HomeMy WebLinkAboutNCS000515_China Grove Draft SWMP_Application Supplement_20210726Draft Stormwater Management Plan
Town of China Grove
NCS000515
XXX XX, 20XX
k:lkb
6 16 6
CHINAGROVE
STORIVIWNTER,
An original town.
Table of Contents
PART 1: INTRODUCTION .........................
1
PART2: CERTIFICATION........................................................................................................................ 2
PART 3: MS4 INFORMATION................................................................................................................. 3
3.1
Permitted MS4 Area.....................................................................................................................
3
3.2
Existing MS4 Mapping.................................................................................................................
3
3.3
Receiving Waters..........................................................................................................................
4
3.4
MS4 Interconnection....................................................................................................................
5
3.5
Total Maximum Daily Loads(TMDLs).......................................................................................
5
3.6
Endangered and Threatened Species and Critical Habitat............................................................
6
3.7
Industrial Facility Discharges.......................................................................................................
6
3.8
Non-Stormwater Discharges........................................................................................................
6
3.9
Target Pollutants and Sources......................................................................................................
7
PART 4: STORMWATER MANAGEMENT PROGRAM ADMINISTRATION ....................................
9
4.1
Organizational Structure...............................................................................................................
9
4.2
Program Funding and Budget.....................................................................................................
11
4.3
Shared Responsibility.................................................................................................................
11
4.4
Co-Permittees.............................................................................................................................
12
4.5
Measurable Goals for Program Administration..........................................................................
12
PART 5: PUBLIC EDUCATION AND OUTREACH PROGRAM.......
..................... 14
PART 6: PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM .......................................... 18
PART 7: ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM ............................. 20
PART 8: CONSTRUCTION SITE RUNOFF CONTROL PROGRAM ................................................... 25
PART 9: POST -CONSTRUCTION SITE RUNOFF CONTROL PROGRAM ....................................... 27
PART 10: POLLUTION PREVENTION AND GOOD HOUSEKEEPING PROGRAMS ..................... 34
List of Tables
Table 1: Summary of MS4 Mapping
Table 2: Summary of MS4 Receiving Waters
Table 3: Summary of Approved TMDLs
Table 4: Summary of Federally Listed Species/Habitat Impacted by Surface Water Quality
Table 5: NPDES Stormwater Permitted Industrial Facilities
Table 6: Non-Stormwater Discharges
Table 7: Summary of Target Pollutants and Sources
Table 8: Summary of Responsible Parties
Table 9: Shared Responsibilities
Table 10: Co-Permittee Contact Information
Table 11: Program Administration BMPs
Table 12: Summary of Target Pollutants & Audiences
Table 13: Public Education and Outreach BMPs
Table 14: Public Involvement and Participation BMPs
Table 15: Illicit Discharge Detection and Elimination BMPs
Table 16: Qualifying Alternative Program Components for Construction Site Runoff Control Program
Table 17: Construction Site Runoff Control BMPs
Table 18: Qualifying Alternative Program(s) for Post -Construction Site Runoff Control Program
Table 19: Summary of Existing Post -Construction Program Elements
Table 20: Post Construction Site Runoff Control BMPs
Table 21: Pollution Prevention and Good Housekeeping BMPs
PART 1: INTRODUCTION
The purpose of this Stormwater Management Plan (SWMP) is to establish and define the means by which
the Town of China Grove will comply with its National Pollutant Discharge Elimination System
(NPDES) Municipal Separate Storm Sewer System (MS4) Permit and the applicable provisions of the
Clean Water Act to meet the federal standard of reducing pollutants in stormwater runoff to the maximum
extent practicable.
This SWMP identifies the specific elements and minimum measures that the Town of China Grove will
develop, implement, enforce, evaluate and report to the North Carolina Department of Environmental
Quality (NCDEQ) Division of Energy, Minerals and Land Resources (DEMLR) in order to comply with
the MS4 Permit number NCS000515, as issued by NCDEQ. This permit covers activities associated with
the discharge of stormwater from the MS4 as owned and operated by the Town of China Grove and
located within the corporate limits of the Town of China Grove.
In preparing this SWMP, the Town of China Grove has evaluated its MS4 and the permit requirements to
develop a comprehensive 5-year SWMP that will meet the community's needs, address local water
quality issues and provide the minimum measures necessary to comply with the permit. The SWMP will
be evaluated and updated annually to ensure that the elements and minimum measures it contains
continue to adequately provide for permit compliance and the community's needs.
Once the SWMP is approved by NCDEQ, all provisions contained and referenced in this SWMP, along
with any approved modifications of the SWMP, are incorporated by reference into the permit and become
enforceable parts of the permit. Any major changes to the approved SWMP will require resubmittal,
review and approval by NCDEQ, and may require a new public comment period depending on the nature
of the changes.
DRAFT NCS000515 SWMP
Town of China Grove
July 21 s`, 2021
Page 1
PART 2: CERTIFICATION
By my signature below I hereby certify, under penalty of law, that this document and all attachments were
prepared under my direction or supervision in accordance with a system designed to assure that qualified
personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
I am aware that there are significant penalties for submitting false information, including the possibility of
fines and imprisonment for knowing violations.
