HomeMy WebLinkAbout20171060 Ver 2_Pre-Filing Meeting Request_20210713DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20171060
Version *
2
Washington Regional Office - (252) 946-6481
Garcy Ward
Pre -Filing Meeting Request submitted 7/13/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Brian Doliber
bcdoliber@ncdot.gov
Passenger Ferry Permanent Dock Installation
NC DOT Ferry Division
Dare
Street Address
159 Lucinda Lane
Address Line 2
City State / Rovince / Region
Powells Point NC
Fbstal / Zip Code Country
27966 USA
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
r Shoreline Stabilization
Does this project have an existing project ID#?*
(' Yes r No
Please list all existing project ID's associated with this projects.*
20171060
Do you know the name of the staff member you would like to request a meeting with?
Garcy Ward
Please give a brief project description below and include location information. *
Temporary floating metal docks are to be replaced with permanent,
wooden docks at the Hatteras and Ocracoke (Silver Lake) ferry
terminals. Permanent docks will require more piles than the
temporary, floating docks did but will remain in approximately the
same footprint. Drawings will be available on 07/23/2021 and will be
included, along with a detailed description, in the permit application.
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Wm, P (j k
Submittal Date 7/13/2021