Loading...
HomeMy WebLinkAbout20171060 Ver 2_Pre-Filing Meeting Request_20210713DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20171060 Version * 2 Washington Regional Office - (252) 946-6481 Garcy Ward Pre -Filing Meeting Request submitted 7/13/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Brian Doliber bcdoliber@ncdot.gov Passenger Ferry Permanent Dock Installation NC DOT Ferry Division Dare Street Address 159 Lucinda Lane Address Line 2 City State / Rovince / Region Powells Point NC Fbstal / Zip Code Country 27966 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification r Shoreline Stabilization Does this project have an existing project ID#?* (' Yes r No Please list all existing project ID's associated with this projects.* 20171060 Do you know the name of the staff member you would like to request a meeting with? Garcy Ward Please give a brief project description below and include location information. * Temporary floating metal docks are to be replaced with permanent, wooden docks at the Hatteras and Ocracoke (Silver Lake) ferry terminals. Permanent docks will require more piles than the temporary, floating docks did but will remain in approximately the same footprint. Drawings will be available on 07/23/2021 and will be included, along with a detailed description, in the permit application. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Wm, P (j k Submittal Date 7/13/2021