Loading...
HomeMy WebLinkAboutNCC191552_NOT Closeout Documents_20210809 Sedimentation/Constructionp' Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington, NC 27889 (252) 946-6481 County: Chowan Project: WESTALBEMARLE SUBSTATION River basin: Pasquotank Person financially responsible:Albemarle Electric Membership Project#: CHOWA-2019-001 Corporation-Kevin P Heath,Supervisor of Engineering Address: 125 Cooperative Way,Hertford,NC 27944 1. Project Location: SUB STATION RD,EDENTON Pictures: No 2. Weather and soil conditions: 90 degrees,sunny,dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No one was on-site. Title: Inspection report: Sent Report Date given/sent: July 23,2021 9. Corrective action needed: None. Permanent ground cover sufficient to restrain erosion has been established. No additional self- monitoring or self-inspections are required. The project is in compliance and released under the SPCA. 10. Comments: The permittee must request termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGO1)via a Notice of Termination(NOT). The NOT is available at https:Hedoes.deq.ne.gov/Forms/NCGO1-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Scott Graboski Others present: Date of inspection: July 22,2021 Time arriving on site: 2:50 PM Time leaving site: 3:00 PM cc: