,702 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 57.200 ac Q (cfs) 140.00 120.00 100.00 40.00 20.00 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Hyd No. 3 Hyd No. 4 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 6 Post Al Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 7.000 ac Basin Slope = 2.5% Tc method = User Total precip. = 3.01 in Storm duration = 24 hrs Q (cfs) 14.00 12.00 10.00 AM 4.00 2.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Friday, 00 14, 2013 = 12.84 cfs = 718 min = 25,679 cuft = 77 = 1900 ft = 5.00 min = Type II = 484 Q (cfs) 14.00 12.00 10.00 1111M 4.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 7 Post B1 bypass Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 10.900 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 3.01 in Storm duration = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post 1131 bypass 10 Friday, 00 14, 2013 = 9.542 cfs = 722 min = 27,544 cuft = 69 = 1900 ft = 10.80 min = Type II = 484 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 8 Post to BMP1 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 13.200 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.01 in Storm duration = 24 hrs Q (cfs) 30.00 25.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 11 Friday, 00 14, 2013 = 28.18 cfs = 718 min = 56,489 cuft = 80 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 8 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 9 Post to roadway crossing Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 3.300 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.01 in Storm duration = 24 hrs Q (cfs) 10.00 N. Me 4.00 2.00 ri.T.'M Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 12 Friday, 00 14, 2013 = 9.647 cfs = 716 min = 19,629 cuft = 87 = 0 ft = 5.00 min = Type II = 484 0 120 240 360 480 600 720 Hyd No. 9 Q (cfs) 10.00 R1 4.00 2.00 r.T.TA 840 960 1080 1200 1320 1440 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 10 Post C1 bypass Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 45.600 ac Basin Slope = 1.1 % Tc method = KIRPICH Total precip. = 3.01 in Storm duration = 24 hrs Q (cfs) 60.00 50.00 K� 30.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post C1 bypass Hyd. No. 10 -- 1 Year 13 Friday, 00 14, 2013 = 50.47 cfs = 722 min = 138,957 cuft = 72 = 1400 ft = 11.71 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 11 Post C1 to BMP2 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 9.100 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.01 in Storm duration = 24 hrs Q (cfs) 24.00 16.00 12.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 14 Friday, 00 14, 2013 = 22.31 cfs = 716 min = 45,047 cuft = 83 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 15 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 12 Route BMP1 Hydrograph type = Reservoir Peak discharge = 13.50 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 56,444 cuft Inflow hyd. No. = 8 - Post to BMP1 Max. Elevation = 320.19 ft Reservoir name = Dry Basin B2 Max. Storage = 19,299 cuft Storage Indication method used Route BMP1 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Pond Report 16 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Pond No. 1 - Dry Basin B2 Pond Data Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 317.00 ft Stage / Storage Table Stage (ft) Elevation (ft) 1.00 Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) = .013 .013 0.00 317.00 Orifice Coeff. 4,500 0.60 0 0 Multi -Stage = n/a 1.00 318.00 No TW Elev. (ft) = 0.00 5,450 4,967 4,967 2.00 319.00 6,450 5,942 10,909 3.00 320.00 7,500 6,968 17,877 4.00 321.00 8,600 8,043 25,920 5.00 322.00 9,800 9,193 35,113 6.00 323.00 11,000 10,393 45,506 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRSr] [A] [B] [C] [D] Rise (in) = 18.00 3.00 0.00 0.00 Crest Len (ft) = 16.00 25.00 0.00 0.00 Span (in) = 18.00 3.00 0.00 0.00 Crest El. (ft) = 319.50 321.20 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 317.00 317.00 0.00 0.00 Weir Type = 1 Rect - -- - -- Length (ft) = 60.00 1.00 0.00 0.00 Multi -Stage = Yes No No No Slope ( %) = 1.00 1.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in /hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Stage (ft) 6.00 5.00 4.00 milli 2.00 M 0.00 0.0 20.0 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 40.0 60.0 Stage / Discharge Elev (ft) 323.00 322.00 321.00 99*111It 319.00 318.00 317.00 80.0 100.0 120.0 140.0 160.0 180.0 200.0 220.0 240.0 Discharge (cfs) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 13 Post Al bypass and BMP1 Hydrograph type = Combine Peak discharge = 24.59 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 82,124 cuft Inflow hyds. = 6, 12 Contrib. drain. area = 7.000 ac Post Al bypass and BMP1 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 18 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 14 Route w/ BMP2 Hydrograph type = Reservoir Peak discharge = 4.081 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 44,850 cuft Inflow hyd. No. = 11 - Post C1 to BMP2 Max. Elevation = 306.67 ft Reservoir name = Dry Pond C Max. Storage = 20,915 cuft Storage Indication method used Q (cfs) 24.00 16.00 12.00 Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 4320 Time (min) Hyd No. 14 Hyd No. 11 Total storage used = 20,915 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Pond Report 19 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Pond No. 2 - Dry Pond C Pond Data Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 303.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 303.00 5,100 0 0 1.00 304.00 5,450 5,274 5,274 2.00 305.00 5,775 5,611 10,885 3.00 306.00 6,000 5,887 16,771 4.00 307.00 6,350 6,174 22,945 5.00 308.00 6,700 6,524 29,468 6.00 309.00 7,100 6,898 36,367 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRSr] [A] [B] [C] [D] Rise (in) = 24.00 2.00 0.00 0.00 Crest Len (ft) = 16.00 20.00 0.00 0.00 Span (in) = 24.00 2.00 0.00 0.00 Crest El. (ft) = 306.50 307.75 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 303.00 303.00 0.00 0.00 Weir Type = 1 Rect - -- - -- Length (ft) = 60.00 1.00 0.00 0.00 Multi -Stage = Yes No No No Slope ( %) = 1.00 1.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in /hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Stage (ft) 6.00 5.00 4.00 milli 2.00 M Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s) Elev (ft) 309.00 308.00 307.00 Bill -VIt 305.00 304.00 0.00 ' ' ' ' ' ' ' ' ' ' ' ' ' ' 303.00 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 Total Q Discharge (cfs) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 20 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 15 Post C w/ pond Hydrograph type = Combine Peak discharge = 50.67 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 183,807 cuft Inflow hyds. = 10, 14 Contrib. drain. area = 45.600 ac Q (cfs) 60.00 50.00 K� 30.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 Hyd No. 10 Hyd No. 14 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 16 bypass to Sabino way crossing Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 8.800 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.01 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 • ffle 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 21 Friday, 00 14, 2013 = 16.14 cfs = 718 min = 32,283 cuft = 77 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 18.00 15.00 12.00 MM 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 16 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 22 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 17 Sabino way crossing Hydrograph type = Combine Peak discharge = 33.40 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 79,455 cuft Inflow hyds. = 7, 9, 16 Contrib. drain. area = 23.000 ac Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Hyd No. 7 Hyd No. 9 Hyd No. 16 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 23 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 18 Route through roadway Hydrograph type = Reservoir Peak discharge = 32.08 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 79,455 cuft Inflow hyd. No. = 17 - Sabino way crossing Max. Elevation = 318.10 ft Reservoir name = Sabino way crossing Max. Storage = 950 cuft Storage Indication method used Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 18 Hyd No. 17 Total storage used = 950 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Pond Report 24 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Pond No. 3 - Sabino way crossing Pond Data Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 316.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 316.00 100 0 0 1.00 317.00 260 174 174 2.00 318.00 1,100 632 805 3.00 319.00 3,500 2,187 2,992 4.00 320.00 7,500 5,374 8,366 5.00 321.00 11,500 9,428 17,794 6.00 322.00 15,000 13,210 31,004 9.00 325.00 25,000 59,359 90,363 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRSr] [A] [B] [C] [D] Rise (in) = 48.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 48.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 316.00 0.00 0.00 0.00 Weir Type = - -- - -- - -- - -- Length (ft) = 120.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope ( %) = 2.00 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in /hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Stage (ft) 10.00 8.00 Am 4.00 2.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 326.00 324.00 322.00 320.00 318.00 0.00 1 1 1 1 1 1 1 1 1 1 316.00 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 Total Q Discharge (cfs) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 25 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 19 Post combine Hydrograph type = Combine Peak discharge = 119.69 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 345,466 cuft Inflow hyds. = 13, 15, 18 Contrib. drain. area = 0.000 ac Q (cfs) 120.00 100.00 K� Q (cfs) 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 19 Hyd No. 13 Hyd No. 15 Hyd No. 18 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Summary Report 26 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 31.53 2 722 82,912 - - - - -- - - - - -- - - - - -- Pre Al 2 SCS Runoff 47.44 2 722 125,168 - - - - -- - - - - -- - - - - -- Pre 131 3 SCS Runoff 103.00 2 722 272,943 - - - - -- - - - - -- - - - - -- Pre C1 4 Combine 78.97 2 722 208,079 1, 2, - - - - -- - - - - -- Pre Al and 131 5 Combine 181.96 2 722 481,022 3,4 - - - - -- - - - - -- Pre Al 131 C1 6 SCS Runoff 18.24 2 718 36,574 - - - - -- - - - - -- - - - - -- Post Al 7 SCS Runoff 15.56 2 722 42,390 - - - - -- - - - - -- - - - - -- Post 131 bypass 8 SCS Runoff 38.90 2 716 78,529 - - - - -- - - - - -- - - - - -- Post to BMP1 9 SCS Runoff 12.62 2 716 25,927 - - - - -- - - - - -- - - - - -- Post to roadway crossing 10 SCS Runoff 77.76 2 722 207,141 - - - - -- - - - - -- - - - - -- Post C1 bypass 11 SCS Runoff 30.22 2 716 61,222 - - - - -- - - - - -- - - - - -- Post C1 to BMP2 12 Reservoir 15.94 2 722 78,485 8 321.10 26,561 Route BMP1 13 Combine 35.06 2 720 115,059 6,12 - - - - -- - - - - -- Post Al bypass and BMP1 14 Reservoir 22.26 2 720 61,025 11 307.07 23,330 Route w/ BMP2 15 Combine 98.85 2 720 268,166 10,14 - - - - -- - - - - -- Post C w/ pond 16 SCS Runoff 22.93 2 718 45,979 - - - - -- - - - - -- - - - - -- bypass to Sabino way crossing 17 Combine 48.62 2 718 114,296 7, 9, 16 - - - - -- - - - - -- Sabino way crossing 18 Reservoir 46.66 2 718 114,296 17 318.63 2,058 Route through roadway 19 Combine 180.44 2 720 497,601 13, 15, 18 - - - - -- - - - - -- Post combine Williams pre post trial 4.gpw Return Period: 2 Year Friday, 00 14, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 1 Pre Al Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 15.800 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 3.64 in Storm duration = 24 hrs Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 27 Friday, 00 14, 2013 = 31.53 cfs = 722 min = 82,912 cuft = 75 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 2 Pre B1 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 25.000 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 3.64 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 2 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre 1131 Hyd. No. 2 -- 2 Year 28 Friday, 00 14, 2013 = 47.44 cfs = 722 min = 125,168 cuft = 74 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 r.T.T.11 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 3 Pre C1 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 57.200 ac Basin Slope = 1.1 % Tc method = KIRPICH Total precip. = 3.64 in Storm duration = 24 hrs Q (cfs) 120.00 100.00 K� Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre C1 Hyd. No. 3 -- 2 Year 29 Friday, 00 14, 2013 = 103.00 cfs = 722 min = 272,943 cuft = 73 = 1400 ft = 11.71 min = Type II = 484 Q (cfs) 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 30 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 4 Pre Al and B1 Hydrograph type = Combine Peak discharge = 78.97 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 208,079 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 40.800 ac Q (cfs) 80.00 70.00 50.00 K� 30.00 10.00 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Hyd No. 1 Hyd No. 2 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 31 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 5 Pre Al B1 C1 Hydrograph type = Combine Peak discharge = 181.96 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 481,022 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 57.200 ac Q (cfs) 210.00 180.00 150.00 120.00 -1 1I 30.00 Q (cfs) 210.00 180.00 150.00 120.00 *1 10 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Hyd No. 3 Hyd No. 4 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 6 Post Al Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 7.000 ac Basin Slope = 2.5% Tc method = User Total precip. = 3.64 in Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 • m . Me 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 32 Friday, 00 14, 2013 = 18.24 cfs = 718 min = 36,574 cuft = 77 = 1900 ft = 5.00 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 1111M M1111 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 7 Post B1 bypass Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 10.900 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 3.64 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 • ffle 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 33 Friday, 00 14, 2013 = 15.56 cfs = 722 min = 42,390 cuft = 69 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 18.00 15.00 12.00 MM 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 8 Post to BMP1 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 13.200 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.64 in Storm duration = 24 hrs Post to BMP1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 34 Friday, 00 14, 2013 = 38.90 cfs = 716 min = 78,529 cuft = 80 = 0 ft = 5.00 min = Type II = 484 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 9 Post to roadway crossing Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 3.300 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.64 in Storm duration = 24 hrs Q (cfs) 14.00 12.00 10.00 AM 4.00 2.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 35 Friday, 00 14, 2013 12.62 cfs 716 min 25,927 cuff 87 0 ft 5.00 min Type II 484 Q (cfs) 14.00 12.00 10.00 1111M 4.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 9 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 10 Post C1 bypass Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 45.600 ac Basin Slope = 1.1 % Tc method = KIRPICH Total precip. = 3.64 in Storm duration = 24 hrs Q (cfs) 80.00 70.00 50.00 K� 30.