I am also aware that the contents of this document shall become an enforceable part of the NPDES MS4
Permit, and that both the Division and the Environmental Protection Agency have NPDES MS4 Permit
compliance and enforcement authority.
❑ I am a ranking elected official.
❑X I am a principal executive officer for the permitted MS4.
❑ I am a duly authorized representative for the permitted MS4 and have attached the authorization made
in writing by a principal executive officer or ranking elected official which specifies me as (check one):
❑ A specific individual having overall responsibility for stormwater matters.
❑ A specific position having overall responsibility for stormwater matters.
Signature:
t�
Print
Name:
Ken Deal
Title:
Town Manager
Signed this
day
of 20 21
DRAFT NCS000515 SWMP
Town of China Grove
July 21", 2021
Page 2
PART 3: MS4 INFORMATION
3.1 Permitted MS4 Area
This SWMP applies throughout the corporate limits of the Town of China Grove, including all regulated
activities associated with the discharge of stormwater from the MS4. The map below shows the corporate
limits of Town of China Grove as of the date of this document.
3.2 Existing MS4 Mapping
Storm drainage within the Town of China Grove consists of a network of pipes, ditches and open
channels, which were installed at different times by many different entities. The flow of storm water
travels through both public and privately maintained areas, and the level of improvements installed are the
option of the property owner. The overall drainage area is relatively small and is served by three major
creeks and numerous tributary streams. Therefore, the typical drainage path from overland flow to the
outfall is short.
The Town recently inventoried the conveyance system and prepared detailed maps of the entire system
within the Town's municipal boundary limits.
Existing stormwater piping: +24,000 feet of 8" to 48" diameter piping Stormwater inlets: +276 inlets
Outfalls or discharge points: +60 (size from 12" to 60" diameter)
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 3
Figure 3 of Appendix A is a location map of all inventoried outfalls within the Town's municipal
boundaries. Appendix M includes detailed system maps showing the location of all inlets, piping and
outfalls.
Table 1: Summary of Current MS4 Mapping
Percent of MS4 Area Mapped
100
%
No. of Major Outfalls* Mapped
Unknown**
total
*An out/all is a point where the MS4 discharges from a pipe or other conveyance (e.g. a ditch) directly
into surface waters. Major outfalls are required to be mapped to meet permit requirements. A major
out/all is a .36-inch diameter pipe or discharge from a drainage area >`50-acres; and for industrial zoned
areas a 12-inch diameter pipe or a drainage area > 2-acres.
*Outfalls have been mapped but the classification of the specific outfalls as major outfalls has not
occurred, therefore the number of major outfalls is unknown at this time (See BMP No. 16).
3.3 Receiving Waters
The tributary streams are listed in the order in which they occur beginning at the most downstream point
of the named Creek within the program area and proceeding upstream. The direction of flow of Grants
Creek and Town Creek is from south to north. Cold Water Creek flows from the north to the south. The
"E" and "W" designations indicate that the tributary is located to either the east or the west side of the
main creek. The numerical designation indicates the order of occurrence from the most far point in the
program area downstream to most upstream point in the program area. Figure 2 in Appendix A illustrates
the receiving streams in the program area.
Major Receiving
Stream Index
Water Quality
Use Support
Water Quality
Stream Name
Classification
Rating
Issues
Grants Creek
12-110
C
O
Fecal Coliform,
Turbidity,
Sediment
Town Creek
12-112-3
C
O
DO, Turbidity
Cold Water Creek
13-17-9-4 .05
WS-IV
O
Fecal Coliform
Cold Water Creek — Beginning north of intersection SR 1243 and 1-85 and ending north of NC 152
and south of intersection of 1-85 and 29/601.
• Unnamed Tributary W-1 Cold Water Creek
• Unnamed Tributary W-2 Cold Water Creek
• Unnamed Tributary W-3 Cold Water Creek at SR 1232
• Unnamed Tributary E-1 Cold Water Creek at SR 1339
• Unnamed Tributary W-4 Cold Water Creek Unnamed Tributary W-5 Cold Water Creek at SR 1337
• Unnamed Tributary E-2 Cold Water Creek at SR 1337
• Unnamed Tributary E-3 Cold Water Creek at NC 152
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 4
Grants Creek — Beginning southwest of SR1505 and ending at SR1211
• Unnamed Tributary E-1 to Grants Creek
o Unnamed Tributary E-1 A
• Unnamed Tributary E 2 to Grants Creek
o Unnamed Tributary E-2A
• Unnamed Tributary E-3 to Grants Creek
• Unnamed Tributary W-1 to Grants Creek
o Unnamed Tributary W-lA
• Unnamed Tributary W-2 to Grants Creek
• Unnamed Tributary W-3 to Grants Creek
• Unnamed Tributary E-4 to Grants Creek at SR 1225
• Unnamed Tributary W-4 to Grants Creek
• Unnamed Tributary E-5 to Grants Creek
• Unnamed Tributary W-5 to Grants Creek
• Unnamed Tributary E-6 to Grants Creek
Town Creek — Beginning at headwaters east of SR 2553 and ending at intersection SR 1505 and 1-85.
No tributary streams are included in the program area.
