HomeMy WebLinkAboutNCC191293_NOT Signed Certification_20210809 NCG01 Notice of Termination (NOT) Certification Form
Directions:
Print this form,complete,scan and upload to the electronic NOT(Rescission)form.
Then, mail the original signed form to the NC DEMLR Stormwater Program at:
Division of Energy, Mineral& Land Resources Stormwater Program
512 N.Salisbury Street,61h Floor
1612 Mail Service Center
Raleigh, NC 27699-1612
DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED.
THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL)[40 CFR 122.221
General Permit Certificate of Coverage (COC) No.: NCC191293
Name of Project: Morehead Wildwood-Harlowe 115kV Line Loop into Harlowe Substation
Per NC General Statute 143-215.6E(i), any person who knowingly makes any false statement, representation, or
certification in any application,record, report plan,or other document filed or required to be maintained under this
Article or a rule implementing this Article. ..shall be guilty of a Class 2 misdemeanor which may include a fine not
to exceed ten thousand dollars($10,000).
Under penalty of law, I certify that:
I,as an authorized representative, hereby request rescission of coverage under the NPOES Stormwater Permit for
the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge
and belief,such information is true,complete,and accurate.
Legally Responsible Organizational Entity: Duke Energy Progress, LLC
*Legally Responsible Person: Thomas Williams
Title of Legally Responsible Person: Manager Transmission Engineering
*Signature: Date_
Print Name and?1et5igne (only if authorized individual signing differs from Legally Responsible Person):
Randy Veltri, Director Transmission Permitting
IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the
construction activity,such as a president,secretary, treasurer, or vice president, or a manager that is authorized in
accordance with Part IV,Section B, Item(6)of the NCG010000 permit.
For more information on signatory requirements, see Part IV,Section 8, Item(6)of the NCGO10000 permit.