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 36 Friday, 00 14, 2013 77.76 cfs 722 min 207,141 cuff 72 1400 ft 11.71 min Type II 484 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 11 Post C1 to BMP2 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 9.100 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.64 in Storm duration = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post C1 to BMP2 37 Friday, 00 14, 2013 = 30.22 cfs = 716 min = 61,222 cuft = 83 = 0 ft = 5.00 min = Type II = 484 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 38 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 12 Route BMP1 Hydrograph type = Reservoir Peak discharge = 15.94 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 78,485 cuft Inflow hyd. No. = 8 - Post to BMP1 Max. Elevation = 321.10 ft Reservoir name = Dry Basin B2 Max. Storage = 26,561 cuft Storage Indication method used Route BMP1 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 39 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 13 Post Al bypass and BMP1 Hydrograph type = Combine Peak discharge = 35.06 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 115,059 cuft Inflow hyds. = 6, 12 Contrib. drain. area = 7.000 ac Post Al bypass and BMP1 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 40 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 14 Route w/ BMP2 Hydrograph type = Reservoir Peak discharge = 22.26 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 61,025 cuft Inflow hyd. No. = 11 - Post C1 to BMP2 Max. Elevation = 307.07 ft Reservoir name = Dry Pond C Max. Storage = 23,330 cuft Storage Indication method used Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 14 Hyd No. 11 Total storage used = 23,330 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report 41 Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 15 Post C w/ pond Hydrograph type = Combine Peak discharge = 98.85 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 268,166 cuft Inflow hyds. = 10, 14 Contrib. drain. area = 45.600 ac Q (cfs) 100.00 -I 11 40.00 20.00 0.00 0 120 240 Hyd No. 15 Q (cfs) 100.00 :I I1 40.00 20.00 r.T.T.'s 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Hyd No. 14 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 16 bypass to Sabino way crossing Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 8.800 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.64 in Storm duration = 24 hrs Q (cfs) 24.00 16.00 12.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 42 Friday, 00 14, 2013 = 22.93 cfs = 718 min = 45,979 cuft = 77 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 16 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 43 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 17 Sabino way crossing Hydrograph type = Combine Peak discharge = 48.62 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 114,296 cuft Inflow hyds. = 7, 9, 16 Contrib. drain. area = 23.000 ac Sabino way crossing You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 44 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 18 Route through roadway Hydrograph type = Reservoir Peak discharge = 46.66 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 114,296 cuft Inflow hyd. No. = 17 - Sabino way crossing Max. Elevation = 318.63 ft Reservoir name = Sabino way crossing Max. Storage = 2,058 cuft Storage Indication method used Q (cfs) 50.00 40.00 30.00 20.00 10.00 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 18 Hyd No. 17 Total storage used = 2,058 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 45 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 19 Post combine Hydrograph type = Combine Peak discharge = 180.44 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 497,601 cuft Inflow hyds. = 13, 15, 18 Contrib. drain. area = 0.000 ac Q (cfs) 210.00 180.00 150.00 120.00 -1 1I 30.00 Q (cfs) 210.00 180.00 150.00 120.00 *1 10 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 19 Hyd No. 13 Hyd No. 15 Hyd No. 18 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Summary Report 46 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 48.01 2 720 124,992 - - - - -- - - - - -- - - - - -- Pre Al 2 SCS Runoff 72.94 2 720 190,361 - - - - -- - - - - -- - - - - -- Pre 131 3 SCS Runoff 160.08 2 722 418,873 - - - - -- - - - - -- - - - - -- Pre C1 4 Combine 120.96 2 720 315,353 1, 2, - - - - -- - - - - -- Pre Al and 131 5 Combine 280.97 2 720 734,226 3,4 - - - - -- - - - - -- Pre Al 131 C1 6 SCS Runoff 26.84 2 716 54,213 - - - - -- - - - - -- - - - - -- Post Al 7 SCS Runoff 25.61 2 722 67,653 - - - - -- - - - - -- - - - - -- Post 131 bypass 8 SCS Runoff 56.05 2 716 113,644 - - - - -- - - - - -- - - - - -- Post to BMP1 9 SCS Runoff 17.10 2 716 35,639 - - - - -- - - - - -- - - - - -- Post to roadway crossing 10 SCS Runoff 122.44 2 722 320,864 - - - - -- - - - - -- - - - - -- Post C1 bypass 11 SCS Runoff 42.36 2 716 86,612 - - - - -- - - - - -- - - - - -- Post C1 to BMP2 12 Reservoir 47.04 2 720 113,599 8 321.72 32,392 Route BMP1 13 Combine 77.36 2 718 167,812 6,12 - - - - -- - - - - -- Post Al bypass and BMP1 14 Reservoir 29.55 2 720 86,414 11 307.78 27,810 Route w/ BMP2 15 Combine 151.67 2 720 407,278 10,14 - - - - -- - - - - -- Post C w/ pond 16 SCS Runoff 33.75 2 716 68,153 - - - - -- - - - - -- - - - - -- bypass to Sabino way crossing 17 Combine 73.07 2 718 171,446 7, 9, 16 - - - - -- - - - - -- Sabino way crossing 18 Reservoir 67.82 2 720 171,446 17 319.30 4,460 Route through roadway 19 Combine 296.27 2 720 746,617 13, 15, 18 - - - - -- - - - - -- Post combine Williams pre post trial 4.gpw Return Period: 5 Year Friday, 00 14, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 1 Pre Al Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 15.800 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 4.58 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre Al Hyd. No. 1 -- 5 Year 47 Friday, 00 14, 2013 = 48.01 cfs = 720 min = 124,992 cuft = 75 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 r.T.T.'s 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 2 Pre B1 Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 25.000 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 4.58 in Storm duration = 24 hrs Q (cfs) 80.00 70.00 50.00 K� 30.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 48 Friday, 00 14, 2013 72.94 cfs 720 min 190,361 cuff 74 1900 ft 10.80 min Type II 484 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 3 Pre C1 Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 57.200 ac Basin Slope = 1.1 % Tc method = KIRPICH Total precip. = 4.58 in Storm duration = 24 hrs Q (cfs) 180.00 160.00 140.00 120.00 100.00 60.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 49 Friday, 00 14, 2013 160.08 cfs 722 min 418,873 cuff 73 1400 ft 11.71 min Type II 484 Q (cfs) 180.00 160.00 140.00 120.00 100.00 60.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 50 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 4 Pre Al and B1 Hydrograph type = Combine Peak discharge = 120.96 cfs Storm frequency = 5 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 315,353 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 40.800 ac Q (cfs) 140.00 120.00 100.00 40.00 20.00 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Hyd No. 1 Hyd No. 2 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 51 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 5 Pre Al B1 C1 Hydrograph type = Combine Peak discharge = 280.97 cfs Storm frequency = 5 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 734,226 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 57.200 ac Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Hyd No. 3 Hyd No. 4 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 6 Post Al Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 7.000 ac Basin Slope = 2.5% Tc method = User Total precip. = 4.58 in Storm duration = 24 hrs Q (cfs) 28.00 24.00 20.00 16.00 12.00 N. Me 4.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 52 Friday, 00 14, 2013 = 26.84 cfs = 716 min = 54,213 cuft = 77 = 1900 ft = 5.00 min = Type II = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 R1 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 7 Post B1 bypass Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 10.900 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 4.58 in Storm duration = 24 hrs Q (cfs) 28.00 24.00 20.00 16.00 12.00 N. Me 4.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 53 Friday, 00 14, 2013 = 25.61 cfs = 722 min = 67,653 cuft = 69 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 R1 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 8 Post to BMP1 Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 13.200 ac Basin Slope = 0.0% Tc method = User Total precip. = 4.58 in Storm duration = 24 hrs Q (cfs) 60.00 50.00 K� 30.00 10.00 r wIT.'M Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post to BMP1 Hyd. No. 8 -- 5 Year 0 120 240 360 480 600 720 Hyd No. 8 54 Friday, 00 14, 2013 = 56.05 cfs = 716 min = 113,644 cuft = 80 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 MWIT.'s 840 960 1080 1200 1320 1440 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 9 Post to roadway crossing Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 3.300 ac Basin Slope = 0.0% Tc method = User Total precip. = 4.58 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 • ffle 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 55 Friday, 00 14, 2013 17.10 cfs 716 min 35,639 cuff 87 0 ft 5.00 min Type II 484 Q (cfs) 18.00 15.00 12.00 MM 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 9 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 10 Post C1 bypass Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 45.600 ac Basin Slope = 1.1 % Tc method = KIRPICH Total precip. = 4.58 in Storm duration = 24 hrs Q (cfs) 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post C1 bypass Hyd. No. 10 -- 5 Year 56 Friday, 00 14, 2013 = 122.44 cfs = 722 min = 320,864 cuft = 72 = 1400 ft = 11.71 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 11 Post C1 to BMP2 Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 9.100 ac Basin Slope = 0.0% Tc method = User Total precip. = 4.58 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 57 Friday, 00 14, 2013 42.36 cfs 716 min 86,612 cuff 83 0 ft 5.00 min Type II 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 11 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 58 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 12 Route BMP1 Hydrograph type = Reservoir Peak discharge = 47.04 cfs Storm frequency = 5 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 113,599 cuft Inflow hyd. No. = 8 - Post to BMP1 Max. Elevation = 321.72 ft Reservoir name = Dry Basin B2 Max. Storage = 32,392 cuft Storage Indication method used Q (cfs) 60.00 50.00 K� 30.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 12 Hyd No. 8 Total storage used = 32,392 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 59 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 13 Post Al bypass and BMP1 Hydrograph type = Combine Peak discharge = 77.36 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 167,812 cuft Inflow hyds. = 6, 12 Contrib. drain. area = 7.000 ac Q (cfs) 80.00 70.00 50.00 K� 30.00 10.00 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Hyd No. 6 Hyd No. 12 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 14 Route w/ BMP2 Hydrograph type = Reservoir Peak discharge = 29.55 cfs Storm frequency = 5 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 86,414 cuft Inflow hyd. No. = 11 - Post C1 to BMP2 Max. Elevation = 307.78 ft Reservoir name = Dry Pond C Max. Storage = 27,810 cuft Storage Indication method used Q (cfs) 50.00 40.00 30.00 20.00 10.00 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 14 Hyd No. 11 Total storage used = 27,810 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 61 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 15 Post C w/ pond Hydrograph type = Combine Peak discharge = 151.67 cfs Storm frequency = 5 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 407,278 cuft Inflow hyds. = 10, 14 Contrib. drain. area = 45.600 ac Q (cfs) 160.00 140.00 120.00 100.00 -1 1I K� 20.00 Q (cfs) 160.00 140.00 120.00 100.00 *1 10 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 Hyd No. 10 Hyd No. 14 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 16 bypass to Sabino way crossing Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 8.800 ac Basin Slope = 0.0% Tc method = User Total precip. = 4.58 in Storm duration = 24 hrs Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Friday, 00 14, 2013 = 33.75 cfs = 716 min = 68,153 cuft = 77 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 16 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 63 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 17 Sabino way crossing Hydrograph type = Combine Peak discharge = 73.07 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 171,446 cuft Inflow hyds. = 7, 9, 16 Contrib. drain. area = 23.000 ac Q (cfs) 80.00 70.00 50.00 K� 30.00 10.00 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Hyd No. 7 Hyd No. 9 Hyd No. 16 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 64 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 18 Route through roadway Hydrograph type = Reservoir Peak discharge = 67.82 cfs Storm frequency = 5 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 171,446 cuft Inflow hyd. No. = 17 - Sabino way crossing Max. Elevation = 319.30 ft Reservoir name = Sabino way crossing Max. Storage = 4,460 cuft Storage Indication method used Q (cfs) 80.00 70.00 50.00 K� 30.00 10.00 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 18 Hyd No. 17 Total storage used = 4,460 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 65 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 19 Post combine Hydrograph type = Combine Peak discharge = 296.27 cfs Storm frequency = 5 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 746,617 cuft Inflow hyds. = 13, 15, 18 Contrib. drain. area = 0.000 ac Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 19 Hyd No. 13 Hyd No. 15 Hyd No. 18 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Summary Report H-. Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 61.83 2 720 160,358 - - - - -- - - - - -- - - - - -- Pre Al 2 SCS Runoff 94.54 2 720 245,387 - - - - -- - - - - -- - - - - -- Pre 131 3 SCS Runoff 208.76 2 720 542,596 - - - - -- - - - - -- - - - - -- Pre C1 4 Combine 156.37 2 720 405,746 1, 2, - - - - -- - - - - -- Pre Al and 131 5 Combine 365.13 2 720 948,341 3,4 - - - - -- - - - - -- Pre Al 131 C1 6 SCS Runoff 34.02 2 716 68,914 - - - - -- - - - - -- - - - - -- Post Al 7 SCS Runoff 34.15 2 722 89,484 - - - - -- - - - - -- - - - - -- Post 131 bypass 8 SCS Runoff 69.90 2 716 142,572 - - - - -- - - - - -- - - - - -- Post to BMP1 9 SCS Runoff 20.62 2 716 43,457 - - - - -- - - - - -- - - - - -- Post to roadway crossing 10 SCS Runoff 160.43 2 720 417,722 - - - - -- - - - - -- - - - - -- Post C1 bypass 11 SCS Runoff 52.04 2 716 107,307 - - - - -- - - - - -- - - - - -- Post C1 to BMP2 12 Reservoir 65.75 2 718 142,528 8 321.91 34,120 Route BMP1 13 Combine 101.25 2 718 211,441 6,12 - - - - -- - - - - -- Post Al bypass and BMP1 14 Reservoir 44.61 2 720 107,109 11 308.14 30,172 Route w/ BMP2 15 Combine 205.04 2 720 524,831 10,14 - - - - -- - - - - -- Post C w/ pond 16 SCS Runoff 42.77 2 716 86,634 - - - - -- - - - - -- - - - - -- bypass to Sabino way crossing 17 Combine 93.28 2 718 219,575 7, 9, 16 - - - - -- - - - - -- Sabino way crossing 18 Reservoir 83.87 2 720 219,575 17 319.90 7,813 Route through roadway 19 Combine 379.76 2 720 955,928 13, 15, 18 - - - - -- - - - - -- Post combine Williams pre post trial 4.gpw Return Period: 10 Year Friday, 00 14, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 1 Pre Al Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 15.800 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 5.32 in Storm duration = 24 hrs Q (cfs) 70.00 50.00 K� 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre Al Hyd. No. 1 -- 10 Year 67 Friday, 00 14, 2013 = 61.83 cfs = 720 min = 160,358 cuft = 75 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 2 Pre B1 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 25.000 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 5.32 in Storm duration = 24 hrs Q (cfs) 100.00 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre 1131 Hyd. No. 2 -- 10 Year Friday, 00 14, 2013 = 94.54 cfs = 720 min = 245,387 cuft = 74 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 100.00 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 3 Pre C1 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 57.200 ac Basin Slope = 1.1 % Tc method = KIRPICH Total precip. = 5.32 in Storm duration = 24 hrs Q (cfs) 210.00 180.00 150.00 120.00 -1 1I 30.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre C1 Hyd. No. 3 -- 10 Year Friday, 00 14, 2013 = 208.76 cfs = 720 min = 542,596 cuft = 73 = 1400 ft = 11.71 min = Type II = 484 Q (cfs) 210.00 180.00 150.00 120.00 *1 10 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 70 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 4 Pre Al and B1 Hydrograph type = Combine Peak discharge = 156.37 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 405,746 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 40.800 ac Q (cfs) 160.00 140.00 120.00 100.00 -1 1I K� 20.00 Q (cfs) 160.00 140.00 120.00 100.00 *1 10 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Hyd No. 1 Hyd No. 2 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 71 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 5 Pre Al B1 C1 Hydrograph type = Combine Peak discharge = 365.13 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 948,341 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 57.200 ac Q (cfs) 400.00 350.00 250.00 200.00 150.00 100.00 50.00 Q (cfs) 400.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Hyd No. 3 Hyd No. 4 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 6 Post Al Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 7.000 ac Basin Slope = 2.5% Tc method = User Total precip. = 5.32 in Storm duration = 24 hrs Post Al Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 72 Friday, 00 14, 2013 = 34.02 cfs = 716 min = 68,914 cuft = 77 = 1900 ft = 5.00 min = Type II = 484 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 7 Post B1 bypass Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 10.900 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 5.32 in Storm duration = 24 hrs Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 73 Friday, 00 14, 2013 = 34.15 cfs = 722 min = 89,484 cuft = 69 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 8 Post to BMP1 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 13.200 ac Basin Slope = 0.0% Tc method = User Total precip. = 5.32 in Storm duration = 24 hrs Q (cfs) 70.00 50.00 K� 30.00 20.00 10.00 r wIT.'M Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post to BMP1 Hyd. No. 8 -- 10 Year 0 120 240 360 480 600 720 Hyd No. 8 74 Friday, 00 14, 2013 = 69.90 cfs = 716 min = 142,572 cuft = 80 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 r.T.TA 840 960 1080 1200 1320 1440 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 9 Post to roadway crossing Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 3.300 ac Basin Slope = 0.0% Tc method = User Total precip. = 5.32 in Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 • m . Me 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 75 Friday, 00 14, 2013 20.62 cfs 716 min 43,457 cuff 87 0 ft 5.00 min Type II 484 Q (cfs) 21.00 18.00 15.00 12.00 1111M M1111 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 9 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 10 Post C1 bypass Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 45.600 ac Basin Slope = 1.1 % Tc method = KIRPICH Total precip. = 5.32 in Storm duration = 24 hrs Q (cfs) 180.00 160.00 140.00 120.00 100.00 60.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 76 Friday, 00 14, 2013 160.43 cfs 720 min 417,722 cuff 72 1400 ft 11.71 min Type II 484 Q (cfs) 180.00 160.00 140.00 120.00 100.00 60.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 11 Post C1 to BMP2 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 9.100 ac Basin Slope = 0.0% Tc method = User Total precip. = 5.32 in Storm duration = 24 hrs Q (cfs) 60.00 50.00 K� 30.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 77 Friday, 00 14, 2013 52.04 cfs 716 min 107,307 cuff 83 0 ft 5.00 min Type II 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 11 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 78 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 12 Route BMP1 Hydrograph type = Reservoir Peak discharge = 65.75 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 142,528 cuft Inflow hyd. No. = 8 - Post to BMP1 Max. Elevation = 321.91 ft Reservoir name = Dry Basin B2 Max. Storage = 34,120 cuft Storage Indication method used Q (cfs) 70.00 50.00 K� 30.00 20.00 10.00 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 12 Hyd No. 8 Total storage used = 34,120 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 79 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 13 Post Al bypass and BMP1 Hydrograph type = Combine Peak discharge = 101.25 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 211,441 cuft Inflow hyds. = 6, 12 Contrib. drain. area = 7.000 ac Post Al bypass and BMP1 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 14 Route w/ BMP2 Hydrograph type = Reservoir Peak discharge = 44.61 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 107,109 cuft Inflow hyd. No. = 11 - Post C1 to BMP2 Max. Elevation = 308.14 ft Reservoir name = Dry Pond C Max. Storage = 30,172 cuft Storage Indication method used Q (cfs) 60.00 50.00 K� 30.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 14 Hyd No. 11 Total storage used = 30,172 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 81 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 15 Post C w/ pond Hydrograph type = Combine Peak discharge = 205.04 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 524,831 cuft Inflow hyds. = 10, 14 Contrib. drain. area = 45.600 ac Q (cfs) 210.00 180.00 150.00 120.00 -1 1I 30.00 Q (cfs) 210.00 180.00 150.00 120.00 *1 10 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 Hyd No. 10 Hyd No. 14 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 16 bypass to Sabino way crossing Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 8.800 ac Basin Slope = 0.0% Tc method = User Total precip. = 5.32 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 30.00 20.00 10.00 ri.T.'M Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Friday, 00 14, 2013 = 42.77 cfs = 716 min = 86,634 cuft = 77 = 0 ft = 5.00 min = Type II = 484 0 120 240 360 480 600 720 Hyd No. 16 Q (cfs) 50.00 40.00 30.00 20.00 10.00 r.T.TA 840 960 1080 1200 1320 1440 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 83 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 17 Sabino way crossing Hydrograph type = Combine Peak discharge = 93.28 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 219,575 cuft Inflow hyds. = 7, 9, 16 Contrib. drain. area = 23.000 ac Q (cfs) 100.00 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 100.00 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Hyd No. 7 Hyd No. 9 Hyd No. 16 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 84 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 18 Route through roadway Hydrograph type = Reservoir Peak discharge = 83.87 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 219,575 cuft Inflow hyd. No. = 17 - Sabino way crossing Max. Elevation = 319.90 ft Reservoir name = Sabino way crossing Max. Storage = 7,813 cuft Storage Indication method used Q (cfs) 100.00 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 100.00 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 18 Hyd No. 17 Total storage used = 7,813 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 85 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 19 Post combine Hydrograph type = Combine Peak discharge = 379.76 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 955,928 cuft Inflow hyds. = 13, 15, 18 Contrib. drain. area = 0.000 ac Q (cfs) 420.00 c11 1I 240.00 180.00 120.00 Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 19 Hyd No. 13 Hyd No. 15 Hyd No. 18 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Summary Report :. Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 81.48 2 720 211,369 - - - - -- - - - - -- - - - - -- Pre Al 2 SCS Runoff 125.35 2 720 325,007 - - - - -- - - - - -- - - - - -- Pre 131 3 SCS Runoff 278.59 2 720 722,194 - - - - -- - - - - -- - - - - -- Pre C1 4 Combine 206.84 2 720 536,376 1, 2, - - - - -- - - - - -- Pre Al and 131 5 Combine 485.43 2 720 1,258,569 3,4 - - - - -- - - - - -- Pre Al 131 C1 6 SCS Runoff 44.12 2 716 89,991 - - - - -- - - - - -- - - - - -- Post Al 7 SCS Runoff 46.76 2 720 121,617 - - - - -- - - - - -- - - - - -- Post 131 bypass 8 SCS Runoff 89.21 2 716 183,701 - - - - -- - - - - -- - - - - -- Post to BMP1 9 SCS Runoff 25.47 2 716 54,391 - - - - -- - - - - -- - - - - -- Post to roadway crossing 10 SCS Runoff 215.51 2 720 558,791 - - - - -- - - - - -- - - - - -- Post C1 bypass 11 SCS Runoff 65.44 2 716 136,508 - - - - -- - - - - -- - - - - -- Post C1 to BMP2 12 Reservoir 86.49 2 718 183,656 8 322.08 35,906 Route BMP1 13 Combine 130.58 2 718 273,647 6,12 - - - - -- - - - - -- Post Al bypass and BMP1 14 Reservoir 62.14 2 718 136,310 11 308.36 31,835 Route w/ BMP2 15 Combine 273.30 2 720 695,100 10,14 - - - - -- - - - - -- Post C w/ pond 16 SCS Runoff 55.47 2 716 113,131 - - - - -- - - - - -- - - - - -- bypass to Sabino way crossing 17 Combine 122.02 2 718 289,139 7, 9, 16 - - - - -- - - - - -- Sabino way crossing 18 Reservoir 99.38 2 720 289,138 17 320.76 14,949 Route through roadway 19 Combine 488.05 2 718 1,257,966 13, 15, 18 - - - - -- - - - - -- Post combine Williams pre post trial 4.gpw Return Period: 25 Year Friday, 00 14, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 1 Pre Al Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 15.800 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 6.34 in Storm duration = 24 hrs Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 87 Friday, 00 14, 2013 81.48 cfs 720 min 211,369 cuff 75 1900 ft 10.80 min Type II 484 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 2 Pre B1 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 25.000 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 6.34 in Storm duration = 24 hrs Q (cfs) 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre 1131 Hyd. No. 2 -- 25 Year Friday, 00 14, 2013 = 125.35 cfs = 720 min = 325,007 cuft = 74 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 3 Pre C1 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 57.200 ac Basin Slope = 1.1 % Tc method = KIRPICH Total precip. = 6.34 in Storm duration = 24 hrs Q (cfs) 280.00 240.00 200.00 160.00 120.00 -I 11 40.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre C1 Hyd. No. 3 -- 25 Year Friday, 00 14, 2013 = 278.59 cfs = 720 min = 722,194 cuft = 73 = 1400 ft = 11.71 min = Type II = 484 Q (cfs) 280.00 240.00 200.00 160.00 120.00 :I I1 40.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 4 Pre Al and B1 Hydrograph type = Combine Peak discharge = 206.84 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 536,376 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 40.800 ac Q (cfs) 210.00 180.00 150.00 120.00 -1 1I 30.00 Q (cfs) 210.00 180.00 150.00 120.00 *1 10 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Hyd No. 1 Hyd No. 2 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 91 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 5 Pre Al B1 C1 Hydrograph type = Combine Peak discharge = 485.43 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 1,258,569 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 57.200 ac Q (cfs) 490.00 420.00 350.00 280.00 210.00 140.00 70.00 Q (cfs) 490.00 420.00 350.00 280.00 210.00 140.00 70.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Hyd No. 3 Hyd No. 4 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 6 Post Al Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 7.000 ac Basin Slope = 2.5% Tc method = User Total precip. = 6.34 in Storm duration = 24 hrs Post Al Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Friday, 00 14, 2013 = 44.12 cfs = 716 min = 89,991 cuft = 77 = 1900 ft = 5.00 min = Type II = 484 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 7 Post B1 bypass Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 10.900 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 6.34 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 7 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post 1131 bypass Hyd. No. 7 -- 25 Year 93 Friday, 00 14, 2013 = 46.76 cfs = 720 min = 121,617 cuft = 69 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 r.T.T.11 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 8 Post to BMP1 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 13.200 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.34 in Storm duration = 24 hrs Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 94 Friday, 00 14, 2013 89.21 cfs 716 min 183,701 cuff 80 Oft 5.00 min Type II 484 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 8 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 9 Post to roadway crossing Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 3.300 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.34 in Storm duration = 24 hrs Q (cfs) 28.00 24.00 20.00 16.00 12.00 N. Me 4.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 95 Friday, 00 14, 2013 25.47 cfs 716 min 54,391 cuff 87 0 ft 5.00 min Type II 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 R1 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 9 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 10 Post C1 bypass Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 45.600 ac Basin Slope = 1.1 % Tc method = KIRPICH Total precip. = 6.34 in Storm duration = 24 hrs Q (cfs) 240.00 210.00 180.00 150.00 120.00 •1 II 30.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Friday, 00 14, 2013 215.51 cfs 720 min 558,791 cuff 72 1400 ft 11.71 min Type II 484 Q (cfs) 240.00 210.00 180.00 150.00 120.00 •I I1 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 11 Post C1 to BMP2 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 9.100 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.34 in Storm duration = 24 hrs Q (cfs) 70.00 50.00 K� 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 97 Friday, 00 14, 2013 65.44 cfs 716 min 136,508 cuff 83 0 ft 5.00 min Type II 484 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 11 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 12 Route BMP1 Hydrograph type = Reservoir Peak discharge = 86.49 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 183,656 cuft Inflow hyd. No. = 8 - Post to BMP1 Max. Elevation = 322.08 ft Reservoir name = Dry Basin B2 Max. Storage = 35,906 cuft Storage Indication method used Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 12 Hyd No. 8 Total storage used = 35,906 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 13 Post Al bypass and BMP1 Hydrograph type = Combine Peak discharge = 130.58 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 273,647 cuft Inflow hyds. = 6, 12 Contrib. drain. area = 7.000 ac Post Al bypass and BMP1 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 100 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 14 Route w/ BMP2 Hydrograph type = Reservoir Peak discharge = 62.14 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 136,310 cuft Inflow hyd. No. = 11 - Post C1 to BMP2 Max. Elevation = 308.36 ft Reservoir name = Dry Pond C Max. Storage = 31,835 cuft Storage Indication method used Q (cfs) 70.00 50.00 K� 30.00 20.00 10.00 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) Hyd No. 14 Hyd No. 11 Total storage used = 31,835 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 101 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 15 Post C w/ pond Hydrograph type = Combine Peak discharge = 273.30 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 695,100 cuft Inflow hyds. = 10, 14 Contrib. drain. area = 45.600 ac Q (cfs) 280.00 240.00 200.00 160.00 120.00 -I 11 40.00 Q (cfs) 280.00 240.00 200.00 160.00 120.00 :I I1 40.