3.4 MS4 Interconnection
The Town of China Grove MS4 is not interconnected with another regulated MS4 and directly discharges
to the receiving waters as listed in Table 2 above. The MS4 does not interconnect with the statewide
NCDOT TS4 and includes:
a. The interconnection is not receiving stormwater from the NCDOT TS4. The number of
interconnections is unknown. Quantity: N/A
b. The interconnection is not discharging stormwater into the NCDOT TS4. The number of
interconnections is unknown. Quantity: N/A
c. The Town of China Grove MS4 mapping does/does not identify interconnections with the
NCDOT TS4.
d. The Town of China Grove MS4 mapping does not include NCDOT TS4 outfalls.
3.5 Total Maximum Daily Loads (TMDLs)
The USEPA developed an approach called total maximum daily loads (TMDL) for determining the total
waste (pollutant) loading from point and nonpoint sources that a stream or other water body can
assimilate and maintain its designated uses. With the TMDL approach streams, which do not meet water
quality standards, are identified and the State establishes priorities for actions needed to meet water
quality goals. The TMDL(s) listed in Table 3 below have been approved within the MS4 area, as
determined by the map and list provided on the NCDEQ Modeling & Assessment Unit web page. The
table also indicates whether the approved TMDL has a specific stormwater Waste Load Allocation
(WLA) for any watershed directly receiving discharges from the permitted MS4, and whether a Water
Quality Recovery Program has been implemented to address the WLA.
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 5
Water Body Name
TMDL Pollutant(s)
Stormwater Waste
Water Quality
Load Allocation (Y/N)
Recovery Program
Y/N)
Statewide
Mercury
N
N
Grants Creek
Fecal Coliform,
Turbidity
The Statewide TMDL for mercury does not require any actions by the NPDES stormwater permittees
because most mercury in stormwater comes from atmospheric deposition.
3.6 Endangered and Threatened Species and Critical Habitat
Significant populations of threatened or endangered species and/or critical habitat are identified within the
regulated MS4 urbanized area, Based upon a review of the Endangered and Threatened Species and
Species of Concern by County for North Carolina Map and Listed species believe to or known to occur in
North Carolina map as provided by the U.S. Fish and Wildlife Service, the species listed in Table 4 have
the potential to occur within the regulated MS4 urbanized area. Of those species listed, Table 4
summarizes the species that may be significantly impacted by the quality of surface waters within their
habitat.
Table 4: Potential Federally Listed Species/Habitat Impacted by Surface Water Quality
Scientific Name
Common name
Species Group
Federal Listing
Status
Haliaeetus leucoce halus
Bald Eagle
Vertebrate
BGPA*
Myotis septentrionalis
Northern long-eared
Vertebrate
Threatened
bat
Helianthus schweinitzii
Schweinitz's
Vascular Plant
Endangered
sunflower
*BGPA- Bald Eagle Protection Act
3.7 Industrial Facility Discharges
The Town of China Grove MS4 jurisdictional area includes the following industrial facilities which hold
NPDES Industrial Stormwater Permits, as determined from the NCDEO Maps & Permit Data web page.
Table 5: NPDES Stormwater Permitted Industrial Facilities
Permit Number Facility Name
NCG070057 Hitachi Metals North Carolina
NCG080909 R&L Carriers
3.8 Non-Stormwater Discharges
The water quality impacts of non-stormwater discharges have been evaluated by the Town of China
Grove as summarized in Table 6 below. The unpermitted non-stormwater flows listed as incidental do
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 6
not significantly impact water quality. The Town of China Grove has evaluated residential and charity
car washing and street washing for possible significant water quality impacts. Street washing discharges
are addressed under the Pavement Management Program in Part 10 of this SWMP.
The Division has not required that other non-stormwater flows be specifically controlled by the Town of
China Grove. Wash water associated with car washing that does not contain detergents or does not
discharge directly into the MS4 is considered incidental. However, these types of non-stormwater
discharges that do contain detergents have been evaluated by the Town of China Grove to determine
whether they may significantly impact water quality.
Table 6: Non-Stormwater Discharges
Non-Stormwater Discharge
Water Quality" Impacts
Water line and fire hydrant flushing
Incidental
Landscape irrigation
Incidental
Diverted stream flows
Incidental
Rising groundwater
Incidental
Uncontaminated groundwater infiltration
Incidental
Uncontaminated pumped groundwater
Incidental
Uncontaminated potable water sources
Incidental
Foundation drains
Incidental
Air conditioning condensate
Incidental
Irrigation waters
Incidental
Springs
Incidental
Water from crawls ace pumps
Incidental
Footing drains
Incidental
Lawn watering
Incidental
Residential and charity car washing
Possible
Flows from riparian habitats and wetlands
Incidental
Dechlorinated swimming pool discharges
Incidental
Street wash water
N/A
Flows from firefighting activities
Incidental
3.9 Target Pollutants and Sources
In addition to those target pollutants identified above, the Town of China Grove is not aware of other
significant water quality issues within the permitted MS4 area.
Table 7 below summarizes the water quality pollutants identified throughout Part 3 of this SWMP, the
likely activities/sources/targeted audiences attributed to each pollutant, and identifies the associated
SWMP program(s) that address each. In addition, the Town of China Grove has evaluated schools,
homeowners and businesses as target audiences that are likely to have significant stormwater impacts.
