Loading...
HomeMy WebLinkAbout660035_Inspection_20210615'fivision of Water Resources Facility Number -E:j� O Division of Soil and Water Conservation Q Other Agency (Type of Visit: JEMom Inspection U Operation Review Q Structure Evaluation U Technical Assistance Reason for Visit: Routine Q Complaint Q Follow-up Q Referral Q Emergency Q Other Q Denied Access Date of Visit: Ik %161 Arrival Time: eparture Time: 1CON Farm Name: roll r m 7 (0 a Io Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Title: Phone: Integrator: Phone: Certified Operator: Certification Number: Back-up Operator: Location of Farm: Latitude: jG44 %6„r� _Ja4�_ ' `y� at S Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer Non -La er Other " 1 - - o n.r Non-L; Pullets Other Poults Design Current Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? Longitude: Region: Design Current Cattle Capacity Pop. a Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non-Dai Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes ZNoo NA ❑ NE []Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) []Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes �No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes j�rNo ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 511212020 Continued I~ acili Number: - Date of Inspection: tog 15', Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ;/TNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Identifier:3�i Structure 5 Structure 6 Spillway?: Designed Freeboard (in): 113 Z 1113Z Observed Freeboard (in): 2 l 1 O 9 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 7nqo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes eNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ,�No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes J:�'No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 2TNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes JE!rNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 0No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure.. Sludge into Bare Soil ❑ Outside of Acceptable Crop Window �" ❑ Evidence of Wind Drift ❑ Applicattiiojn Outside of Appr ved Area 12. Crop Type(s): 0 C' , `17"r 4,&.s t t T-�V M0a- ,, r Inc-�/� ej , 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �eNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Eff"'No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes el ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ,e o ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes RNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [:]Yes [o ❑ NA ❑ NE the appropriate box. TT ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? 1f yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis [:]Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes Z"No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes P?No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facili Number: - Date of Ins ection: i s 1 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes X1, o[] NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑Yes VNo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey [] Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes Xr'qo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes Id i4o ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ZNo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes �No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ZNo ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes 21 No ❑ NA [] NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes OfNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes W�Vo ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). Sa►� ���'� 5_c 2I .ZoZ� �Dc�L ZoZ� vJ -3, �,ttb � � c3 � ZoZ3 �1 Reviewerllnspector Name: Reviewer. -'Inspector Signature: Page 3 of 3 Phone: l [ f� ) r14 7,3 Date: �i l �i 2O2• 511212020