Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout20200469 Ver 1_Sediment Loss Restoration_20210812From:Westphal, Anneliese
To:Sprinkle, Hannah H; Shaver, Brad E SAW (Brad.E.Shaver@usace.army.mil)
Cc:Farrell, Sean C; Herndon, T. Mason
Subject:FW: Duplin Bridge 36
Date:Thursday, August 12, 2021 7:20:08 PM
Attachments:image001.png
Area 3 IMG_4480.jpg
Area 1 IMG_4488.jpg
Area 2 IMG_4484.jpg
Area 3 IMG_4476.jpg
Area 3 IMG_4479.jpg
Hannah and Brad,
Yesterday Sean and I reviewed the subject project (B-5639) and reviewed the sediment losses that
occurred after this past weekend’s rain events and were originally reported on Monday, 8/9. The
contractor had been placing borrow on the detour alignment. The silt fence and fabric (which will
eventually encapsulate the detour fill) contained most of the sediment but there were losses to the
hand clearing areas and wetlands.
The areas are identified as:
Area 1: Approximately 10’ x 10’ and 6” deep in the vicinity of Sta. -L_DET-Sta. 21+50. This has been
removed by hand tools.
Area 2: Approximately 10’ x 15’ and 6” deep in the vicinity of Sta. -L_DET-Sta. 21+50. This has been
partially removed by hand tools (the higher places) but is still partially flooded, so we asked them to
wait until the water recedes to reassess to determine if more needs to be removed.
Area 3: Approximately 15’ x 8’ and up to 6” deep in the vicinity of Sta. -L_DET-Sta. 20+00. They had
not started removal of this area yet. We discussed how much they would need to remove. We
asked them to wait until the water recedes before starting in the areas where the water is standing
(and also because it is difficult to assess how much needs to be removed). This is to avoid creating
turbidity during removal.
I update you both as removal continues. If either of you would like to make a site visit at any stage
of removal, please let me know.
Please let me know if you have any questions.
Thank you,
Anneliese
Anneliese Westphal
Environmental Senior Specialist
Division 3
NCDOT- Division of Highways
910 341 2000 office
910 604 1330 mobile
910 675 0143 fax
awestphal@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429-5647
From: Westphal, Anneliese
Sent: Monday, August 9, 2021 11:48 AM
To: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil>; Sprinkle, Hannah H
<hannah.sprinkle@ncdenr.gov>
Cc: Farrell, Sean C <scfarrell@ncdot.gov>; Herndon, T. Mason <tmherndon@ncdot.gov>
Subject: Duplin Bridge 36
Brad and Hannah,
The project inspector at the subject bridge reported this morning that the project received 4 inches
of rain this past weekend. The water is still high and therefore it is difficult to access the extent of
sediment losses. They plan to provide an update when they are able.
Thanks,
Anneliese
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
2©{«
.:. . ryv..
.. a
» «w
�
• x
. vA
-
��§�\���\�/\\yam\
. ,
Mew Ws16