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 7
Table 7: Summary of Target Pollutants and Sources
Target
Pollutants/Sources
Target Audience(s)
Education Programs
General Non -point
General Public,
Website, Mailed Information, Social
source pollution
Businesses, Municipal
Media, Posters
Employees
Used Motor Oil
General Public,
Website, Mailed Information
Businesses, Municipal
Employees
Kitchen Fats, Oils, and
Restaurants, Grocery
Website, Mailed Information, Posters,
Grease, Dumpstcr leaks
Stores, Commercial
Inspections
Businesses, Municipal
Employees, General
Pubic
Yard Waste and
General Public,
Website, Mailed Information, Posters,
Fertilizer
Businesses, Municipal
Inspections
Employees
Illicit Discharges
General Public,
Website, Mailed Information, Posters,
Businesses, Municipal
Inspections
Employees
Illegal Dumping
General Public,
Website, Mailed Information, Posters,
Businesses, Municipal
Inspections
Employees
Improper Disposal of
General Public,
Website, Mailed Information, Posters,
Waste, Litter
Businesses, Municipal
Inspections
Employees
Sediment
Construction Sector
Construction Site Run-off Control
Mercury/Statewide
Atmospheric
Public Education and Outreach (fish
TMDL
Disposition
consumption advisory)
Nutrients, Fecal
Public Education & Outreach, Illicit
Coliform
Sewer overflows,
Discharge Detection & Elimination,
failing septic systems,
Construction Site Runoff Control, Post
urbanization
Construction Site Runoff Control,
Pollution Prevention & Good
Housekeeping
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 8
PART 4: STORMWATER MANAGEMENT PROGRAM ADMINISTRATION
4.1 Organizational Structure
The Assistant Town Manager is responsible for the administration of the Stormwater Management
Program.
Town of China Grove Organizational Chart
Town Attorney
Citizens of China Grove
Town Council
Town Manager
I
Asst. Town
Manager
i
i
j
Planning &
Development
Town Clerk
Parks &
Recreation
DRAFT NCS000515 SWMP
Town of China Grove
July 2151, 2021
Page 9
Table 8: Summary of Responsible Parties
SWMP Component
Responsible Position
Staff Name
Department
Stormwater Program
Assistant Town
Franklin Gover
Administration
Administration
Manager
SWMP Management
Assistant Town
Franklin Gover
Administration
Manager
Public Education &
Assistant Town
Franklin Gover
Administration
Outreach
Manager
Public Involvement &
Assistant Town
Franklin Gover
Administration
Participation
Manager
Illicit Discharge
Assistant Town
Franklin Gover
Administration
Detection &
Manager
Elimination
Construction Site
Rowan County
Joshua Canup
Rowan County Planning
Runoff Control
Sediment and Erosion
and Development
Control
Post -Construction
Assistant Town
Franklin Gover
Administration
Stormwater
Manager
Management
Pollution
Assistant Town
Franklin Gover, David
Administration, Public
Prevention/Good
Manager, Public Works
Ketner
Works
Housekeeping for
Director
Municipal Operations
Municipal Facilities
Assistant Town
Franklin Gover
Administration
Operation &
Manager
Maintenance Program
Spill Response Program
Assistant Town
Franklin Gover
Administration
Manager
MS4 Operation &
Assistant Town
Franklin Gover
Administration
Maintenance Program
Manager
Municipal SCM
Assistant Town
Franklin Gover
Administration
Operation &
Manager
Maintenance Program
Pesticide, Herbicide &
Public Works Director
David Ketner
Public Works
Fertilizer Management
Program
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 10
Vehicle & Equipment
Cleaning Program
Assistant Town
Manager
Franklin Gover
Administration
Pavement Management
Public Works Director
David Ketner
Public Works
Program
Total Maximum Daily
N/A
Load (TMDL)
Requirements
4.2 Program Funding and Budget
In accordance with the issued permit, the Town of China Grove shall maintain adequate funding and
staffing to implement and manage the provisions of the SWMP and comply with the requirements of the
NPDES MS4 Permit. The budget includes the permit administering and compliance fee, which is billed
by the Division annually. The stormwater program currently receives funding of approximately $5,000
per year; this is funded through general funds. The Assistant Town Manager position is funded through
the general fund. The program is currently under -funded to conduct all the proactive elements of the
permit. Further fiscal analysis and investigation of funding options (such as additional general fiend
allocation or a stormwater fee) will be conducted as indicated in BMP No. 3 in order to fully fund the
program by Permit year three.
4.3 Shared Responsibility
The Town of China Grove will share the responsibility to implement the following minimum control
measures, which are at least as stringent as the corresponding NPDES MS4 Permit requirement. The
Town of China Grove remains responsible for compliance if the other entity fails to perform the permit
obligation, and may be subject to enforcement action if neither the Town of China Grove nor the other
entity fully performs the permit obligation. Table 9 below summarizes who will be implementing the
component, what the component program is called, the specific SWMP BMP or permit requirement that
is being met by the shared responsibility, and whether or not a legal agreement to share responsibility is in
place.