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 Hyd No. 10 Hyd No. 14 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 16 bypass to Sabino way crossing Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 8.800 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.34 in Storm duration = 24 hrs Q (cfs) 60.00 50.00 K� 30.00 10.00 ri.T.'M Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 102 Friday, 00 14, 2013 = 55.47 cfs = 716 min = 113,131 cuft = 77 = 0 ft = 5.00 min = Type II = 484 0 120 240 360 480 600 720 Hyd No. 16 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 r.T.TA 840 960 1080 1200 1320 1440 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 103 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 17 Sabino way crossing Hydrograph type = Combine Peak discharge = 122.02 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 289,139 cuft Inflow hyds. = 7, 9, 16 Contrib. drain. area = 23.000 ac Q (cfs) 140.00 120.00 100.00 40.00 20.00 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Hyd No. 7 Hyd No. 9 Hyd No. 16 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 104 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 18 Route through roadway Hydrograph type = Reservoir Peak discharge = 99.38 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 289,138 cuft Inflow hyd. No. = 17 - Sabino way crossing Max. Elevation = 320.76 ft Reservoir name = Sabino way crossing Max. Storage = 14,949 cuft Storage Indication method used Q (cfs) 140.00 120.00 100.00 40.00 20.00 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 18 Hyd No. 17 Total storage used = 14,949 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 105 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 19 Post combine Hydrograph type = Combine Peak discharge = 488.05 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,257,966 cuft Inflow hyds. = 13, 15, 18 Contrib. drain. area = 0.000 ac Q (cfs) 490.00 420.00 350.00 280.00 210.00 140.00 70.00 Q (cfs) 490.00 420.00 350.00 280.00 210.00 140.00 70.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 19 Hyd No. 13 Hyd No. 15 Hyd No. 18 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Summary Report 106 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 97.59 2 720 253,780 - - - - -- - - - - -- - - - - -- Pre Al 2 SCS Runoff 150.69 2 720 391,365 - - - - -- - - - - -- - - - - -- Pre 131 3 SCS Runoff 336.16 2 720 872,249 - - - - -- - - - - -- - - - - -- Pre C1 4 Combine 248.28 2 720 645,144 1, 2, - - - - -- - - - - -- Pre Al and 131 5 Combine 584.45 2 720 1,517,394 3,4 - - - - -- - - - - -- Pre Al 131 C1 6 SCS Runoff 52.35 2 716 107,434 - - - - -- - - - - -- - - - - -- Post Al 7 SCS Runoff 57.36 2 720 148,754 - - - - -- - - - - -- - - - - -- Post 131 bypass 8 SCS Runoff 104.83 2 716 217,523 - - - - -- - - - - -- - - - - -- Post to BMP1 9 SCS Runoff 29.35 2 716 63,273 - - - - -- - - - - -- - - - - -- Post to roadway crossing 10 SCS Runoff 261.06 2 720 676,958 - - - - -- - - - - -- - - - - -- Post C1 bypass 11 SCS Runoff 76.21 2 716 160,384 - - - - -- - - - - -- - - - - -- Post C1 to BMP2 12 Reservoir 101.94 2 718 217,478 8 322.20 37,220 Route BMP1 13 Combine 153.96 2 718 324,913 6,12 - - - - -- - - - - -- Post Al bypass and BMP1 14 Reservoir 73.97 2 718 160,186 11 308.48 32,800 Route w/ BMP2 15 Combine 328.09 2 720 837,144 10,14 - - - - -- - - - - -- Post C w/ pond 16 SCS Runoff 65.81 2 716 135,060 - - - - -- - - - - -- - - - - -- bypass to Sabino way crossing 17 Combine 145.60 2 718 347,087 7, 9, 16 - - - - -- - - - - -- Sabino way crossing 18 Reservoir 111.27 2 722 347,086 17 321.42 22,851 Route through roadway 19 Combine 576.49 2 718 1,509,223 13, 15, 18 - - - - -- - - - - -- Post combine Williams pre post trial 4.gpw Return Period: 50 Year Friday, 00 14, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 1 Pre Al Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 15.800 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 7.16 in Storm duration = 24 hrs Q (cfs) 100.00 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre Al Hyd. No. 1 -- 50 Year 107 Friday, 00 14, 2013 = 97.59 cfs = 720 min = 253,780 cuft = 75 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 100.00 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 2 Pre B1 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 25.000 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 7.16 in Storm duration = 24 hrs Q (cfs) 160.00 140.00 120.00 100.00 -1 1I K� 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 108 Friday, 00 14, 2013 150.69 cfs 720 min 391,365 cuff 74 1900 ft 10.80 min Type II 484 Q (cfs) 160.00 140.00 120.00 100.00 *1 10 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 3 Pre C1 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 57.200 ac Basin Slope = 1.1 % Tc method = KIRPICH Total precip. = 7.16 in Storm duration = 24 hrs Q (cfs) 350.00 250.00 200.00 150.00 100.00 50.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre C1 Hyd. No. 3 -- 50 Year 109 Friday, 00 14, 2013 = 336.16 cfs = 720 min = 872,249 cuft = 73 = 1400 ft = 11.71 min = Type II = 484 Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 110 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 4 Pre Al and B1 Hydrograph type = Combine Peak discharge = 248.28 cfs Storm frequency = 50 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 645,144 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 40.800 ac Q (cfs) 280.00 240.00 200.00 160.00 120.00 -I 11 40.00 Q (cfs) 280.00 240.00 200.00 160.00 120.00 :I I1 40.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Hyd No. 1 Hyd No. 2 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 111 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 5 Pre Al B1 C1 Hydrograph type = Combine Peak discharge = 584.45 cfs Storm frequency = 50 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 1,517,394 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 57.200 ac Q (cfs) 640.00 560.00 480.00 400.00 320.00 240.00 160.00 -I 11 Q (cfs) 640.00 560.00 480.00 400.00 320.00 240.00 160.00 :I I1 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Hyd No. 3 Hyd No. 4 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 6 Post Al Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 7.000 ac Basin Slope = 2.5% Tc method = User Total precip. = 7.16 in Storm duration = 24 hrs Q (cfs) 60.00 50.00 K� 30.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 112 Friday, 00 14, 2013 52.35 cfs 716 min 107,434 cuff 77 1900 ft 5.00 min Type II 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 6 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 7 Post B1 bypass Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 10.900 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 7.16 in Storm duration = 24 hrs Q (cfs) 60.00 50.00 K� 30.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post 1131 bypass Hyd. No. 7 -- 50 Year 113 Friday, 00 14, 2013 = 57.36 cfs = 720 min = 148,754 cuft = 69 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 8 Post to BMP1 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 13.200 ac Basin Slope = 0.0% Tc method = User Total precip. = 7.16 in Storm duration = 24 hrs Q (cfs) 120.00 100.00 K� Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 114 Friday, 00 14, 2013 104.83 cfs 716 min 217,523 cuff 80 0 ft 5.00 min Type II 484 Q (cfs) 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 8 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 9 Post to roadway crossing Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 3.300 ac Basin Slope = 0.0% Tc method = User Total precip. = 7.16 in Storm duration = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post to roadway crossing 115 Friday, 00 14, 2013 29.35 cfs 716 min 63,273 cuff 87 0 ft 5.00 min Type II 484 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 10 Post C1 bypass Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 45.600 ac Basin Slope = 1.1 % Tc method = KIRPICH Total precip. = 7.16 in Storm duration = 24 hrs Q (cfs) 280.00 240.00 200.00 160.00 120.00 -I 11 40.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post C1 bypass Hyd. No. 10 -- 50 Year 116 Friday, 00 14, 2013 = 261.06 cfs = 720 min = 676,958 cuft = 72 = 1400 ft = 11.71 min = Type II = 484 Q (cfs) 280.00 240.00 200.00 160.00 120.00 :I I1 40.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 11 Post C1 to BMP2 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 9.100 ac Basin Slope = 0.0% Tc method = User Total precip. = 7.16 in Storm duration = 24 hrs Q (cfs) 80.00 70.00 50.00 K� 30.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 117 Friday, 00 14, 2013 76.21 cfs 716 min 160,384 cuff 83 0 ft 5.00 min Type II 484 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 11 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 118 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 12 Route BMP1 Hydrograph type = Reservoir Peak discharge = 101.94 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 217,478 cuft Inflow hyd. No. = 8 - Post to BMP1 Max. Elevation = 322.20 ft Reservoir name = Dry Basin B2 Max. Storage = 37,220 cuft Storage Indication method used Route BMP1 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 119 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 13 Post Al bypass and BMP1 Hydrograph type = Combine Peak discharge = 153.96 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 324,913 cuft Inflow hyds. = 6, 12 Contrib. drain. area = 7.000 ac Q (cfs) 160.00 140.00 120.00 100.00 -1 1I K� 20.00 Q (cfs) 160.00 140.00 120.00 100.00 *1 10 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 13 Hyd No. 6 Hyd No. 12 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 120 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 14 Route w/ BMP2 Hydrograph type = Reservoir Peak discharge = 73.97 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 160,186 cuft Inflow hyd. No. = 11 - Post C1 to BMP2 Max. Elevation = 308.48 ft Reservoir name = Dry Pond C Max. Storage = 32,800 cuft Storage Indication method used Route w/ BMP2 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 121 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 15 Post C w/ pond Hydrograph type = Combine Peak discharge = 328.09 cfs Storm frequency = 50 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 837,144 cuft Inflow hyds. = 10, 14 Contrib. drain. area = 45.600 ac Q (cfs) 350.00 250.00 200.00 150.00 100.00 50.00 Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 Hyd No. 10 Hyd No. 14 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 16 bypass to Sabino way crossing Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 8.800 ac Basin Slope = 0.0% Tc method = User Total precip. = 7.16 in Storm duration = 24 hrs Q (cfs) 70.00 50.00 K� 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 122 Friday, 00 14, 2013 65.81 cfs 716 min 135,060 cuff 77 0 ft 5.00 min Type II 484 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 16 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 123 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 17 Sabino way crossing Hydrograph type = Combine Peak discharge = 145.60 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 347,087 cuft Inflow hyds. = 7, 9, 16 Contrib. drain. area = 23.000 ac Q (cfs) 160.00 140.00 120.00 100.00 -1 1I K� 20.00 Q (cfs) 160.00 140.00 120.00 100.00 *1 10 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Hyd No. 7 Hyd No. 9 Hyd No. 16 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 124 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 18 Route through roadway Hydrograph type = Reservoir Peak discharge = 111.27 cfs Storm frequency = 50 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 347,086 cuft Inflow hyd. No. = 17 - Sabino way crossing Max. Elevation = 321.42 ft Reservoir name = Sabino way crossing Max. Storage = 22,851 cuft Storage Indication method used Q (cfs) 160.00 140.00 120.00 100.00 -1 1I K� 20.00 Q (cfs) 160.00 140.00 120.00 100.00 *1 10 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 18 Hyd No. 17 Total storage used = 22,851 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 125 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 19 Post combine Hydrograph type = Combine Peak discharge = 576.49 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,509,223 cuft Inflow hyds. = 13, 15, 18 Contrib. drain. area = 0.000 ac Q (cfs) 640.00 560.00 480.00 400.00 320.00 240.00 160.00 -I 11 Q (cfs) 640.00 560.00 480.00 400.00 320.00 240.00 160.00 :I I1 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 19 Hyd No. 13 Hyd No. 15 Hyd No. 18 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Summary Report 126 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 114.27 2 720 298,196 - - - - -- - - - - -- - - - - -- Pre Al 2 SCS Runoff 176.97 2 720 460,974 - - - - -- - - - - -- - - - - -- Pre 131 3 SCS Runoff 395.99 2 720 1,029,926 - - - - -- - - - - -- - - - - -- Pre C1 4 Combine 291.24 2 720 759,169 1, 2, - - - - -- - - - - -- Pre Al and 131 5 Combine 687.23 2 720 1,789,095 3,4 - - - - -- - - - - -- Pre Al 131 C1 6 SCS Runoff 60.82 2 716 125,645 - - - - -- - - - - -- - - - - -- Post Al 7 SCS Runoff 68.46 2 720 177,480 - - - - -- - - - - -- - - - - -- Post 131 bypass 8 SCS Runoff 120.85 2 716 252,682 - - - - -- - - - - -- - - - - -- Post to BMP1 9 SCS Runoff 33.30 2 716 72,432 - - - - -- - - - - -- - - - - -- Post to roadway crossing 10 SCS Runoff 308.49 2 720 801,345 - - - - -- - - - - -- - - - - -- Post C1 bypass 11 SCS Runoff 87.23 2 716 185,111 - - - - -- - - - - -- - - - - -- Post C1 to BMP2 12 Reservoir 117.86 2 718 252,637 8 322.33 38,489 Route BMP1 13 Combine 177.85 2 718 378,282 6,12 - - - - -- - - - - -- Post Al bypass and BMP1 14 Reservoir 85.14 2 718 184,913 11 308.61 33,633 Route w/ BMP2 15 Combine 384.76 2 720 986,258 10,14 - - - - -- - - - - -- Post C w/ pond 16 SCS Runoff 76.45 2 716 157,954 - - - - -- - - - - -- - - - - -- bypass to Sabino way crossing 17 Combine 170.05 2 718 407,866 7, 9, 16 - - - - -- - - - - -- Sabino way crossing 18 Reservoir 122.15 2 722 407,866 17 322.08 32,539 Route through roadway 19 Combine 665.18 2 718 1,772,487 13, 15, 18 - - - - -- - - - - -- Post combine Williams pre post trial 4.gpw Return Period: 100 Year Friday, 00 14, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 1 Pre Al Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 15.800 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 8.00 in Storm duration = 24 hrs Q (cfs) 120.00 100.00 K� Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre Al Hyd. No. 1 -- 100 Year 127 Friday, 00 14, 2013 = 114.27 cfs = 720 min = 298,196 cuft = 75 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 2 Pre B1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 25.000 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 8.00 in Storm duration = 24 hrs Q (cfs) 180.00 150.00 120.00 30.