Loading...
HomeMy WebLinkAbout20211101 Ver 1_PreFiling 30-Day Clock Reached Email_20210807Strickland, Bev From: laserfiche@ncdenr.gov Sent: Saturday, August 7, 2021 12:03 AM To: mcaman@ncdot.com Cc: Ward, Garcy Subject: Pre -Filing Time Clock has been reached for BP2.R005.1 - 20211101 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for BP2.R005.1 that you submitted on 7/7/2021. The ID number for that project is 20211101, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. For internal use only: Transportation Project 1 DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20211101 Version * 1 Washington Regional Office - (252) 946-6481 Garcy Ward Pre -Filing Meeting Request submitted 7/7/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Michael Aman mcaman@ncdot.com BP2.R005.1 NCDOT Carteret Street Address 1037 W.H Smith Blvd Address Line 2 City State / Rovince / Region Greenville North Carolina Fbstal / Zip Code Country 27835 United States Is this a transportation project?* (' Yes r No Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification r Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information. * Replacement of Bridge No 150057 over Harlowe Creek on Ball Farm Road (1391). Existing conditions consist of a 2-lane bridge in a rural area. Surrounding land use is mostly agricultural with some single family homes. Impacts to the jurisdictional stream and wetlands will result from construction activities required to remove existing endbents and install the proposed bridge. Permanent impacts will result from the granite rip rap bank stabilization being used to lay back the existing vertical endbents with a proposed 1.5:1 slope up to the proposed endbent caps. Temporary impacts will result from the removal of existing bents and placement of the proposed bank stabilization. Please attach the documentation you would like to have the meeting about. BP2. R005.1 _Draft_Permit_Plans. pdf BP2. R005_RedlinePlans.pdf BP2.R005.1 DRAFT_NRTR.pdf pdf only 1.95MB 4.63MB 6.58MB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature 1t%/s »i IJ49 Submittal Date 7/7/2021