SWMP BMP or
Legal
Permit Requirement
Implementing Entity & Program Name
Agreement
Y/N
Public Outreach
Regional Stormwater Partnership of the Carolinas
Y
Construction Runoff
Rowan County Sediment and Erosion Control
Y
Post Construction
McGill and Associates
Y
Runoff Plan Review
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 11
4.4 Co-Permittees
There are no other entities applying for co-permittee status under the NPDES MS4 permits number
NCS000515 for the Town of China Grove. Table 10 summarizes contact information for each co-
permittee.
Table 10: Co-Permittee Contact Information
Co-Permittee MS4
Name
Contact Person
Phone & E-Mail
Interlocal
Agreement
(Y/N)
N/A
N/A
N/A
4.5 Measurable Goals for Program Administration
China Grove will manage and report the following Best Management Practices (BMPs) for the
administration of the Stormwater Management Program.
Table 11: Program Administration BMPs
Permit
2.1.2 and Part 4: Annual Self -Assessment
Ref.
Measures to evaluate the performance and effectiveness of the SWMP program components at least annually.
Results shall be used by the permittee to modify the program components as necessary to accomplish the intent
of the Stormwater Program. The self -assessment reporting eriod is the fiscal year Jul 1 — June 30 .
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting
Implementation
Metric
1.
Annual Self -Assessment
Perform an annual evaluation of
1. Prepare, certify and
1. Annually for permit
1. Yes/No
SWMP implementation, suitability of
submit the Annual Self-
years 1-4
SWMP commitments and any
Assessment to NCDEQ
proposed changes to the SWMP
prior to August 31 each
utilizing the NCDEQ Annual Self-
year.
Assessment Template.
Permit
1.6: Permit Renewal Application
Ref.
Measures to submit a permit renewal application no later than 180 days prior to the expiration date of the
NPDES MS4 permit.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting
Implementation
Metric
2.
Permit Renewal Application
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 12
Table 11: Program Administration BMPs
Audit stormwater program
1. Participate in an
1 Permit Year 5
1. Yes/No
implementation for compliance with
NPDES MS4 Permit
the permit and approved SWMP, and
Compliance Audit, as
utilize the results to prepare and
scheduled and performed
submit a permit renewal application
by EPA or NCDEQ.
package.
2. Self -audit and
2.Permit Year 5
2. Yes/No/Partial
document any
stormwater program
components not audited
by EPA or NCDEQ
utilizing the DEQ Audit
Template. Submit Self -
Audit to DEMLR
(required component of
permit renewal
application package).
3. Certify the stormwater
3. Permit Year 5
3. Date of permit renewal
permit renewal
application submittal
application (Permit
renewal application
form, Self -Audit, and
Draft SWMP for the next
5-year permit cycle) and
submit to NCDEQ at
least 180 days prior to
permit expiration.
Permit
2.1.1: Adequate Funding and Staffing
Ref.
The permittee shall maintain adequate funding and staffing to implement and manage the provisions of the SWMP and
meet all requirements of this permit.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Im lementation
Annual Reporting
Metric
3.
Adequate Funding
Perform a fiscal analysis and explore
1. Complete a fiscal gap
1. Permit Year 1
1. Yes/No/Partial, Report
options to obtain adequate program
analysis
monetary value gap
funding to fully fund the stormwater
2. Determine available
2. Permit Year 1
2.Yes/No/Partial
program and meet all requirements of
funding mechanisms and
the permit. Select and implement a
evaluate options
finding strategy for the Phase II
3. Sect a finding
3. Permit year 1-2
3. Yes/NO/Partial, Report
Stormwater Program.
mechanism
selected mechanism
4. Implement Funding
4. Permit Year 2-5
4. Yes/No/Partial, Report
Mechanism
I
I Implementation status
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 13
PART 5: PUBLIC EDUCATION AND OUTREACH PROGRAM
The Town of China Grove implements a Public Education and Outreach Program to distribute educational
materials to the conununity or conduct equivalent outreach activities about the impacts of storm water
discharges on water bodies and steps the public can take to reduce pollutants in storm water runoff.
The target audiences and identified pollutants listed in Part 3.9 of this SWMP, which will be addressed by
the Public Education and Outreach Program, are summarized in Table 12 below. In addition, China
Grove is required to inform businesses and the general public of the hazards associated with illicit
discharges, illegal dumping and improper disposal of waste.
Table 12: Summary of Target Pollutants & Audiences
Target Pollutants/Sources
Target Audience(s)
Household Chemicals
General Public, Businesses, Municipal Employees
Used Motor Oil
General Public, Businesses, Municipal Employees
Litter
Restaurants, Grocery Stores, Commercial Businesses, Municipal
Employees, General Public
Kitchen Fats, Oils, and Grease
Restaurants, Grocery Stores, Commercial Businesses, Municipal
Employees, General Public
Dumpster leaks
Restaurants, Grocery Stores, Commercial Businesses, Municipal
Employees, General Public
Yard Waste and Fertilizer
General Public, Businesses, Municipal Employees
Illicit Dischar es
General Public, Businesses, Municipal Employees
Illegal Dumping
General Public, Businesses, Municipal Employees
Improper Disposal of Waste
General Public, Businesses, Municipal Employees
Sediment and Waste Management
Construction Sector
The Town of China Grove will manage, implement and report the following public education and
outreach BMPs.
Table 13: Public Education and Outreach BMPs
Permit
3.2.2 and 3.2.4: Outreach to Targeted Audiences
Ref.
Measures to identify the specific elements and implementation of a Public Education and Outreach Program to
share educational materials to the community or conduct equivalent outreach activities about the impacts of
stormwater discharges on water bodies and how the public can reduce pollutants in stormwater runoff. The
permittee shall provide educational information to identified target audiences on pollutants/sources identified in
table 12 above, and shall document the extent of exposure of each media, event or activity, including those
elements implemented locally or throu` h a cooperative agree ent.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting
Implementation
Metric
4.
Distribute public education materials to identified target audience and user groups
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 14
Table 13: Public Education and Outreach BMPs
Distribute stormwater educational
1. Review and update
1. Permit Year 1
1. Yes/No/Partial
materials to appropriate target groups
Table 12 maintaining a
which include hotline contact
description of the target
information to report pollution. We
pollutants and/or
may also use Public Education &
stressors and likely
Outreach materials supplied by the
sources. Maintain a
state when available.
description of the target
audiences likely to have
significant stormwater
impacts and why they
were selected.
2. Develop brochures,
2. Permit Year 1
2. Yes/No/Partial
handouts, and flyers for
residential, and industry
specific uses identified as
target audiences in Table
12 and one general
stormwater awareness
brochure for all
audiences.
3. Distribute brochures to
3. Continuously Permit
3. Yes/No/Partial; report
target audiences, a
Years 2-5
number of educational
minimum of one specific
items distributed
audience each year.
Distribute the general
stormwater awareness
brochure.
4. Display flyers for
4. Continuously Permit
4. Yes/No/Partial; Report
illicit discharge, illegal
Years 2-5
number of materials
dumping, and general
distributed
awareness at Town Hall
kiosk
5. Attend all town events
5. Continuously Permit
5. Yes/No/Partial; Report
with booth and SW trick
Years 2-5
how many events?
6. Provide handouts,
6. Continuously Permit
6. Yes/No/Partial; Report
coloring books, activity
Years 2-5
how many
books, and prizes at all
promotional/educational
town events.
items are given out
7. Evaluate educational
7. Annually Permit Years
7. Yes/No/Partial
materials
2-5
1 Materials updated?
Permit
21.7, 3.2.3 and 3.6.5(c): Web Site
Ref.
Measures to provide a web site designed to convey the program's message(s) and provide online materials
including ordinances, or other regulatory mechanisms, or a list identifying the ordinances or other regulatory
mechanisms, providing the legal authority necessary to implement and enforce the requirements of the permit
and SWMP. The web page shall also provide developers with all relevant post -construction requirements,
desi standards, checklists and/or other materials.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Implementation
Annual Reporting
Metric
DRAFT NCS000515 SWMP
Town of China Grove
July 21", 2021
Page 15
Table 13: Public Education and Outreach BMPs
5.
Town Stormwater Website
The China Grove web page will
1. Establish and maintain
1. Permit Year 1
1. Yes/No/Partial
provide information on the town's
Town Stormwater web
stormwater program, including the
permit, SWMP, applicable
page with up to date
information
ordinances, and annual reports. The
2.Include information on
2. Permit Year 1
2. Yes/No/Partial
web page will also include a
program
stormwater issue reporting
3. Include information
3. Permit Year 1
3. Yes/No/Partial
mechanism, educational materials
for developers
developed by the town, and links to
4. Monitor website
4. Annually beginning
4. How many visits?
additional stormwater educational
traffic
Permit Year 1
resources. The web page will also
serve to advertise the stormwater
hotline, and opportunities for
involvement.
5. Evaluate website
5. Annually beginning
5. Yes/No/Partial;
Permit Year 1
Permit
3.2.5: Stormwater Hotline
Ref. ''
Measures for a stormwater hotline/helpline' for the purpose of public education and outreach.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Implementation
Annual Reporting
Metric
6.
Stormwater Hotline
Establish a stormwater hotline line
1. Establish Hotline and
1. Permit Year 1
1. Yes/No/Partial
for the purpose of public outreach
email for public use
and education
2. Establish specific staff
2. Permit Year 1
2. Yes/No/Status
member who will serve
as stormwater education
and hotline contact
3.Publicize contact
3. Continuously
3. Yes/No/Partial
information on the town
beginning Permit Year 1
Document & report a
website
summary of the number
of inquiries received,
general type of inquiry,
and the contact
mechanism used
4.Employee training -
4. Annually beginning
4. Yes/No/Status;
stormwater education
Permit Year 1
number trained
and hotline contact in
general stormwater
awareness, complaint
call protocols and
appropriate contacts for
referral of stormwater
issues
DRAFT NCS000515 SWMP
Town of China Grove
July 21', 2021
Page 16
Table 13: Public Education and Outreach BMPs
7.
Implement Media Program
Traditional and Social Media
1. TV Ads
1. Annually beginning
1.Yes/No/Status Number
Campaign with Staff and Regional
Permit Year 1
of viewers
2. Radio Ads
2. Annually beginning
2. Yes/No/Status
Stormwater Partnership of the
Carolinas.
Permit Year 1
Number of Ads
3. Website
3. Annually beginning
3. See BMP 5
Permit Year 1
4. Promote the RSPC
4. Annually beginning
4. Yes/No/Status
Website
Permit Year 1
5. Social Media - The
Annually beginning
5. Yes/No/Status;
town's existing
Permit Year 1
Document Number of
Facebook account will be
Posts
used to reach the
residential target
audience and share
information related to
stormwater issues
DRAFT NCS000515 SWMP
Town of China Grove
July 21', 2021
Page 17
PART 6: PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM
This SWMP identifies the minimum elements and implementation of a Public Involvement and
Participation Program that complies with applicable State, Tribal and local public notice requirements.
The Town of China Grove will manage, implement and report the following public involvement and
participation BMPs.
Table 14: Public Involvement and Participation BMPs
Permit
3.3.1: Public Input
Ref.
Mechanisms for public involvement that provide for input on stormwater issues and the stormwater program.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting
Implementation
Metric
8.
Stormwater Public Input Email
Establish a Stormwater Email
1. Establish an email for
1. Permit Year 1
1. See BMP 6
stormwater input
2. Promote on all
2. Permit Year 1
2. See BMP 6
educational materials
3. Maintained by
3.Permit Year 1
3. See BMP 6
Stormwater
Administrator
4.
4.
4.
5.
5.
5.
9.
Hotline/Help Line
The Town promotes its phone
1. See BMP No. 6
1. See BMP No. 6
1. See BMP No. 6
number a hotline for public
2.
2.
2.
involvement
3.
3.
3.
10.
Town Stormwater Webpage
The web page will provide links to
1. See BMP No. 5
1. See BMP No. 5
1. See BMP No. 5
information on the City's Stormwater
2.
2.
2.
program, including the permit,
SWMP, applicable ordinances, and
annual reports.
Permit
3.3.2: Volunteer Opportunities
Ref.
Measures to provide volunteer opportunities designed to promote ongoing citizen participation.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting
Implementation
Metric
I1.
Drain Marking Volunteer Program
DRAFT NCS000515 SWMP
Town of China Grove
July 21', 2021
Page 18
Table 14: Public Involvement and Participation BMPs
Volunteer program aimed at Boy
1. Partner with local
1. Permit Years 1-5
1. Yes/No/Status; Report
Scouts, or youth organization, to
organizations to
number of events and
mark and inspect catch basins,
complete drain marking
participants
limited opportunity
programs
2.Mark and inspect
2. Permit Years 1-5
2. Yes/No/Status; Report
drains
Number of Inlets
Marked,
12.
Social Media Programs
Volunteer program for residents to
1. Start social media
1. Permit Year 1
1. Yes/No/Status,
report stream conditions, pollution,
marketing for stormwater
Document Social Media
wildlife, and activities near creeks
Campaigns
-program
2. Develop Social Media
2. Permit year 2
2. Yes/No/Status,
and streams.
materials for new stream
Document new
monitoring program
advertisements and
materials
3. Implement new
3. Permit year 3
3. Yes/No/Status,
monitoring program
Document Program
Participants
4. Evaluate Program
4. Annually, Permit Year
4. Yes/No/Status Report
3-5
Program achievements
13
Curb Clean Up Weekend
A town wide effort to clean curbs and
1. Develop bi-annual
1. Bi-annually, beginning
1. Yes/No/Status;
curb lines. Residents can document
curb clean-up program
Permit Year 1
Report program policy
their efforts through social media tags
and details
2. Implement the
2. Bi-annually, Permit
2. Yes/No/Status; Report
such as #cleanupgrantscreek
program
Years 2-5
Program Implementation
Status
3. Social media post with
3. Annually, Permit Year
3. Yes/No/Status; Report
event highlights
2-5
Participation Numbers
4. Evaluate Program
4. Annually, Permit Year
4. Yes/No/Status Report
2-5
program achievements
DRAFT NCS000515 SWMP
Town of China Grove
July 21", 2021
Page 19
PART 7: ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM
The Town of China Grove will develop, manage, implement, document, report and enforce an Illicit
Discharge Detection and Elimination Program which shall, at a minimum, include the following illicit
discharge detection and elimination BMPs.
Table 15: Illicit Discharge Detection and Elimination BMPs
Permit
3.4.1: ` MS4 Map
Ref.
Measures to develop, update and maintain a municipal storm sewer system map including stormwater
conveyances, flow direction, major outfalls and waters of the United States receiving stormwater discharges.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting
Implementation
Metric
14.
Maintain Storm Sewer System Base Map of Major Outfalls
The MS4 map will be completed
1. Add a layer
1. Permit Year 1
1. Yes/No/Partial; Report
through GIS analysis of existing data.
identifying major outfalls
number of major outfalls
Major outfalls will be identified and
to the map and number
identified
numbered, and flow directions and
2. Add flow directions to
2. Permit Year 2
2. Yes/No/Status; Report
receiving waters will be added.
the map
map updates
3. Highlight receiving
3. Permit Year 2
3. Yes/No/Status; Update
waters
ma
15.
Continual Updates to MS4 Map
The MS4 map will be continuously
1. When new
1. Continuously
1. Yes/No/Status; Report
updated for completeness.
conveyances and outfalls
Number of Outfalls
are located or
Added
constructed add them to
the ma
Permit
3.4.2: Regulatory Mechanism
Ref.
