Loading...
HomeMy WebLinkAboutNCC191170_Notice of Termination_20210809 Action History (UTC-05:00) Eastern Time(US&Canada) Submit by Anonymous User 8/9/2021 2:14:12 PM(NOT Submittal) Approve by Morman,Alaina 8/11/2021 3:12:46 PM(NOT Request Review-NCC191170) • The task was assigned to Morman,Alaina.The due date is:August 12,2021 5:00 PM 8/9/2021 2:14 PM " RequestNOT • Construction Stormwater 1 i �a•aThis formto request Notice of • • for •co\erage under • NORTH CAROLINA General - for • i i• Activities Qr�arrry Certificate of NCC191170 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status PAID 2021 Annual Fee Status PAID May be blank(if not yet billed). Information associated with this permit: Project Name Dollar General-Linwood#20827 Address Old Salisbury Road, Salisbury, NC County Davidson Latitude 35.7358 Longitude -80.3768 Permittee Listed Teramore Construction Legally Responsible Zach Crumley Individual NC Reference No. NCG01-2019-1170 E&SC Plan ID David-2019-030 Original NOI 14242 Tracking No. Date COC Issued 7/31/2019 Prior Rescission Cate populates only if COC was already rescinded at time of submittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed-Out Termination of r Sale(Another Owner/Operator obtained a new COC) Coverage* r Mistake or Invalid Coverage r Other Addional IVbre information about the basis of this request,if needed. Explanation Supporting upload Supporting Documentation if applicable. Documentation Mist beRYforrrat Project Close-out Information: Final Close-out 8/5/2021 Inspection Approval Project Close-out Inspection Report 08-05-21 (DAVID-2020-003).pdf 135.56KB Approval Mast be FDFforrrat Documentation North Carolina General Statute 143-215.66(1) provides that: Anyperson who knowinglymakes any false statement,representation,or certification in anyapplication,record,report,plan,or other documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars($10,000). rJ I,as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true,complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary,treasurer,or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV, Section B, Item(6)of that permit. Signature Type Name* Zach Crumley Title* Senior VP Organization* Teramore Construction Date* 08/09/2021 Email for hsimmons@teramore.net Confirmation Contact Telephone* 2295164289 NOT Certification NOT_Linwood.pdf 384.72KB Form Mast be FDF Forrrst Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Errails (Optional) Original Permittee CCd on Wification Bmils Email tglass@teramore.net Original Site Contact CCd on%tificaiton Errails Email tglass@teramore.net I I