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre 1131 Hyd. No. 2 -- 100 Year 128 Friday, 00 14, 2013 = 176.97 cfs = 720 min = 460,974 cuft = 74 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 180.00 150.00 120.00 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 3 Pre C1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 57.200 ac Basin Slope = 1.1 % Tc method = KIRPICH Total precip. = 8.00 in Storm duration = 24 hrs Q (cfs) 420.00 c11 1I 240.00 180.00 120.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre C1 Hyd. No. 3 -- 100 Year 129 Friday, 00 14, 2013 = 395.99 cfs = 720 min = 1,029,926 cuft = 73 = 1400 ft = 11.71 min = Type II = 484 Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 130 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 4 Pre Al and B1 Hydrograph type = Combine Peak discharge = 291.24 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 759,169 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 40.800 ac Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Hyd No. 1 Hyd No. 2 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 131 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 5 Pre Al B1 C1 Hydrograph type = Combine Peak discharge = 687.23 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 1,789,095 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 57.200 ac Q (cfs) 700.00 500.00 400.00 200.00 100.00 Q (cfs) 700.00 500.00 400.00 300.00 200.00 100.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Hyd No. 3 Hyd No. 4 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 6 Post Al Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 7.000 ac Basin Slope = 2.5% Tc method = User Total precip. = 8.00 in Storm duration = 24 hrs Q (cfs) 70.00 50.00 K� 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 132 Friday, 00 14, 2013 60.82 cfs 716 min 125,645 cuff 77 1900 ft 5.00 min Type II 484 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 6 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 7 Post B1 bypass Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 10.900 ac Basin Slope = 2.5% Tc method = KIRPICH Total precip. = 8.00 in Storm duration = 24 hrs Q (cfs) 70.00 50.00 K� 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post 1131 bypass Hyd. No. 7 -- 100 Year 133 Friday, 00 14, 2013 = 68.46 cfs = 720 min = 177,480 cuft = 69 = 1900 ft = 10.80 min = Type II = 484 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 8 Post to BMP1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 13.200 ac Basin Slope = 0.0% Tc method = User Total precip. = 8.00 in Storm duration = 24 hrs Q (cfs) 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 134 Friday, 00 14, 2013 120.85 cfs 716 min 252,682 cuff 80 0 ft 5.00 min Type II 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 8 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 9 Post to roadway crossing Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 3.300 ac Basin Slope = 0.0% Tc method = User Total precip. = 8.00 in Storm duration = 24 hrs Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 135 Friday, 00 14, 2013 33.30 cfs 716 min 72,432 cuff 87 0 ft 5.00 min Type II 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 9 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 10 Post C1 bypass Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 45.600 ac Basin Slope = 1.1 % Tc method = KIRPICH Total precip. = 8.00 in Storm duration = 24 hrs Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 136 Friday, 00 14, 2013 308.49 cfs 720 min 801,345 cuff 72 1400 ft 11.71 min Type II 484 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 11 Post C1 to BMP2 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 9.100 ac Basin Slope = 0.0% Tc method = User Total precip. = 8.00 in Storm duration = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post C1 to BMP2 137 Friday, 00 14, 2013 87.23 cfs 716 min 185,111 cuff 83 0 ft 5.00 min Type II 484 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 138 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 12 Route BMP1 Hydrograph type = Reservoir Peak discharge = 117.86 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 252,637 cuft Inflow hyd. No. = 8 - Post to BMP1 Max. Elevation = 322.33 ft Reservoir name = Dry Basin B2 Max. Storage = 38,489 cuft Storage Indication method used Q (cfs) 140.00 120.00 100.00 40.00 20.00 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) Hyd No. 12 Hyd No. 8 Total storage used = 38,489 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 139 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 13 Post Al bypass and BMP1 Hydrograph type = Combine Peak discharge = 177.85 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 378,282 cuft Inflow hyds. = 6, 12 Contrib. drain. area = 7.000 ac Post Al bypass and BMP1 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 140 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 14 Route w/ BMP2 Hydrograph type = Reservoir Peak discharge = 85.14 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 184,913 cuft Inflow hyd. No. = 11 - Post C1 to BMP2 Max. Elevation = 308.61 ft Reservoir name = Dry Pond C Max. Storage = 33,633 cuft Storage Indication method used Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) Hyd No. 14 Hyd No. 11 Total storage used = 33,633 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 141 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 15 Post C w/ pond Hydrograph type = Combine Peak discharge = 384.76 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 986,258 cuft Inflow hyds. = 10, 14 Contrib. drain. area = 45.600 ac Q (cfs) 420.00 c11 1I 240.00 180.00 120.00 Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 Hyd No. 10 Hyd No. 14 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Hyd. No. 16 bypass to Sabino way crossing Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 8.800 ac Basin Slope = 0.0% Tc method = User Total precip. = 8.00 in Storm duration = 24 hrs Q (cfs) 80.00 70.00 50.00 K� 30.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 142 Friday, 00 14, 2013 76.45 cfs 716 min 157,954 cuff 77 0 ft 5.00 min Type II 484 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 16 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 143 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 17 Sabino way crossing Hydrograph type = Combine Peak discharge = 170.05 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 407,866 cuft Inflow hyds. = 7, 9, 16 Contrib. drain. area = 23.000 ac Q (cfs) 180.00 160.00 140.00 120.00 100.00 60.00 40.00 20.00 Q (cfs) 180.00 160.00 140.00 120.00 100.00 60.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Hyd No. 7 Hyd No. 9 Hyd No. 16 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 144 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 18 Route through roadway Hydrograph type = Reservoir Peak discharge = 122.15 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 407,866 cuft Inflow hyd. No. = 17 - Sabino way crossing Max. Elevation = 322.08 ft Reservoir name = Sabino way crossing Max. Storage = 32,539 cuft Storage Indication method used Q (cfs) 180.00 160.00 140.00 120.00 100.00 60.00 40.00 20.00 Q (cfs) 180.00 160.00 140.00 120.00 100.00 60.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 18 Hyd No. 17 Total storage used = 32,539 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com 145 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Friday, 00 14, 2013 Hyd. No. 19 Post combine Hydrograph type = Combine Peak discharge = 665.18 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,772,487 cuft Inflow hyds. = 13, 15, 18 Contrib. drain. area = 0.000 ac Q (cfs) 700.00 500.00 400.00 200.00 100.00 Q (cfs) 700.00 500.00 400.00 300.00 200.00 100.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 19 Hyd No. 13 Hyd No. 15 Hyd No. 18 Time (min) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com Storm Sewer Tables 10 m 00 Ct m e w O H O N d' n Ol N N W 00 Ol cf W In 01 N M r` H H 00 H N m O1 O f` V o0 H Ct O N N d• lD Ln H O M cl' H O1 Ln H H Ln 00 E M m N O 00 w Ln r-7 lD r` O Lr1 r` n to Ln 0) r` N H O1 O1 N O O W N r` N N N M N N N M N N N N 0 0 0 0 Ct d' C d' M m ci• V C d• H m m M m m M m m M m m m m M m m M m m M m M m m m m M m N J CL Ol W W 0 0 0 0 0 0 O O r\ O lD O N m Ln n m O Ln O H H w r` O > O 0) N r` m r` M V H H Ln 1 O O O1 O O Ol O O m O1 O 00 o6 N M l0 N M Ol V r\ r m m N 0 N N L N M 01 00 W O W +' N N N M M M M M M N M N H O O D m Ln zt T It � V �t ct Ln ' N N G L]. C M M m M M M M M M m m m M M M M M M M M M M M M M M m M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O Y O o 0 0 0 0 0 0 0 0 0 0 O O O O 0 0 0 0 0 0 0 0 0 0 O O 0) Ln V O -t ct T :t 00 00 to o0 00 00 -Zt V V 00 V d- V O O 00 Ln Ln 00 ct 0 E H N M N N N N H H H H H H N N N H N N N M M H H i-1 e-1 N LD 20 C D :O M Ln lD N H O O H i` M O Ln l0 r` O m Kt m M o m Ln H O Ol t n Ln N N l0 Ln Ln O r` 'd' r` 111 O H Lr1 n O Ln Ln O V' d' H M Ln O O W 00 O1 L r` -• Ol Ln lD H o0 Ln Ln 00 H V O H N H n M ci H r` Ln N H W (n Ol H N to V H 00 Ol ct t o Ol Ln N V N Ct LO Gt H N d• Ln H Ln m Ln ct m m H 00 O �-.. H H N H H H d J � r` Ln 00 H 00 Ln H M M N N Ln V m w M to Ln V M N O 01 O Ln [t Ln O1 r\ r\ 00 O lD W O0 O N O Ol Ln O H N Ol lD Ln Ln Ln 't O O dl H 0) O O O H H H H ct H H N O o H Ln ct m m H 0 0 m H H 0 N N 11 V) 0\° v M 0 0 Ln O r` O m O O Ln O O m O1 O M �t r` n 00 o r` N N m O O E O N O al N Ln N M n W O r` Ol O In O O Ln lD m H O r\ Ln V rl w M Ln Ln N Ln m -zt V 00 H Ol r` r\ r` 0 O Ol 00 lD H H m v N N N N N N N N N N N N O O O O V 4 m cn m M M cn w H N•' m M M M m M M M M M m m m m m M M m M M m M M M M m M m O t O CL > O d C O 00 O w Ln O r` O m al Ln O a' lD M m O M Ct r` n w o M N d' M O a-' m N r` L!'I Ol O Ln O M O Ln O M M O Ln N w Ln w V H O r` H LO O N M N O Ql r` Ln CT c-1 l0 l0 Ln l0 Ln Ln 4 al Ln H Ol n n N 01 m r\ H Ln 0)> N N N N N N N M N N N N O O O O d' d' T ro M M d• M m e '' H v m m M M M M M M m M m m M M M M M M M M M M M M m m m M N v Q Q n o m H r, m H r` m rn Tt a In m r` 01 �t H v T LD O M � m rn m Ln o r\ O O m H 4 H LO Ln 00 O W O ct N O1 n o Ol N w V w d• dt zt V H H M M W N �' ct Ln O1 O1 Ln r` LO H M 00 LD w Ln d' r\ LD n M H Ln H m r\ V H H 3 0 — o m > a m LD r` oo Ln O1 N Ln O o ct m to H v 01 O1 H N r` N 0 o o v l0 m rn 3 00 Ln n N n O1 N t0 O1 V O M Ln V Ln M N O1 O0 H O H lD Ln V r` O1 H M m lD r` O1 H O Ol O1 N d' m H O0 w w H LD H o d• LL N H H H N H H N N N H O1 z 0 U Ln m H O n l0 M m 0 O w N LD <D LO m V O r` r` Ln O O c i Ol m O1 d' 00 O1 r` 00 r` O Ln O Ln N Ln r` M LD W N O W W to O Ln oo Ln Ln 00 H O M H H w N O M Q1 O lO H H H O1 00 O 0) o O p 0 0 0 H cl• Ln o ct O N H H H Ql D u N n M N H O r` N 00 N O 00 N 00 N O N H Q1 Ln O n N N Ct N N Ol N H 00 N H O cn N H N N H N C:) O O N O Ol Ol O1 00 N N H N N H _ r\ r\ to n r` r` to r` r` r` n r` r` r` r` r` r` n lD 0 LD lD n r` r` r` r` 00 D 0 s c0 C lY O v O H 0 0 00 H lD 0 r` 0 00 00 CD H O O O m to H Ln 0 0 0 r, O O O O N CO O Ct O H O H 0 0 11 O ID. Cl O m o N 4' lP p o M C D- u -� Ln Ln lD Ln Ln lD l0 Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln lD LD LO LD Ln Ln Ln Ln Ln Ln E H c c U 0 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 0 O O [ 0 0 0 0 0 0 0 0 0 O O O O O O O O O o 0 0 p 0 0 0 0 O O Ln Ln Lri Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln L11 In Ln Lo m 1n Ln Ln Ln u H N N d' M M N N �' O Ln O N N 00 00 o o O o 0 o o Ln o O M O O y_ 40- LD Ct Ct Ln Ln � � �' Ln Ct Ln � Ln Ln Ln lD LD LD Ln lz� Ln Ln LO Ln Ln ,�; 0 0 0 0 0 0 0 0 0 O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O C N 7 O u r` n N Ln O Ln Ln 0 0 o Ln Ln f` n r` f` o m m m m m p o Ln m o 0 N r` lD O r` Ln r` r` O o O M 00 .4 H lD l0 N V lD W r` r\ O m n N O O N H N N c'n M M N N N O m Ln 00 cn V T to w o0 N o H H M M 0 F°- a a v n o 0 Ln Ln m 0 0 0 O Ln o r, o 0 0 p 0 0 o Ln o o o Ln M o 0 0O n Ol LD t\ n N O O O p cn Ln � r` Ln O N O N N H O O 111 N N O O t0 O M p H O O H M 0 N O O O N N m M O o 0 0 0 N o H H M m N M v V � a a Y 3 Ol r` m H N H H H r` n r` Ln ct 4 O Ol oo r\ N p O) w Ln V d `1 W p Ln p Ln N H O c0 O v) y* W M N N Ln N H H H H In H H H N N N Z } >. LL >- >- >- >- >- >- } } LL } } } LL m } } } } Ly } } } m = LL LU C C T v N c o H M m N H W r� 1p Ln CI' H O O1 .0 N p O1 00 Ln - m �$ r� lD H N O W O1 H H H H 44-. :m M m N N (\J H H H H M H H N Ln Z w >- } } y y } } } } } } } y w m } } } w } y } w Lwi M M M O O O O o 0 0 0 I, Ot.() O N m Ln I- M o Ln O ri ri o0 I- O m ri I� O O O to 0 0 0) O M O r-I N k.0 rn d* I, M O Ln Ln N 01 00 i- W I� Ln I� an d c-I ri Ln o Q1 O 01 O 01 00 00 M N 01 I� M N N N N M 00 O 4' N E N N N c'n M rn m m M N m N r-I O O O Ln Ln c* �* -zt dt It ch Ln Cr N sZ M M m m m m m M M M m M M M m M M M M M M M M m M M M M cu O O O O O O o O O O O O O O O O O O O O O O O O O O o O O o 0 o O O O O O O O O O O O O O O O O O O o O O O O O E Ln d O ch c1 -4 4 00 00 Ln o0 00 00 4 4 4 o0 4 4 4 O O o0 Ln Ln oo .4 O r-I N m N N N N r-I r-I r-I r-I r-I r-I N N N r-I N N N m m ri ri ri ri N lD L Lm � M Ln N O N ri Ln O 0 � ri r- M O Ln O n O Gl d m M m m ri O m I� Ln N � Ln O Ct I, Ln o `� Ln I, o Ln Ln o 't r-I m Ln O O o0 00 Cl bA r, IT Ln ID ri MO Ln Ln a0 ri N lD ri N ri I� M ri I� Ln N i-I o0 m 0l ri Q4-1 v d' 00 a) N 01 Ln N -t �' l0 It ri N Ln Ln M Ln � M ri 00 0 J I*l Ln 00 ri o0 Ln c-i m m N N Ln m lD m Ln Ln T* m N O m O m Ln rn I\ n o0 O LD o0 00 o N o 01 Ln o ri N 01 O Ln Ln Ln d O O C1 ri Q O O O ci ri r-I r-I ri ri H O O H m m m ri O O M ri ri O N N O Ln E m L M O O Ln O I� O m O O Ln O O M m O mZl- Il r, 00 O I- N N M O O o N 0 01 N Ln N M n DD O n Cl O Ln O O Ln lD Ol ri O r i M !* M m O > M r4 O I� m � H lO m Ln Ln N Ln Ln d' R* 00 .