Loading...
HomeMy WebLinkAboutNCC191293_Notice of Termination_20210809 Action History (UTC-05:00)Eastern Time(US&Canada) Subrrit by Anonymous User 8/9/2021 8:17:07 AM(NOT Submittal) Approve by Morman,Alaina 8/11/2021 2:32:27 PM(NOT Request Review-NCC191293) • The task was assigned to Morman,Alaina.The due date is:August 12,2021 5:00 PM 8/9/2021 8:17 AM " RequestNOT • Construction Stormwater 1 i �a•aThis formto request Notice of • • for •co\erage under • NORTH CAROLINA General - for • i i• Activities Qr�arrry Certificate of NCC191293 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status PAID 2021 Annual Fee Status OPEN May be blank(if not yet billed). Information associated with this permit: Project Name Morehead Wildwood-Harlowe 115kV Line Loop into Harlowe Substation Address NC 101, Harlowe, NC County Carteret Latitude 34.8230 Longitude -76.7319 Permittee Listed Duke Energy Progress, LLC Legally Responsible Thomas Williams Individual NC Reference No. NCG01-2019-1293 E&SC Plan ID CARTE-2020-002 Original NOI 14645 Tracking No. Date COC Issued 8/15/2019 Prior Rescission Cate populates only if COC was already rescinded at time of submittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed-Out Termination of r Sale(Another Owner/Operator obtained a new COC) Coverage* r Mistake or Invalid Coverage r Other Addional IVbre information about the basis of this request,if needed. Explanation Supporting upload Supporting Documentation if applicable. Documentation Mist beRYforrrat Project Close-out Information: Final Close-out 6/10/2021 Inspection Approval Project Close-out Inspection-6.10.21 -Closed.pdf 116.39KB Approval Mist be FDFfornat Documentation North Carolina General Statute 143-215.66(1) provides that: Anyperson who knowinglymakes any false statement,representation,or certification in anyapplication,record,report,plan,or other documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars($10,000). rJ I,as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true,complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary,treasurer,or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV, Section B, Item(6)of that permit. Signature , j(2 tt Type Name* Randy Veltri Title* Director,Transmission Permitting Organization* Duke Energy Progress, LLC Date* 08/09/2021 Email for Randy.Veltri@duke-energy.com Confirmation Contact Telephone* 17045775807 NOT Certification NCG01 Notice of Termination(NOT)Certification Form 380.42KB Form.pdf Mist be FDF Fornat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Errails (Optional) nuwan.wijesuriya@duke-energy.com Original Permittee CCd on Wification Bmils Email Thomas.WilliamsJr@duke-energy.com Original Site Contact CCd on%tificaiton Err ails Email gail.tyner@duke-energy.com I I