-I m ri I\ � O m 00 lD r I M O_ N N N N N N N N N N N N 0 0 0 0 M M rn M Tt M rn �t C1' ri 3 O M m M M M m m m M M M M m M M m M M M M M M m m M M M m O ,L- � a i O o0 O o0 m O n o m M Ln o 1* l0 M m o m N d M O N M N I- Ln m o m O M O Ln o M M O Ln N o0 Ln lD It ri o I� ri l0 I, O m > ai = M N O Ol I-� Ln 4 e4 l0 LD Ln d' l0 Ln Ln 4 Ol Ln ri Q1 f-� i-4 N 01 Ql I� ri Ln N N N N N N N rO N N N N O O O O m M rn � m M H N M M m m M m m m M M m M M M M M M M m m M M M M M M m m E M N ri Q Ln d' � O o1 00 N O O1 00 Ln Q 00 CD Ln O U-) r1 4- _ _ Ln r-I c-I H _ � _ *k Ln M N N N N ri ri H N ri ri H N L/Y Ln } }' LL } } } } �„ } } } } } } u-) m } } } } } } m = LU LL L.L LwL O O a Z O 0) r- m N ri 00 Q LD Ln d' ri O 07 DD N O m 00 Ln Q N I\ lD ri � N M ri r-i c-I u U U M M N N r`f N r I c-I H U ri ri N N fn } } } } } } }' } } } } } } } } LLI } } } } } } LL N LL } L^ Q O � Z C- Factor Calculation 14:17:38 2013 Project: Williams tract 02/04/13 Location: Area 1 Developed C- factor (CF) Cover description Streets Drives and Walks Streets, Concrete Lawns, Heavy Soil, Average, 2 -70 CF (weighted): 0.624 Total Area: 0.722 Acre C- Factor Calculation Area(Acre) 14:18:34 2013 0.257 Project: Williams tract 0.158 02/04/13 0.307 Location: Area 2 2.780 Developed C- factor (CF) Cover description Streets Drives and Walks Roofs Flat Streets, Concrete Lawns, Heavy Soil, Average, 2 -7% CF (weighted): 0.421 Total Area: 3.913 Acre C- Factor Calculation 14:23:25 2013 Project: Williams tract 02/04/13 Location: Area 3 Developed C- factor (CF) Cover description Streets Drives and Walks Roofs Flat Streets, Concrete Lawns, Heavy Soil, Average, 2 -7% CF (weighted): 0.438 Total Area: 4.650 Acre Mon Feb 04 By: DS Date: Checked: Date: CF Area(Acre) 0.950 0.257 0.880 0.158 0.220 0.307 Mon Feb 04 By: DS Date: Checked: Date: CF Area(Acre) 0.950 0.301 0.900 0.802 0.880 0.030 0.220 2.780 Mon Feb 04 By: DS Date: Checked: Date: CF Area(Acre) 0.950 0.309 0.900 1.030 0.880 0.133 0.220 3.178 C- Factor Calculation Area(Acre) 14:24:50 2013 0.274 Project: Williams tract 0.855 02/04/13 1.381 Location: Area 4 1.063 Developed C- factor (CF) Cover description Streets Drives and Walks Roofs Flat Lawns, Heavy Soil, Average, 2 -7% CF (weighted): 0.531 Total Area: 2.510 Acre C- Factor Calculation 14:26:30 2013 Project: Williams tract 02/04/13 Location: Area 5 Developed C- factor (CF) Cover description Streets Drives and Walks Roofs Flat Streets, Concrete Lawns, Heavy Soil, Average, 2 -7% CF (weighted): 0.418 Total Area: 1.480 Acre C- Factor Calculation 14:27:24 2013 Project: Williams tract 02/04/13 Location: Area 6 Developed C- factor (CF) Cover description Streets Drives and Walks Lawns, Heavy Soil, Average, 2 -7% CF (weighted): 0.520 Total Area: 0.467 Acre C- Factor Calculation 14:28:19 2013 Mon Feb 04 By: DS Date: Checked: Date: CF Area(Acre) 0.950 0.274 0.900 0.855 0.220 1.381 Mon Feb 04 By: DS Date: Checked: Date: CF Area(Acre) 0.950 0.209 0.900 0.193 0.880 0.015 0.220 1.063 Mon Feb 04 By: DS Date: Checked: Date: CF Area(Acre) 0.950 0.192 0.220 0.275 Mon Feb 04 Project: Williams tract 02/04/13 0.310 Location: Area 7 0.676 Developed 0.028 C- factor (CF) 1.734 Cover description Streets Drives and Walks Roofs Flat Streets, Concrete Lawns, Heavy Soil, Average, 2 -7o CF (weighted): 0.476 Total Area: 2.748 Acre C- Factor Calculation 14:35:14 2013 Project: Williams tract 02/04/13 Location: 8 Developed C- factor (CF) Cover description Streets Drives and Walks Roofs Flat Streets, Concrete Lawns, Heavy Soil, Average, 2 -7% CF (weighted): 0.491 Total Area: 2.749 Acre C- Factor Calculation 14:29:41 2013 Project: Williams tract 02/04/13 Location: Area 9 Developed C- factor (CF) Cover description Streets Drives and Walks Roofs Flat Streets, Concrete Lawns, Heavy Soil, Average, 2 -7% CF (weighted): 0.497 Total Area: 3.049 Acre By: DS Date: Checked: Date: CF Area(Acre) 0.950 0.310 0.900 0.676 0.880 0.028 0.220 1.734 Mon Feb 04 By: DS Date: Checked: Date: CF Area(Acre) 0.950 0.376 0.900 0.663 0.880 0.028 0.220 1.682 Mon Feb 04 By: DS Date: Checked: Date: CF Area(Acre) 0.950 0.323 0.900 0.866 0.880 0.031 0.220 1.829 C- Factor Calculation Mon Feb 04 14:30:53 2013 Project: Williams tract By: DS 02/04/13 Location: Area 10 Checked: Developed C- factor (CF) Cover description CF Area(Acre) Streets Drives and Walks 0.950 0.087 Roofs Flat 0.900 0.297 Lawns, Heavy Soil, Average, 2 -70 0.220 0.498 CF (weighted): 0.521 Total Area: 0.882 Acre C- Factor Calculation Mon Feb 04 14:33:08 2013 Project: Williams tract By: DS 02/04/13 Location: Area 12 Checked: Developed C- factor (CF) Cover description CF Area(Acre) Streets Drives and Walks 0.950 0.252 Roofs Flat 0.900 0.675 Lawns, Heavy Soil, Average, 2 -70 0.220 2.407 CF (weighted): 0.413 Total Area: 3.334 Acre Date: Date: Date: Date: Temporary Silt Traps W z W C O co l%J O E N co _ r �o U d D X N C (0 CY] U) E tv U m U Z W 0 0 0 0 0 cna* 00000 Q O O O O o IL Z O N N N N 0 N N N N d' W v't w � w -' LO Lo Lo N z ~ N r N N y Z Y O O Lf) Lf) 00 N U N [- �- x J W LL 0 0 0 0 Z LL Z — .- W f,- J Z � M M Lo M d' 04 x x x x x x W x NJ OOLO 0LO U x CO tl- LO LO Ln x x x x x x .. o 0 0 N rn� °0rn U) LO d 00 N O O W ti O 00 CO c- O) CO 0) C0 Z O Lo Iz- M d LL �wU) 0 0 0 0 0 0 0) 00 O CO N - D_ LL M O 00 ti w W w 000000 .-. O O ti o 0 fl- N O co co v7 LL N I- N co co J W U 0 v t- LLI M O ti � N N O O 1-0 O O O Z Ln O CO LO O O O W W LL LL' � O LL Q W Q O W OOOLOIr�o M Ls � cu w iii o Z WU c)00NmLo0 Q Q 0 Z N CO LO *k *kk*k Z N 0 �U Q W Z W W = LUJ L U)W Z ° W W U) a a O F- W V O J x IL Z O N N N N 0 N N N N d' W v't O x (� O O Lf) Lf) 00 N Z LL N [- �- W J x� .4 f-- LL f,- LLI Z � 04 m m m m U U W ON 0) 0) 0) 0) 0 N NO U) W Z O CO N N N N M N (� (n 0 0 0 0 0 0 0) 00 O CO N - D_ LL M O 00 ti w W Q �z W oa000v O M M N N a �- a t- LLI M O ti � N N Z W W LL LL' � O LL Williams Tract TST #1 Selection of Sediment Control Measure Total Drainage Area Okay Temporary Sediment Trap Okay Rock Dam, Okay Skimmer Sediment Basin Okay Temporary Sediment Basin Disturbed Area (Acres) Peak Flow from 10 -year Storm (cfs) TGH and BRB/11/25/2008 n User entry Calculated Value Sediment Control Measures with Skimmer Dewatering 11252008 trap 1.xls Gilleece Associates By DS 2/5/13 Williams Tract TST #1 Temporary Sediment Basin Okay Disturbed Area (Acres) Peak Flow from 10 -year Storm (cfs) 2700 Required Volume ft3 5175 Required Surface Area ft2 50.9 Suggested Width ft 101.7 Suggested Length ft Trial Top Width at Spillway Invert ft Trial Top Length at Spillway Invert ft 'Trial Side Slope Ratio Z:1 ,Trial Depth ft (2 to 13 feet above grade) 72 Bottom Width ft 42 Bottom Length ft 3024 Bottom Area ft2 12474 Actual Volume ft3 Okay 5400 Actual Surface Area ft2 Okay Use Spillway Capacity Sheet to Size Primary and Emergency Spillways Skimmer Size (inches) 0.25 Head on Skimmer (feet) k� �t ytOrifice Size (1/4 inch increments) 3.53 Dewatering Time (days) Suggest about 3 days Gillleece Associates By DS 2/5/13 Z: \Jobs \3690 \90_Williams Tract \Documents \Reports \Sediment calcs \Sediment Control Measures with Skimmer Dewatering 11252008 trap 1.xls Williams Tract TST #2 Selection of Sediment Control Measure Total Drainage Area Do Not Use Temporary Sediment Trap Okay Rock Dam, Okay Skimmer Sediment Basin Okay Temporary Sediment Basin Disturbed Area (Acres) Peak Flow from 10 -year Storm (cfs) TGH and BRB/11/25/2008 User entry Calculated Value Gilleece Associates By DS 2/5/13 Z: \Jobs \3690 \90_Williams Tract \Documents \Reports \Sediment calcs \Sediment Control Measures with Skimmer Dewatering 11252008 basin 2 .xls Williams Tract TST #2 Temporary Sediment Basin Okay Disturbed Area (Acres) Peak Flow from 10 -year Storm (cfs) 7200 Required Volume ft3 7904 Required Surface Area ft2 62.9 Suggested Width ft 125.7 Suggested Length ft p V Trial Top Width at Spillway Invert ft �11 Trial Top Length at Spillway Invert ft 3.1 Trial Side Slope Ratio Z:1 Trial Depth ft (2 to 13 feet above grade) 87 Bottom Width ft 37 Bottom Length ft 3219 Bottom Area ft2 30954 Actual Volume ft3 Okay 8400 Actual Surface Area ft2 Okay Use Spillway Capacity Sheet to Size Primary and Emergency Spillways " Skimmer Size (inches) 0.333 Head on Skimmer (feet) Orifice Size (1/4 inch increments) 3.72 Dewatering Time (days) Suggest about 3 days Gilleece Associates By DS 2/5/13 Z: \Jobs \3690 \90_Williams Tract \Documents \Reports \Sediment calcs \Sediment Control Measures with Skimmer Dewatering 11252008 basin 2 .xls Williams Tract TST #3 Selection of Sediment Control Measure u 4 2 Total Drainage Area Okay Temporary Sediment Trap Okay Rock Dam, Okay Skimmer Sediment Basin Okay Temporary Sediment Basin M15 'I ASM Disturbed Area (Acres) F Peak Flow from 10 -year Storm (cfs) TGH and BRB/11/25/2008 llp User entry Calculated Value Gilleece Associates By DS 2/5/13 Z: \Jobs \3690 \90_Williams Tract \Documents \Reports \Sediment calcs \Sediment Control Measures with Skimmer Dewatering 11252008 trap 3.xls Williams Tract TST #3 Temporary Sediment Basin Okay Disturbed Area (Acres) Peak Flow from 10 -year Storm (cfs) 2970 Required Volume ft3 3688 Required Surface Area ft2 42.9 Suggested Width ft 85.9 Suggested Length ft ��Trial Top Width at Spillway Invert ft "Trial Top Length at Spillway Invert ft Trial Side Slope Ratio Z:1 yTrial Depth ft (2 to 13 feet above grade) 52 Bottom Width ft 37 Bottom Length ft 1924 Bottom Area ft2 8499 Actual Volume ft3 Okay 3850 Actual Surface Area ft2 Okay Use Spillway Capacity Sheet to Size Primary and Emergency Spillways Mg U I W Skimmer Size (inches) 0.25 Head on Skimmer (feet) Orifice Size (1/4 inch increments) 3.27 Dewatering Time (days) Suggest about 3 days Gilleece Associates By DS 2/5/13 Z: \Jobs \3690 \90_Williams Tract \Documents \Reports \Sediment calcs \Sediment Control Measures with Skimmer Dewatering 11252008 trap 3.xls Williams Tract TST #4 Selection of Sediment Control Measure Total Drainage Area Do Not Use Temporary Sediment Trap Okay Rock Dam, Okay Skimmer Sediment Basin Okay Temporary Sediment Basin �'M Disturbed Area (Acres) Peak Flow from 10 -year Storm (cfs) TGH and BRB/11/25/2008 r° User entry Calculated Value Gilleece Associates By: DS 2/5/13 Z: \Jobs \3690 \90_Williams Tract \Documents \Reports \Sediment calcs \Sediment Control Measures with Skimmer Dewatering 11252008 basin 4 .xls Williams Tract TST #4 Temporary Sediment Basin Okay Disturbed Area (Acres) Peak Flow from 10 -year Storm (cfs) 6300 Required Volume ft3 4962 Required Surface Area ft2 49.8 Suggested Width ft 99.6 Suggested Length ft 47rial Top Width at Spillway Invert ft YTrial Top Length at Spillway Invert ft Trial Side Slope Ratio Z:1 Trial Depth ft (2 to 13 feet above grade) 76 Bottom Width ft 26 Bottom Length ft 1976 Bottom Area ft2 13568 Actual Volume ft3 Okay 5000 Actual Surface Area ft2 Okay Use Spillway Capacity Sheet to Size Primary and Emergency Spillways 'Skimmer Size (inches) 0.25 Head on Skimmer (feet) Orifice Size (1/4 inch increments) 2.94 Dewatering Time (days) Suggest about 3 days Gilleece Associates By DS 2/5/13 Z: \Jobs \3690 \90_Williams Tract \Documents \Reports \Sediment calcs \Sediment Control Measures with Skimmer Dewatering 11252008 basin 4 .xIs Williams Tract TST #5 Temporary Sediment Basin Okay Disturbed Area (Acres) Peak Flow from 10 -year Storm (cfs) 3600 Required Volume ft3 4610 Required Surface Area ft2 48.0 Suggested Width ft 96.0 Suggested Length ft Ov= ;Trial Top Width at Spillway Invert ft Trial Top Length at Spillway Invert ft y Trial Side Slope Ratio Z:1 ' Trial Depth ft (2 to 13 feet above grade) 72 Bottom Width ft 37 Bottom Length ft 2664 Bottom Area ft2 11259 Actual Volume ft3 Okay 4950 Actual Surface Area ft2 Okay Use Spillway Capacity Sheet to Size Primary and Emergency Spillways 2Skimmer Size (inches) 0.167 Head on Skimmer (feet) -,"-,,,,,,,?,Orifice Size (1/4 inch increments) 2.98 Dewatering Time (days) Suggest about 3 days Gilleece Associates By: DS 2/5/13 Z: \Jobs \3690 \90_Williams Tract \Documents \Reports \Sediment calcs \Sediment Control Measures with Skimmer Dewatering 11252008 basin 5 .xis Williams Tract TST #5 Selection of Sediment Control Measure } a 25 Total Drainage Area Do Not Use Temporary Sediment Trap Okay Rock Dam, Okay Skimmer Sediment Basin Okay Temporary Sediment Basin Disturbed Area (Acres) Peak Flow from 10 -year Storm (cfs) TGH and BRB/11/25/2008 User entry Calculated Value Gilleece Associates By: DS 2/5/13 U X _U (0 U 0) y N O) O C 12 �CCCa)2T2t� LO LO LO LO 222t� LO 222tvT2222222 LO .X N N O C C O ?s W N .,O_, X O 1(< O N a) 0 3 0 N 0 0 7 0 0 0 7 -55 7 �C W 2 m 0 m � � 2 � 0 2 � � W � � � m � � � � � � 2 2 N 0) Naaa'nwmu)a-w L L L N to w w L to 0) 4 N �acnunm L O N Cl) L N cnwto(ncn(n(nw N N N N N N N o 0 o m t `a m m o m c 2 c o o m m m o L o m m m m L `a c� m d MMM�'C�C�C�MC�C�C7MC'iC7U' mC�UUC7C7C�C�C� U U U U U U a� C O Ln r~ 0 t() N N N N v N N N LO 0 LO M LO t N m m LO M O N O C tL C C C C C C Ct� Ct� t, C C C~ C C C C (0 O O O O O Ln O O O O O O O O O O O Q Z r-� I- Z Z Z Z N Z Z Z� Z -� ti Z Z Z� Z Z Z Z co U 0 V co U cn c U a� H o_ C� Q 0 O 0 N 0 00 0 V 0M M 0 o CO 0 M o r Ln M 0 O 0 O 0 O 0 LO 0 CO 0 O 0 N� ou 0 O 0 N 0 N 0 n 0 N 0 O 0 CO U v O M In M Ln V N V' M CO M M LO c}" c1' LO M V M V M N •- M O > O_ LO CO (O N V' O M O I` V N (O (O CO M co N O 00 N O LO LO LO O y V V LO 0) LO O Ln LO r- r- � co CO co V' O 00 to LO O O O LO CJ UM�LO rt`�M�rnLO . -��OD� V L!)Mr�(OOOOLL') N '„ W 0 M LO I- N M 00 r- O cJ' M N O O O (O o 0 0 Q� U t` 'q CO N CO N �P N (O LO Cl) V V O (O d' M �' LO N r I- t` r Iq = N O V r- (O �- N r t` r �- I• 0 M M d' N �- r In 0 0 0 rP U W J 3 O ui LL UJ N 00 O 00 L- 00 N 00 N Cl) LO (O V N 00 O N N (O O M rt tt O QL o LO V' 00 Lo CO V LO t 00 t` V d' CN <- N N 00 U' Z 0 � O O V' O V' O V o V N OLON00NMC) 0 0 0 0 0 0 0 0 NO00000 0 0 0 0 0 00 W 0 0OOOI- 0 0 0 0 N N L O_ NN O O V O V O O O VN'ctNN�h O O O O O O V'NN O O O V' O V 90 NMNNONrr O o 0 x 0 0 0 U O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U) O (6 3 U_ O U Nr- --r - i - r - - c - LrN- - - r - -- - r - rrrrN Q N N CL 0 U) m N N N N co N N N N N N N N N N N N N N N N g V V' co N a v O Q N N r r N r r r r r r N N r r r r r r r N O cn N N f6 L r N co V LO Co (O f� 0 O 00 d) O r N Cl) '7 LO N N N N N N cn Z U X _U (0 U 0) y N O) O C 12 d h N f0 N N N 0 0 0 N T O H L H in in w a m` a m o «M N Q o T� CJ o «'o no 0000 UO C) O N O o 0 0 0 > $ > o > 3 # 1° ig y "a V US p C Ur Y C m'.O Vl � d o a v m c v N ¢ O a Q Mo aci 9 o I o 0 0 o m E m a v v c > v ml m a v E v � cwN. 3,°p 3 °m 3m m� avrn o c c .J J O o O C Q o E E v` t- a U v v oio o co, c co.. c co V V U v m o: m � N N d 00 0 0 a C) JO M. C7 N v N � r N N LL v U Q m m a Fo- N 41 .d0 w� v c z u u iN U U U3 u (n H T n a aha - N ry E E O E: .U.. � O O � T 00 � N ?� d N O O N h O i0, ID Gq N N O N N N 0 0 0 N O O O O O Oav O W O N' €UO N O '- N N N N M V tD c 0 7 0 - v iT) O N .0.. O �.. O E `U' O' L O N o. N 0 L .L- O V N O N NO O O O O , O M m O O N U O (%1 N N O ,`,. ;° ¢ 0 0 O O O 0 N A ,mil N O> N p 2. o N N N .-- N NO V l0 ID O C l0Uy Q N U N Q o C N 0 N 0 0 0 0 0 O o 0 0 0 0 O. C N OOO O N O o 0 0 0 N C U U v c v o a c ° c m y O a m v o o 0 v a a o 0 E o E E o a E m N C v y v N H N O N w L N N N Z N U I� N Q O w 0 ¢ O C I� '- U o 0 0 N N V M 0 0 0 0 0 0 O o 0 0 0 �O V O O O r .- C O �. N d c c 6.o. 'o `m v � m E uM m � o'aZ0 �9 x mo W tip: C W try v v ..vc, v jd N L N N u �.: L N O O � N U: n iU .O- N O w ,n '� �n (n V1 ♦ O c O � v 76 M N i9NU U a m m mU m t o q U d U U Z at U) d ° to oN vvoiro E`u vi `d U) —o gza a N ry N Q« Q ¢ O L Q O N ¢ O 0 A 0. 0 0 N ua C i O u o p d m d � d p O « r u O « d m = O « N N o y c - a vvrn _ O N o c o o < p U v QC :.. P ¢ � v Q Q.- od o w vow o w E m E E > <m E E d a o `d `w tpO N: d O: O 3o N O O CJ p M Ci= N o r a+ U O O n —_ Q M _— M Q N N Q N Ci 000 O p 0 0 0 O P d oo dx E E `w � a a a E iz m d N � 45 m NNM M jp d w 16 asaa1 Uooa C7 d w N N V U o p d N L E U d o V w o N 12 `" � v v E c5 ❑ 11 It. � � 3 C m om N H U L U v N N J y c O C a am w a� w n nn _d d«^`N �Oo E N N m �n i`oo, °mrvno 3 vco o°t°n °o o'v O N O o�o o O C p O N N N N O M V t0 d o o r o _ ° E: O. 3 o « p o ' N o W V N O ... O. O O O° O N o O « � .. Q. O- N ❑ A O N c 0° A 0. 0 0 °° « ❑ 7 O O O ❑ A — H a d V N d U T U« (J U �'^ d C N° N p M Z> N N N N N V (O h d G N 4 0 0 0 0 0 0 C N 0 0 0 0 0 O N< C Ov 10 o 0 0 0. N o 0 0 o 6 a� o > d o U m° `o m o m E E d E o Q Q o Era '� N d d N d i.c d 'ry d r M pOOj = tnoNOV �voa 0 0 0 0 0 0 ° Z N 0 0 N N Q M: "o Q Cl O° p 0 O p 666 O O o p' T", E U M " �+ O� Z O v� ° w - ca In o Tma t v�ui w u �o N ✓' Q� p _ m o d d " a �rn�UU ,� m U UUU 'o U U L ry U a ❑ w 2 m N r r ❑ N O V V m OJ € .- In O O LL m s ee}} V3 ❑ O O O O N •N N N i0 i o cn y u � w c O C U q L c _ E U L W O 0 0 J d a J � N � O `o c Y �000 E m n E € Egg a `w `w CS O CJ O O O O A d U o o 0 0 `o c E E v `w � a S K - d m _ -OJ ao.aa a M M M M UUU m d m m m -lk r U Q A m v C H F N o °ate - N A ❑ N� LL W O LL m 0 3 0 L t U 3 ❑ y ; ❑ - N L II II II it m F- m E E L VI No EO [E-- ° o n O N v ca YJ O U O' " N °. r W V N N M V i0 U p o a min E o E. o n o A ° 0 L LL _ a a0 O O O o O N` U vU M uU � UJ C � O � N 4pJ� 000000 p, N 000 C N O ❑ ❑ m a a a O a o E O E m c E O. E U < Q¢ m E a E E E 0 a o r o 2,o lV C N w ❑` <¢ � 2< ¢'- °b o d o0000o d000 o y.o �`m m c .` -ZO � � O S O a o w U 3 L E N L W U y N d II N N N N am mcn Ua`� Z °o Cl @ N o E ¢o ?'o o� vvco of E = o �' O 0 N� ¢ o c ¢° G S A N y 'p o a = o« N d d ¢ a°i c o ¢ a°i ya'h o000 E m E € m lf a Clf � C do: 0 O ov C7 0� U ocoo K o 0 0 0 0 o c c m v N � E � d d T N O N O o — O O O N - (n N r a a a a E d ioo�oo n U U U LL � U' VI N y d h o WW r U 3 V) 3=° vl ii n u u In m E E . '� a ° a" a ' O 0 d O O W N N O o o N O' N .. o n ° ° Yt G O N NN E v O OO E v O 00 6 ry o O d[ V O O O O p, N O MMO p o C U V 0 N. Q A A Ci00o o A 0 S O O o _ a E 0 d j C J a n 7 N n d U L N Y N N N Q ° U O d N N d y U In C N O ° 4i O C fV N N N N N N to O O O 0 0 0 J i O n o'C O O y N ¢¢ o Tn E. E N d d i N 0 0 0 0 0 0 0 0 d Cn @ C oQQ¢° °oo °d o0oo °o 000 oaai�a�m ° 3 z o h Tin Tu r W NN d 'd d d w u) ~ C m U U 0. UUUU u N N U a D L-i z N cV y N y uNi M N O 'C 1' ui W € O in in in Q m` a > N N w 0 .2.'�i O U2N. O U y�o o o viva O O O O ¢ � Q 0 0 0 0 0 5 a c o a o L a a o 0 0 Q Qp <0 c� 6 Q Q3 o a o E omp 00 � Oo D 09 C O to m c J J d d � a a a a - n T m � � y d nO N L N N N Boo oo N UI y LL LL O� r � y � � oci •L U 3 Z y ; Z) y r II II It II y r > a m u E E av0 ° ON O ON 00 N E -N(V 0 - - N N N o 5 �% o� coo�no Md'tp L IL v w LL a ; Q y J G C y (n 0 O y 9 o E O O o £ 0 0 0 0 N° 0 �c-�° N N O O O O 7 O O O 0 U 6 m$ Ol O O N O C j O N W OJ 10 V t0 V 0 N N N N 0 0 0 0 0 N j C O M�mfO J C M 9�} N 0 0 0 0 Q N O NC7_ C N a o O. a �?0000 C m E m.00 m a o> aDo m m of V Q¢ E E aEi ~E n. o E L a N po 0 0 0 0 0 0 0 eZN Cn W � w 2 << d o °d o0000o p o o c z O h 1!J L W N N G N N N T (£p N A_ U C O C U C — (0 N O N In _— O _ — oo _ Q m N N t J O N m M M yinNC�c�a N N i UUUU c�n.o z r� d� n �0 at0i cn N �o m `� m oN 60006 y o 0 0 vvroco E Too = ui o in in w a °1 yO � 0000 N •- 'UO to N .- UO V •- UO V N 0 0 0 0 N N > > O > 3o X N m Z y = cis cisv d ¢ 0 '� ¢ o c ¢ 0 d° E A ro o N a O E o K N N O CJ O W H a a E a ¢n oy 6000 � � E v m � a r lU j OT C C O _ o C C p: c a a d N m � � N ° aaaa do UUUd U�' in w �Ue m 0 A o a c cj c p � � � n c ad$ E •S.3o E 30 m " as d❑ m ❑ i o m a `.t o �.I LL m 3 in m r- 3 m c o L u u E E _ ry 0 E o N O a co m 3 ry X000 �n o N N N N O '° inoo 0 3 cn 6 0 0 O N O❑ O� � Q N Q A N — — n 'O ai C Oi `N 4 w a - -�o orr �N y E „o 'oo h E o r oo � ° 600000 =°oaog U E o° �- oNO o� 000000 0� ,LL �. ;.. 0 LL 0 0 ° 8 m a c t6 U CY r0", 0 U) � N N N p a J> o m N C N wmu>v env 0 0 0 0 0 0 0 0 0 0 66 oM"rnm p N 000 m C a U NU o m o N a E o 7 H O. U d -2 a< Q ✓+ E Eo E E E -O o r a pE o N C Z N O O 0 p N 9� O 000 O 6 Y O o ❑`a¢N o ❑`aa do 6 .00000 °006 2 a y E O O O Z O N y 3 ly pCj N d h b O a N a C N U W C N a o O G Q N 0! O N O N N 4J OO p �O N N i0 O N ym -- N A in O m to inUU U d :� m m m UUUU d LL � LL G Uao I z an am 'M o°i o h a m °o °a °o "• °o N �0 20 U �o o� vvai�E� �i ¢ a � � n mC'i p n d d o o c g o a m > > m z m u me c mo. J m N O5.• ° O d 0 = O L >, N 0 0 0 0 a m ¢ p m G pa 4 p° o o 0 0 o E o c m > � d o`r U oo ¢co ¢v a a `w F- a u v v v m J '- 6 a O l0 v N N N M M O O LL m Im N Ul N d r LL LL r Q m n 3 c sn u v w m �n. E u g E; 4 U co dl T o 0 0 .. o _ E o E:: "o, �. °o ; �fONNNO 3 mcoo�no 6 M o N' O° O N O O' E N O 00 O N r LL 3 m LL LL a ¢ N ¢ N (n O O N U A° 'LL LL 6 O O O O � OO O O N N^ I� O N^ O� wo 7° �° A N N N� -� 7 t0 'O U UU (J N U N a C N °0 N N a 0000? O_ N O O O O N � N m D o o-co �? �i'o00000 �� �h0000 U —° a p v o v m a E a 0 o E F= E o= E — E L o O O O N Q zo m C a s T O T N pp Ll to N N N pp t00 O 6 y O: w O a< °' w¢ a 2 o 0 o c z 0 3 c° m m 0 mL W c.�c N C N N O m m N m fn fn t0 �inUU U d m mia m J O 0 V} t 7v U U o U a � Z Lam ra o a M 3 `� i°n °o °o °o N T °o `E v � Q o m m Q> ° Q> 9 Q> 3 x _O N LL N CO � O N Z m v u u � a U O 6 = O y Q pU Q Q V N Q N O do.. o N E c E m E a E a s: ~ a o c c c �i N. 3v 3c°o 3m �r �mw o d o d —O v 0000 o m m m `m � a D D U � v m LL � o U LL tO N N N L ro 3 E a UUU d C7 N d y L L O V O O E! A �UQ m A v c � � q N Q L y Y S `v o m ❑ v N �" v m.: LL U o 3 o r U N N V1 h u W E `2 `w a L in y N m a m o o o H To m °o in �n o° "u�000 E "'o E'. "o ..° ;� �U tD OJNry 3�mo�no EO N G 0 0 O O N 0 L a J G C y O C C y w y °0000 U c n O O o o °° Q A° 0 0 °LU„ U LL � LL o L a C3 L U N d N U M N C 00 'CO 0 0 0 6 0 0 0 d C N O 0 0 N a 7 '0000 U3 p v p V m a o ao o c o.2 m o f E E aEi c U w d ¢¢ o `o `o E i E E y 'o ° o o m 0 0 0 0 O C Q Q e Q Q` ° o W d d d o> a a m m O p o Z 0 y vj w oo m� aEL N= N - C O = o N N ul L j c- m _ o p m¢ m y= a J O O m � U(�NU d a g UUd(j C d lL O LL O N 0 d 0 Z a � w y o y o y o o o o N l0 6O N i0 dO O a ¢O � V V W m Z'� U O,L� -'10 'O O L'M N VO O O O O O M V I O M A 0 0 0 0 N C O 7 O O N % O ? IL Go m A� > Z W O U O N N 1.2 N C :� c c m > E :'. o c c 1. d No. d o o d o° d o o o `Qo o o o c U oo' 45 or a a a Ci N O N � N O A 7i aaaa N M M M M N a UUUa c� zz a in 3 A N rn O N O u�i �UQ v C f r N � � m o o al m- Z'j Q Q y .OS :LL = N = N o y C L t ; O ii II II II U y y w E E H y n a "OO a M O N o O O O E N O N cV cV O M d' co y rn m N O O _ o o' o E' ° . J Ory O O, ry O O O O N N y y N' O O o n n 0 0 0 0 °° Q n 0 0° .. k lz LL O 0 0 0 — LL LL o a 0 O O O m L N rp r O A N O > O N J j O m OJ of N V' O V C U U N d U O o O N p�0 0 0 0 0 0 p C N 0 0 0 0 C a N 6 0 R a 1 0 0 0 0 U C O C `o E Fo-E = K E m ¢¢o w a E L o o v o 2 Z m 0 0 o o ci o g m a m y m Q¢ 2 y riM ry O o �Zd y °y u1 UI O W N W vi L O N v m c °' c r-z m m m wo m yy CUa m mm�m C d IL O r Y0 U U O oao z a d w r� r m m 2 o00o � � u� (V � N d N N p in in in Q a — m a > VAN J mo mrn �-0p y Q p0 m Q O d 6 D N C p N o 0 6 o N E tp o. A N O 9 C o > E m u E aE a. .. . `. r a E � v N N O a 0 O p O O Ir U5 v 0 0 0 O A d E v a r a v a 2 R a — '> E W C � •� 3 N N v m O ID O O y O d r LL n IL Qi � v � 3 c ° N N h F y O C o m �n: E Wig. E y N d Q d 6 o rLn C C U D fU II II II II u E m •N a�i - �� -- h n N a _ T O° n . b O.. O E O E O. 30 (D Oq N N O 3 10 0. 0 E oo E m 30€ =N c�i �i oN�mam co E °.... °o E o000 N°O �O �,o o 2 o°. p n ° p°J n 0000 A °o o° tu,U Q c? m ap o m m �� � o 0 0O 0O 0O OO a� OO OO o o C U C N E p QQQ 0 3 o o QZm of o o c5 p 0 0 0 0 0 0O� O.m C w > O 3 r r N W m� to W h` NN N n p m VI IA o A O p c w O O — O_ — Q YO 'C (n O pp O N Q 6] m Y NViV 0Ua UUU U C d lL o IL o. aao z m N C) C) U¢ o L O d o o t� Q o !O Q O C Q U V[1 Q O O N d O OO OO c3 A d C > > > % c O N 5 2 O i d m d CO 2i Z 1. it � U U — U � > U N- U L N C U �• O. C U •..• � J t0 O a �� m O � -d0 y ¢ O 75 m. ¢ O c° ¢ cl o 0 0 0 E ` O q r = m E H Od, E > E a E c c — mdo doo' C7�°' G7 o�O o y emu' ci ci�o °d o Z c o00 0 o c 0 N a E E d d � a _o x v a 2 0 m � 5 N °o 1°n° y m a UUUa ICD N 1/� 10 c a m o v°pi o n U ¢ G f � c� w h F c o f a E. vo d` d o E E c' o' oo E "o EO N o O o moo- E: "o. EO N i O aw mY °o E lV U u��o 'n ono 3m u�comNryo O N �- �- N N N Nino 0 3 mo�io O �- ("1 V cp In d o _ O 7 _ O O ¢ N d ¢ l0 d fn C C •_ d a m m a m N v m N N N N '.O ° O° n° O O O O O 0 0 0 LL LL h m °L tai m O uU (y NUN N m-o oo m c o0000o m oM�mm Jac �`+o�oo o O� `o m o $' .66. a-doo o d U� in E pv o m-do° c = H ago K E m o d - ¢¢ o O VI N E O E O OO 7a E O ry H C N t°O O C N D O 0 0 0 0 0 0 00 d ¢ ¢ ° 9" m 2 P c O O d y E o Y Z O H W (O W L N L d 5 d N VI O y d co = o N d J O O m U(��UUa g � 000 �Ti LLo LLo .c 0 Yo U a O U U o Z � a N d o U) n moo o map � ��mm a Q o M C ¢ o M N OO M 0 0 0 0 d C i d 7 O N c d CO A v o Z In .O YO d vj _ O y m — (6 o O O O 0 Q Q O J E ¢ p N czi m E€ a >' m o E w O c O O m�y CS O O O 0 0 O A d O G C N � A E d d v V v d CO - T m O N O N O l0 O f0 y S K m m m d N tO N t0 � rC aaEL a N M d UUU d C7 N N d d y y d d r LL LL 13 t h r ^ F N L o wOm �.:000: d. C U c N d LL d N LL N d C U L >.a w u m m h H E v o° E E,.. o.M ON 0° ON''o0 EYN O �N(V (V o �MC't0 O b IL w S IL a O Q Q n m a 3 a O O k� N 00 E . 13 tLL S 0 1 O 0 LL LL LL a m dV d U'. U NU I.o �?° `tea 8i'000000 as �0000 Uc p1 U O v O v moo a o° c o d a o E h E E _ Q Q Q o m E L a m ° O O U N Z N d N d d e} O O 0 0 0 0 0 0 7 O w Q¢ o o Q¢ °. °b o 2 d h E 0 0 p c z O y m Tin •m '� 3 L EO r n W A N O — p p d m Q� N N 0 N ���N 9O N Q[O N= N U U a F =O d U m 5 m N UUU U J O U O 0 z L a s n L 9, d m o o o o m °o o 0 0 p o m o m o o v v o ro E o o in in rn ¢ a o:Z'm � 0�`N p porn ao <d�. c G m� c ¢ �<? Om 0000 m c > a > o o p x o LL m ° z m m m a c y a c a c m x `m d ri � UL o = U`m � (js co - o ��rnrn 5 � '0 O O.M .J.. N 0000 J.. y 0000 E d ¢❑ E2 ❑ °' ¢❑ d° E ro o c E c E° F a a E d c w N .E E r J a� 3M 3O OfM ° r o o d 9 ri o o m v 0 0 0 0 o c O c m m d v I- o. px a a w m m m N N N O X apaaa � l0 a ci c"i C) a c� W � y m d � IL IL d �U¢ m A v c � � N O N❑ N h LL �� LL � m O c u L 3 ❑ ; ❑ -' m II II II II v m E CE CL a� yy - a a .on mn is is o N N IpOO° E o E o' 0 3 in to co W N No 3coo�no D. O O N' a_ p n U a a E p o E° °o ° 0 fA (O ��'.� O. �. 03 0: N^ O N 0 0 0 0 °° N^ 0 0 0° L U cl LL LL LL 9 !2 L T ._ ul n ani 01 01 O w _ m`-' N N� O (0 Nip Ni °N Ji NNN�N N J C °C1 NO O L9 d LjU a p NU 000 ry a N Q 6 0000 c U m U'� Ov Ov mma0 p.�o> o.�o ° E° p m ¢¢> E E E a- o r m A m 10 m m c o o dT N an d T N N d d d' O O O O O O t- C. o Q 0 o¢ d 0 0 0 0 0 0 60.. > a ' 0, E TiM io £ zd w m m� a t0 3 s - H N IL N S �' z II m N � tr0 W L :2 ca 2 ¢ m F O w m `' '" mLLVJUUUa m m m U U U U N N C d LL O LL O 00.0 z N �•- N �� � �.- oN vvco of E = ui Q � o in in in a > w 0 0 N C N U U U in N C (7 y = Utih c UL �: c U Lv j m o� ayim �D U Nis 0 0 y Q C-1 o � � m d o6 d o d oc6 Ko oo o m v Q O Q O Q N 0 0 0 0 O O E E v `m � a u v d d Coro -c o. -co' cp a d S R' _ O � �aO aaaa � m a U UUd C7 m m' m yO N N IL r IL Qi m a c kn r c � I- N N rn r n. E _u, g E 'G 0 wN '.LL wy u. in aoi 33m z 3� U M 0 a z in y � in N m v� In o00 a N 2 �> E N': 3 0 E N W E O W d N o = N N n J G C O 7 vii vii m o < - 'o o r l E �'-3: �N m )o ° C:i v o 0 o ° ° 8 o o LL � LL 9 a m 12 y U � E C N y (n ° C 2 N O Ch O O v+ UN ? N 0000 0 0 U, N 0000 — a N E E H E = K E ¢¢ o H a E� o _ m J O O C d LL O LL O N Ua`o z a@i 3 y inoo °o � o N U ��� oN vvc6 cd `m in in in ¢ ° > m >o v o rn o U �O,I 000 Q O G Q V C Q o C, 0 0 0 0 O o LL ° o Z N c 10 U V1 - U.c co - UL 7 �o O O vv -a O 5 O = O V N O aai a°i c ai 9'h o00o y E v a p a 0 v < p `o c ca ° �' m E m o @ ro- d a E d K ` `m r do, CS oo d o C1 BN ° m v d `m � a o v rn v aai N C N: - d d m � � m m a a a a � c m ¢. UUU am. C7 UI IA N C h U a m i a c � � UC y y F N O .L O m p o R. :IL N« LL@ C O@ L O � N � m > N o D o D L L a N C G O O %t � o N o N. In @ O o o o m o D Z) 0 o ° a o ow N 21 C7 N 0 0 0 0 0 J> 0 0 0 0 0 O N O m °� CJ mV tO HU m �' c �?° m c �i'0000 0o m °c d0000 �j m o da o E > E o E E _ E U a a Q `^ F. Eo 0 9 ° n Q N_ O O 0 0 0 0 @¢ Q N @ a O 0 0 0 0 0 0 � � o d d c o O � Z O N o N L ti llJ C. lz N `J N � c C �` A O C o u) m min�ciUa mm�m m c O% U o U o z 0 c�a`❑ �N o a n O L n M L� (00 3 d X 0 0 0 h T 0 `m n i i m° ma o m r o:Z'° 02'° O o:Z'm n °doo d o� o000 x m N U a a C d a- �_ — x C m v N } J a J C V O w oa � oa o O aa6 �`°o o E �E A a 8 E o m E E 3 N 3 m doh do`c d o �o Vo VOoo o m w o000 o m t= a a a o S9 5 ctt -fO aaaa � ro H � N LL li y U¢ m A v cm o a N s m t- �- ._ y r E N F! O C N vi .� y w E o E "o. rna- `mp m" m loo a@i o6 �' 3m c s is U u v v m n a a a. EE oO p cV o N N N O6, l6 d N ¢ ¢ h y N (0 O � U O O C.N 0 0 0 0 0 0 p, O O O O U U M. N.� N o �' O n o Q n 0000 0 0 0 0000 .- :� .. 3 3 3 0 o :D LL. LL LL a m o O -1 1 �. ? l I I I I I C r N C - mt �L1 Uo 0��� �- oi N , °� d U 2, O° o OOOO Rm 6 goo 000 o Om CO6 8 O6 o 6 00 o o o ° > t0 O@ o o a°ia E _ $ o E C an d `m 0 0 o a Q z m N t0 O T C 0. K M r N N O V K C o d� 0 �1 2 d 0 0 0 0 0 0 p 0 � o¢¢ o o` ¢¢ M d o d 0 0 0 0 0 0 b o d 0 0 E 'm &mE o o czo hm NO c� �. W C� N m EL i0 m m y " o- Q> TO N � �O K � m N y d U U d m m m J O U O m N o U U U U U h C � IL O LL 0 r d'i'e U U o c�a`❑ z ^ < o N aw-o n a no o a o. rn m H o�� C! o�� d o�';a m� 0000 w Q c Q < o o N J 1 i O _ M .O O.L. In Q tG. O L C N O O O O w OOO O d ¢❑� ¢❑ N ¢❑ C y O O C o p d `m `a c d° O oro O or O o 4! oo�g o A v U o m `w � a lV N N M NJ N N o a m m m m x ro a a a a � E m m I I I 1 10 U U d 0 N N d F y V V O V O M m c�•m J ;sir LL ri u. v .o v U < m - o o K N O' ❑ m 3 a � ❑ � .- LL N� LL N O C O L N �I II 11 II L U E N E N N r�ii a a a rn >• p o >• � o N"'o m 0000 °o � y�000 a N O= C 7 (n (n iT, J C C O O < N w Q N ^ x ro v o U IS a 0 0 U O N N N M [Y m I3 o E� 3 0 a N° $ 0 U W m o o° ^ .b LL LL 3 3 3 ❑� 0 0 o D J O E2 o a ,. �- m� �O- L U UU UU p� N° N O 0 0 0 0 0 0 D. C N 000 ry a N J �000 € c E > p o E F- E _ - E m <¢ E N N EEO pE o a 2 0 m° Lo N N N O U U N Z N C N C N. E2 O 0 0 0 0 0 MO 0 0° O.� N o2 <¢^ �EG <¢` °00 d 000000 4000 oa- sl ❑ °p �� Jo.N E o o o Z 0 r N f=$ c N O W LZ'.;2 N- J O O C � LL O IL O Uo`❑ z w a N ���� �a @� oN avai c6 E =� o G y L UO L'N C7 0 O O O �'N ` N 000 N o C G° C Q I° OO n 0 0 0 0 ry at m u ova G o t � � � ory <a o �00o dE mao 8i' mE m E > Li F a E a `m N 0 O (V Cl O 9 i O O O O O c c N N Q .- < v d 0 0 0 0 0 o m v `v � a - a o a v _ we p � E m � °o �i °o a UUU¢M. C7 N b NV O M O �0< m m v c 1- I- c4 o s E 00., 30 O d N p C rj 10 b IL d 1/I IL d M N 3 3 N C U N p,.. N> N m C U a N d i E ¢L. o.y ny N i g N ¢o °a pn @ _ rn °$ M ° o E "o ° o w �1no1n in ino00 O N, -. 0° O N N cV N W -LL w IL d N < < � C C O O a m w a m N v m - O o° N N ° E " 1,0 U m d A° o o° Y u. u. 3 IL 3 IL 3 ` 0 •N a @' O� M � %' y (J y U j > (D ° O N O 0� 0 O C N N NNN N N 0 0 0 0 0 0 O M V O I� p_ N O O O O p 6 V Y d 1 h 0 0 0 0 0 0 0 0 0 0 0 U N o - E @ u 0 o E E E < L E a E r n 10 0 m o v o o o Z@ t� T N @ N p N C d !p NN T N @ N O C N N D p w o< Q Q¢ Q d o 0 0 0 0 0 0 0 4 0 0 0 o a a d m m w E @ O N p N Z O — 3 t m H W N p 0 O :1tea t r NNN: d - v m 1D ID V UUd m m m m m C d ll� O o LL O. .. •' Sao z N �o F, a p N o ° aim C7 0�o O o=� �•O 0000 � = Z y U U h C U = co N O d y Q p d Q p E Q pp c a N O O O O E E E m > a E a K y a Eag o. dog r- do� n. d o. Ku? o n E U O Q m Q m Q M d 0' OO 6 c3 O 0 C w Em E � a t0 W O• O: -. a a v v d L e c c N � M l0 t0 t0 � TC -°J aa.aa o � ¢. UUUd C7 O V rn O V O O p yp d r IL fV IL M d �UQ m m v c _ f- �- E x.30 E,' 30: mN'a°iDd c U 3 y N in m E E n a a N a y o °o. N T oo a m coo° ino LL m m o pp O� 3: � g s E E m 0 to d o° m. o° a n° p n 0 0 fS U W LL 3 3 0 3 Y m= L'p m N A d UU d NU N N 0000 O O 6 N 0 00 N a N Q Ni ° nD 0 0 o p C N ❑v oV ma as `° °Ed ¢¢ o p w E E E 19 t0 ° ai 0 0 p o ° m m c o o y o¢¢° d o d 0 0 0 0 0 0 °b 0 0 0 0 a Y d m & E c m Z ' O y � L N d N UI UI O .�E� m c 0 W 5 1��. y c m i0 fn inUUU d O m N� m 2 U U U U d " N LL O N LL O C .c o -9 U d U U o Z w w N = in in in a °J w 7L cw� NQ « O i° C « O �} N +- UO V pO A 0 0 0 0 N ¢ N C > O 7 O N % Of O A LL. CO O m z (n N U L m C U L V: C U �. N J C p p E a c E m aE`� r a a s a `w `w _ c c 0 6 0 C� C3 d 3 o 0 Kx 0 ¢�2 0o 0rn 0 m o o Z A c 0 o m m � E v r a 0.. c q... d d O: l0 O. In 0 � U dam Lzr 10 'C a a a a 3 Ern ° 'so o m M U U U d U w N If LL o � 3 m r LL a N U ¢ N N U O y x tN0 c r r E o E A 6 z 3� a n SRC n N o inOOo `y O N N SO O N N O € N 30 �° O O N N O 30 (D O V c0 (nY LL w LL d N ¢ m ¢m m c ° aJ on c0 y m m C C o a O N E U° E v° d N O 6 N 0 0 ° 0 0 °° d (V 0 0 U V O° N.c O O Q A O Q A . O O O °° O A° D Z) LL LL a ao ` � O N 6 . .-11777— N a m� P O0"�N SON J�O�p WmOV NV E OM�rnO p N� 6 N N J C M j d N ° > C3 OO OO OO f .0000 C aD o oEa ¢¢ Q `o Zm i,m mo >`m m `��n N a� ���N °vii �� m m nY °� N C d O M. 0 � O � 0 0 0 0 0 0 � O�' � L° C ¢ Q O¢ Q we w D �❑ d (S d O j .° d i0 z O H� TES a°i vim. A m v�: y ° -� U in « (V « N C d N IL O LL p. can`.❑ z G N � G y � N � O a a s _off avmco E'er vi a`J UO N o- cy Q F V G ¢ M C Q UO M Q n 0 0 0 0 4J C i O O li. CO O Z d U Uo �O C UO L O J N O 000 J'C y Qp Qp d Q p N 5 C5 C3 aJ E m m a H m > LL E rn d o cyy{{ E � a = of q N a L M M M S cJCJUa c� A UJ O H O rn N N c _ m mr.3 o m "'3owo uJ aJ N p� an d LL N N LL N O c� t L3= 3 j:. O II II II tl ry E Yy��GJ E n. h �o a "In000 rn o o E N`"O N o- E:N "O: �`O In lnoln uJ o 3� NOWNNO ¢ 3ytp OIOO N a 4J O 7 O N > t ¢ C m VJ O O Q E yO �.0 E, vO '-' N O d(V 000000 6 dN 000 UU N UJ O N N 0 0 Q^ O Q n 0 0 0 0 0 O 0 0 0 0 r .-. LL 3 3 3 o r m L cy N O N N O> O N C O ,tFO W cp IO V IO V 0 0 J O M W p N � W C3 ❑v E �V o ma E as p F- a E m o aJ � _ «o o` `m E oo m E t o maJ o A C N N. N m T C N N i0. o to N O to S N o 0 0 0 0 r N 0 0 0 c O O io Z U" 3c° `-'m � N o 7i o 76 u) U)NU U d � UUUU Z'J LL o LL o Uap z C, _ L m L y 0 y N �nN - N = vi o � ti ° Q N O C Q O C Q ❑ A N O m U V o LL N N N N O M N QQ m A ¢p C m E d Li d d LL a ~ ¢ o c c m � a — c JF�, � m — N In as a - � OJ m m m m k aaaa � a UUUa U�' v A C O O O N C f i5 w � m x u c m m ~ o c l � d❑ l" N ❑ L U 3 = N 3 = M L II II II II U) a o o c o E.N '-'o: o ?^0 y ...... 3 m u>cowry No 3oo�no - a° o «° o r° 0 0 0 0° Oin o° 0000 o °oo° IL IL o LL. 7B O a0 O .'J✓ m N OI O ASI 1 1 t0 L 2 C Q J O h C d T N . W ro N V 10 V O th �- m of 0 0 0 y C V N U D O N E m `o E° a E¢a N C N O C N O O 0 0 0 0 N (00 O N w a¢ N. Q¢¢ d °d o 0 °o O o 0 0 0 o 0 °d 0 0 0 2a�°NE A 3 L N VI O W 0 y r W y L N. L N � N O d d U N T N a C C 0 o C C r w Q — O — N pp N O N i0 O _ Q _ Q] y m r w N N ~ O 4 N V A V O ciao m zo N v NZ N „� 0 co W 65 o: n 0 0 0 0 M '^ Q= M p n 0 0 0 0 q O O Z # N y U N C N d m � N O O O C O« C O L C> N d 0 0 0 0 - m Qpm l @ Qp'.. v Qp.... g a 0 q 0000 `m E ` m CI o E c E m y w c E E > € 3 Li L .. .. L: FT a E ` w m N m m p: 0 o m o 0 CY 2 o N O. N o V dm' V 0 0 0 O J J W o a E aEi `w F a a a = K c5 m � y vl N�N m mmmm .T< �Em aaaa 00000 0 � '^ m LL S. UUa (9 m e w w V o � w x m � o Ng d N n LL C o m LL G U rn U Q m m °O. .mr E'° m� oo m q - ,-6 U m 11 II 11 IN N _ m q via' E mN 300' E mN 300. CCw° 3 � NIOm NNO �NNN 3 d<ooNO � ON O Om O CAN ON O��"M'V f� G C O 19 O yt N N O 0 0 N O U (/J LL 0 0 0 O o 0 U LL O O O -ca? O O c N 2 �(7_ m- c m Q U o_ m nv� Ol o >oN N O j o m mmN V Nv E N N N o r C N N O o 0 0 N N c O N j a Z N o N (J v 0 a YS o m a y 0 0 0 0 0 0 q N 0 0 0 0 c V U N U O O 9 0 a o> m o o d a F d E N = Q O o m q E E E E - Q Q O o L Q r a g N q >` q o N N N.1 O N a M m O _ n = N U t0: Q: o w `I ` O C O m Q: 0 0 O o N 0 o O O O O O O O o 0 0 0 N o t00 O �- O' 0 0 0 Y N N N« � w � _ u N N N l7` Q W C 1L IN`: W N L N L m m y E.S G C J O O W Ti lo- LL O U a O Z N N L N N N O l9 to tit Q m N d U D 1pp o d U M O U a N L O V V C V .-. .o d Q N C Q -Oy G Q= D A 0000 a = m ° a w h `m c U to .o oar o am Utv >ri �' o.00 c v W N N 0 6 0 6 C N m 6 R E N a W > 0 0 € F E v .. - a E `: u c o m o to E v w F a Ta O .c m y MMin o m a UUUiL (7 d N c •.• o o � 1Q ° n m co m o ja ^ z w ai m 3 C m '•Go ' O - ,�Q��. oo.. ydr - LL La N N° N N W N H J C U N N ts/7 I- T a o, maa E �N:3p E min 3° T °o 3 m u�i� °mNN °o ; mv'o, oo uo oo ° O O 0: t7 - t a w o o Z) w m J rr C C C U y O O lio' N to N < O O d O O Q^ O CJ 0 0 0 6 o 0 O p 0 U LL m ry V U S d U p H () U U C b 0 N c O N 0 O C o a �° y o N o o N N 0 0 0 0 0 0 0 0 0 0 0 0 L O O M V (O p, C N p 0 0 0 N . 6 6 6 6 H o O N N ry �p C V U N 1. m o v .a � m w o ° a a N E E E E ° a o o ° Z N U 41 N N 0 N 0 0 0 0 0 0 N N « C_ O Q ci w 0 Q o O Q Q 6 o o O d a o 0 0 0 o 6 0 0 d o 0 0 A C o w 5 v :: x m 5 E o A N c Z O a M FH O' S C d T L W W II N a •• V N N N N o. C A p« LL C1: U li p: U v Li 2 IE m NM N mo m N v � m0 m yin N mo o °oo oN vvai of E uui °o U« C(1 ^ o. a Q y N o 0 0 0 m O N 0 0 0 0 N C i U O N Z N # U F U m M d - rp Q o ` ¢ Q c Q pu o 0 0 0 o a°i E m a m c E a > u E E € c a E `a a —r a3 N m voo o m O o rn 3 m O o in o m v v rn m Ko 0 0 I? 0 o 0 c J J c V O Q M Q V Q O' 0 0 0 0 O C O y q E � � a O. a a K° _ 0 N waN mmmm K Em c aaa.a u°i °o i°n °o � m U U U a 9 d N N U N i NO N LL IL G U v c v w 3 °o u o c Em3o wmo E w o w a E E � T V ENV O 7 O E N O n m N T O O n N �O O i0 m �fl (O ttl N N O a O. o O W N �p p a lo a s f7 E v° E O. ry 0 0 0 0 0 (7 y 0 O O Q n Q A 0 0 0 0 0 O N A 0 0 a � " o � 3 o 0 o a 3 o u m o 2 0 m y O^ _ O N m U U° a _ o p i C o C ry m N J° N o o N V o V L ry C N d O O o O O M N MO O O m O ` U N a 0' 0 � D_ a v? ? 0 0 0 0 0 0 N 0 0 0 0 U'q E �v � 0 c 2 E ac 0 j 9 O Q c N O E Q Q o' j N p 0 2 QQo d 0 0 0 0 0 0 o a o v'- w `m m 3r v N O N� N N m ~o m �Lo U)Sa. m U N N C N W LL� LL O U a ❑ Z L N N L N N aco o "° 3 N O O N T O ❑ N O. N ¢ O 0 O= N G ¢ O C O .- N Q❑ N N O o. O O N O i o N O m LL ZN u m m W C U L c) 0 0 C C o d d d w E o c m m E c� U O° o m m pw E E o v � a a a N v N 7 O C C p C C c p'. C O N v a m m m m m N - o a a a a a UUU d C7 a m N 0 o N m L1 N V. G m LL 13 y U¢ b 3 v ci N V ` p c t m m Fii- N o oo L- yO � ❑ IL LL m N C m h H A 3 3 L u iT iD iN � N [O fn H n m d •�.• C 80 O `1 N.. O O N O 00. O m T°o .O N m �oou> o o ; N N l0 of N N O p N �- N N N umi inoo 0 o d m O N O O Cl V (O N N- ¢ a p O° o° N O 0 0 0 0 O o 6 N 0 oo O 0 U ` L U f7 E w LL Q ^ d i d Q c 0 d d a o o o O O N d N C1 U U O N ^� d N U 0 O O> O N O C N° � o° N N C O W �O V N C r C N N 0 0 0 0 0 0 m O M O) C N 0 0 0 0 d N — a q E O" € m o w a` 2 -:5 Q `o n p E E E o E o oo v o n - `m w °1 m•- wx m° v �Z m ,r N N 0 0 0 0 0 o 0 0 0 0 O O C y_ = W a'o 12 W ^ >i E N Q m m `� m NrnUU U m m m m N LL. d, N N LL d t : U U U a O Z imp m o i n M t vl m w o `m a vo v n a " N o °oo - o o o oN wait y o m UO 0ry � N d O tog., # A O O m Z Q 0 @ Q p v Q p w II o m E E v O m m 6 E d r a c c c o = m - d a m m m m x m E v 3.� a a a a a goo o�ua c7 W g v O C N N m 0 impr a U Q IL a{ m IL IN m O � d Est ik ik C � cx, 3 � w F!u•`ocv u v w = c o U to N N (A F- T III w C u a N d ai L a •, w m c a v � - a a qL - vn - M N T H .N "' N N N N N O h h O 3 N (O OJ N N (V O N Hum-6 v� 3 0• 3 a 7 a � � Q z O y O C O C (9 m O O HIM d N O p O O U U > > 0 0 o u ry. U- E € c E c j c E m u o $ E v E Q Q o a T C N M N T C q NM. N m lip Q Q Q O 0 W c 2 d N Min., �v•- E uM c ,n m � 3 oz0 a ry wL ro W N v '„cv, `v qt L cii m� LL. O Rio k p t L « U U U a O Z Outlet Protection Figure 8.06c: Zone Determiniation for Apron Material ,r r C, w F S FES 17 FES ;L5 Figure 8.06d: Length of Apron I E7 T§:b d M 101 1 m va i - Us 4 'D, Q. cv L CL R 4- O i O 'Ln V 0 L LL L 7 d-d- 0, S cps 0. • ' •' Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Sunday, 00 16, 2013 Pond No. 4 - 10 ft level spreader Pond Data Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 100.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 100.00 60 0 0 0.10 100.10 63 6 6 0.20 100.20 66 6 13 0.30 100.30 69 7 19 0.40 100.40 72 7 26 0.50 100.50 75 7 34 0.60 100.60 78 8 41 0.70 100.70 81 8 49 0.80 100.80 84 8 58 0.90 100.90 87 9 66 1.00 101.00 90 9 75 Culvert / Orifice Structures [A] [B] [C] [A] [B] [C] [PrfRsr] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope ( %) = 0.00 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Weir Structures Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in /hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 [A] [B] [C] [D] Crest Len (ft) = 10.00 0.00 0.00 0.00 Crest El. (ft) = 100.00 0.00 0.00 0.00 Weir Coeff. = 2.60 3.33 3.33 3.33 Weir Type = Broad - -- - -- - -- Multi -Stage = No No No No Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in /hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 100.00 - -- - -- - -- - -- 0.00 - -- - -- - -- - -- - -- 0.000 0.10 6 100.10 - -- - -- - -- - -- 0.82 - -- - -- - -- - -- - -- 0.822 0.20 13 100.20 - -- - -- - -- - -- 2.33 - -- - -- - -- - -- - -- 2.325 0.30 19 100.30 - -- - -- - -- - 4.27 - -- - -- - -- - -- - -- 4.272 0.40 26 100.40 - -- - -- - -- - 6.58 - -- - -- - -- - -- - -- 6.578 0.50 34 100.50 - -- - -- - -- - -- 9.19 - -- - -- - -- - -- - -- 9.192 0.60 41 100.60 - -- - -- - -- - -- 12.08 - -- - -- - -- - -- - -- 12.08 0.70 49 100.70 - -- - -- - -- - -- 15.23 - -- - -- - -- - -- - -- 15.23 0.80 58 100.80 - -- - -- - -- - -- 18.60 - -- - -- - -- - -- - -- 18.60 0.90 66 100.90 - -- - -- - -- - -- 22.20 - -- - -- - -- - -- - -- 22.20 i.00 75 / O 1 U I . UU - -- '101 --- - -- - -- 26.00 - -- - -- - -- --- --- • • Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Sunday, 00 16, 2013 Pond No. 4 - 15 ft level spreader Pond Data Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 100.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 100.00 60 0 0 0.10 100.10 63 6 6 0.20 100.20 66 6 13 0.30 100.30 69 7 19 0.40 100.40 72 7 26 0.50 100.50 75 7 34 0.60 100.60 78 8 41 0.70 100.70 81 8 49 0.80 100.80 84 8 58 0.90 100.90 87 9 66 1.00 101.00 90 9 75 Culvert / Orifice Structures Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (cc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Weir Structures Storage / Discharge Table [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 100.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert EI. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad - -- - -- - -- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope ( %) = 0.00 0.00 0.00 n/a - -- - -- 3.49 - -- - -- N -Value = .013 .013 .013 n/a 19 100.30 - -- - -- - -- - -- Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in /hr) = 0.000 (by Wet area) 0.40 26 Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 - -- - -- - -- Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (cc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 100.00 - -- - -- - -- - -- 0.00 - -- - -- - -- - -- - -- 0.000 0.10 6 100.10 - -- - -- - -- - -- 1.23 - -- - -- - -- - -- - -- 1.233 0.20 13 100.20 - -- - -- - -- - -- 3.49 - -- - -- - -- - -- - -- 3.488 0.30 19 100.30 - -- - -- - -- - -- 6.41 - -- - -- - -- - -- - -- 6.408 0.40 26 100.40 - -- - -- - -- - - 9.87 - -- - -- - -- - -- - -- 9.866 0.50 34 100.50 - -- - -- - -- - -- 13.79 - -- - -- - -- - -- - -- 13.79 0.60 41 100.60 - -- - -- - -- - -- 18.13 - -- - -- - -- - -- - -- 18.13 0.70 49 100.70 - -- - -- - -- - -- 22.84 - -- - -- - -- - -- - -- 22.84 0.80 58 100.80 - -- - -- - -- - -- 27.91 - -- - -- - -- - -- - -- 27.91 0.90 66 100.90 - -- - -- - -- - -- 33.30 - -- - -- - -- - -- - -- 33.30 1.00 75 01.00 - -- - -- --- - -- 39.00 - -- --- - -- - -- --- 39.^vu Hydraflow Hydrographs Extension for AutoCADV Civil 3D® 2012 by Autodesk, Inc. v9 Sunday, 00 16, 2013 Pond No. 4 - 20 ft level spreader Pond Data Contours - User- defined contour areas. Conic method used for volume calculation. Begining Elevation = 100.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 100.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 60 Storage / 0 0 0.10 100.10 63 6 Stage 6 Elevation Clv A Clv B 0.20 100.20 Wr A 66 Wr C 6 Exfil 13 Total ft 0.30 100.30 cfs 69 cfs 7 cfs 19 cfs cfs 0.40 100.40 0.00 72 100.00 - -- 7 - -- 26 0.00 - -- 0.50 100.50 - -- 75 0.000 7 6 34 - -- - -- 0.60 100.60 - -- 78 - -- 8 - -- 41 0.20 13 0.70 100.70 - -- 81 4.65 8 - -- 49 - -- - -- 0.80 100.80 19 84 - -- 8 - -- 58 - -- - -- 0.90 100.90 - -- 87 0.40 9 100.40 - -- 66 - -- - -- 1.00 101.00 - -- 90 - -- 9 13.16 75 34 100.50 - -- Culvert / Orifice Structures - -- - -- 18.38 Weir Structures - -- - -- - -- - -- [A] [B] [C] [PrfRsr] - -- [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 20.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 100.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad - -- - -- - -- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope ( %) = 0.00 0.00 0.00 n/a - -- 5. 00 :JL.VU N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in /hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 100.00 - -- - -- - -- - -- 0.00 - -- - -- - -- - -- - -- 0.000 0.10 6 100.10 - -- - -- - -- - -- 1.64 - -- - -- - -- - -- - -- 1.644 0.20 13 100.20 - -- - -- - -- - -- 4.65 - -- - -- - -- - -- - -- 4.651 0.30 19 100.30 - -- - -- - -- - -- 8.54 - -- - -- - -- - -- - -- 8.545 0.40 26 100.40 - -- - -- - -- - -- 13.16 - -- - -- - -- - -- - -- 13.16 0.50 34 100.50 - -- - -- - -- - -- 18.38 - -- - -- - -- - -- - -- 18.38 0.60 41 100.60 - -- - -- - -- - -- 24.17 - -- - -- - -- - -- - -- 24.17 0.70 49 100.70 - -- - -- - -- - -- 30.45 - -- - -- - -- - -- - -- 30.45 0.80 58 100.80 - -- - -- - -- - -- 37.21 - -- - -- - -- - -- - -- 37.21 0.90 66 100.90 - -- - -- - -- - -- 44.40 - -- - -- - - -- - -- 44.40 00 �I.UU 75 /U IUI.UU --- 101 0 - -- --- --- UG.UU --- - -- - -- --- - -- 5. 00 :JL.VU r • • Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2012 by Autodesk, Inc. v9 Pond No. 4 - 25 ft level spreader Pond Data Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 100.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 100.00 60 0 0 0.10 100.10 63 6 6 0.20 100.20 66 6 13 0.30 100.30 69 7 19 0.40 100.40 72 7 26 0.50 100.50 75 7 34 0.60 100.60 78 8 41 0.70 100.70 81 8 49 0.80 100.80 84 8 58 0.90 100.90 87 9 66 1.00 101.00 90 9 75 Culvert / Orifice Structures [A] [B] [C] [A] [B] [C] [PrfRsr] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope ( %) = 0.00 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Weir Structures Sunday, 00 16, 2013 Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in /hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 [A] [B] [C] [D] Crest Len (ft) = 25.00 0.00 0.00 0.00 Crest El. (ft) = 100.00 0.00 0.00 0.00 Weir Coeff. = 2.60 3.33 3.33 3.33 Weir Type = Broad - -- - -- - -- Multi -Stage = No No No No Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in /hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 V V Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (cc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / S Storage / D Discharge Table Stage S Storage E Elevation Clv A C Civ B C Clv C P PrfRsr W Wr A Wr B W Wr C Wr D Exfil User T Total ft c cuft f ft cfs c cfs c cfs c cfs c cfs cfs c cfs cfs cfs cfs c cfs 0.00 0 0 1 100.00 - -- - - -- - - -- - - -- 0 0.00 - -- - - -- - -- - -- - -- 0 0.000 0.10 6 6 1 100.10 - -- - - -- - - -- - - -- 2 2.06 - -- - - -- - -- - -- - -- 2 2.055 0.20 1 13 1 100.20 - -- - - -- - - -- - - -- 5 5.81 - -- - - -- - -- - -- - -- 5 5.814 0.30 1 19 1 100.30 - -- - - -- - - -- - - -- 1 10.68 - -- - - -- - -- - -- - -- 1 10.68 0.40 2 26 1 100.40 - -- - - -- - - -- - - -- 1 16.44 - -- - - -- - -- - -- - -- 1 16.44 0.50 3 34 1 100.50 - -- - - -- - - -- - - -- 2 22.98 - -- - - -- - -- - -- - -- 2 22.98 0.60 4 41 1 100.60 - -- - - -- - - -- - - -- 3 30.21 - -- - - -- - -- - -- - -- 3 30.21 0.70 4 49 1 100.70 - -- - - -- - - -- - - -- 3 38.07 - -- - - -- - -- - -- - -- 3 38.07 0.80 5 58 1 100.80 - -- - - - - - -- - - -- 4 46.51 - -- - - -- - -- - -- - -- 4 46.51 0.90 6 66 1 100.90 - -- - - -- - - -- - - -- 5 55.50 - -- - - -- - -- - -- - -- 5 55.5C • "' • • • 1 Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2012 by Autodesk, Inc. v9 Sunday, 00 16, 2013 Pond No. 4 - 30 ft level spreader Pond Data Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 100.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 100.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 60 Storage / 0 0 Stage 0.10 100.10 Clv B Clv C PrfRsr 63 Wr C Wr D Exfil User Total 6 cuft 6 cfs cfs cfs cfs cfs 0.20 100.20 0 66 - -- - -- - -- 6 - -- - -- - -- - -- 0.000 13 6 100.10 - -- 0.30 100.30 - -- - -- - -- - -- 2.467 69 13 7 - -- - -- - -- 19 - -- - -- - -- - -- 6.976 0.30 0.40 100.40 - -- - -- - -- 72 - -- - -- - -- - -- 12.82 7 26 26 - -- - -- - -- 19.73 - -- 0.50 100.50 34 75 - -- - -- - -- 7 - -- - -- - -- - -- 27.58 34 41 100.60 - -- 0.60 100.60 - -- - -- - -- - -- 36.25 78 49 8 - -- - -- - -- 41 - -- - -- - -- - -- 45.68 0.80 0.70 100.70 - -- - -- - -- 81 - -- - -- - -- - -- 55.81 8 66 49 - -- - -- - -- 66.60 - -- 0.80 100.80 -,.- / V 84 - -- - -- - -- 8 --- - -- ___ -_ 7A M - ....w 58 0.90 100.90 87 9 66 1.00 101.00 90 9 75 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 30.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 100.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad - -- - -- - -- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope ( %) = 0.00 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in /hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 100.00 - -- - -- - -- - -- 0.00 - -- - -- - -- - -- - -- 0.000 0.10 6 100.10 - -- - -- - -- - -- 2.47 - -- - -- - -- - -- - -- 2.467 0.20 13 100.20 - -- - -- - -- - -- 6.98 - -- - -- - -- - -- - -- 6.976 0.30 19 100.30 - -- - -- - -- - -- 12.82 - -- - -- - -- - -- - -- 12.82 0.40 26 100.40 - -- - -- - -- - -- 19.73 - -- - -- - -- - -- - -- 19.73 0.50 34 100.50 - -- - -- - -- - -- 27.58 - -- - -- - -- - -- - -- 27.58 0.60 41 100.60 - -- - -- - -- - -- 36.25 - -- - -- - -- - -- - -- 36.25 0.70 49 100.70 - -- - -- - -- - -- 45.68 - -- - -- - -- - -- - -- 45.68 0.80 58 100.80 - -- - -- - -- - -- 55.81 - -- - -- - -- - -- - -- 55.81 0.90 66 100.90 - -- - -- - -- - -- 66.60 - -- - -- - -- - -- - -- 66.60 1. ,... .00 -,.- / V - -- 1011.00 - -- - -- - -- Io nn - -- r o.vv --- - -- ___ -_ 7A M - ....w