Measures to provide an IDDE ordinance or other regulatory mechanism that provides legal authority to
prohibit, detect, and eliminate illicit connections and discharges, illegal dumping and spills into the MS4,
includin enforcement procedures and actions.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting
Implementation
Metric
16.
Maintain Adequate Legal Authorities
Review annually the IDDE
1. Review ordinance and
1. Permit years 1-5
1.Yes/No/Partial; Report
ordinances or other regulatory
update if revision is
if a revision is required
mechanisms, or adopt any new
required to maintain
and if a revision is made
ordinances or other regulatory
legal authority
mechanisms that provide the Town of
2.
2.
2.
China Grove with adequate legal
authority to prohibit illicit
connections and discharges and
enforce the approved IDDE Program.
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 20
Table 15: Illicit Discharge Detection and Elimination BMPs
17.
Enforcement
Implement a mechanism to track the
1. Implemented IWORQ
1. Permit Year 1
1. Yes/No/Status; Annual
issuance of notices of violation and
software to issue and
IWORQ reporting
enforcement actions as administered
track violations
by the town. This will include the
2. Code Enforcement
2. Permit Year 2-5
2. Yes/No/Status, Report
ability to identify chronic violators
Officer & Stormwater
Number of Violations
for initiation of actions to reduce
Administrator issue
issued
noncompliance.
violations
3.
3.
3.
Permit
3.4.3: "IDDE Plan
Ref.
Measures to maintain and implement a written IDDE Plan to detect and address illicit discharges, illegal
dumping and any non-stormwater discharges identified as significant contributors of pollutants to the MS4.
The plan shall provide standard procedures and documentation to:
a) Locate priority areas likely to have illicit discharges,
b) Conduct routine dry weather outfall inspections,
c) Identify illicit discharges and trace sources,
d) Eliminate the source(s) of an illicit discharge, and
e) Evaluate and assess the IDDE Program.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Implementation
Annual Reporting
- Metric
18.
Observe Dry Weather Flows
Maintain a program for conducting
1. Develop a written
1. Permit Year 1
1. Yes/No/Partial; Policy
dry weather flow field observations
IDDE Program
Adopted
in accordance with a written
2. Submit IDDE Program
2. Permit Year 1
2. Yes/No/Partial; Report
procedure for detecting and removing
for NCDEQ review and
Date Submitted to
the sources of illicit discharges
Approval
NCDEQ
3. Train Staff to perform
3. Permit Years 2-5
3. Yes/No/Partial;
dry weather flow
Number of staff trained
inspections and all field
staff that may encounter
illicit discharges
4. Implement written
4. Permit Years 2-5
4. Yes/No/Status
IDDE Program
5. Perform dry weather
5. Annually beginning
5. Yes/No/Partial;
major outfall inspections
permit year 2
Number of inspections
completed
19.
Investigate sources of identified illicit discharges
Develop and maintain a standard
1. Implement illicit
1. Permit Years 2-5
1. Yes/No/Status;
operating procedure (SOP) for
discharge investigation
investigation of potential illicit
SOP portion of IDDE
Program
DRAFT NCS000515 SWMP
Town of China Grove
July 21', 2021
Page 21
Table 15: Illicit Discharge Detection and Elimination BMPs
discharges, illicit connections, and
2. Investigate reported
2. Permit Years 2-5
2. Yes/No/Status; Report
illegal dumping.
illicit discharges
the member of
found/reported,
investigated, confirmed
as illicit discharge and
resolved/eliminated
20
IDDE Program Evaluation
Evaluate and assess the Town of
1. Review the annual
1. Permit Years 2-5
1. Yes/No/Status
China Grove IDDE Program.
results of dry weather
flow observations and
NOVs issued
2. Document any
2. Permit Years 2-5
2. Yes/No/Status
pollutant trends
3. Revise program SOP
3. Annually, Beginning
3. Yes/No/Status
to address trends and
permit year 2
concerns
4. Focus outreach on
4. Annually, Beginning
4. Yes/No/Status
identified trends
permit year 2
Permit
3.4.4: ' IDDE Tracking
Ref.
Measures for tracking and documenting the date(s) an illicit discharge, illicit connection or illegal dumping was
observed, the results of the investigation, any follow-up of the investigation, the date the investigation was
closed, the issuance of enforcement actions, and the ability to identify chronic violators.
ABMP
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Implementation
Annual Reporting
Metric
21.
Track and document investigations of illicit discharges
China Grove will track all
1. Develop procedures
1. Permit Year 1
1. Yes/No/Status
investigations and document the date
for inspections in the
the illicit discharge was observed; the
IDDE Program
results of the investigation; any
2. Develop an inspection
2. Permit Year 1
2. Yes/No/Status
follow-up of the investigation; and
template for iWorq
the date the investigation was closed.
software to track cases
3. Identify case trends to
3. Permit Years 2-5
3.Yes/No/Status;
help guide education
Report Trends
Permit
3.4.5: Staff IDDE Training
Ref.
Measures to provide training for municipal staff and contractors who, as part of their normal job
responsibilities, may observe an illicit discharge, illicit connection, illegal dumping or spills. Training shall
include how to identify and report illicit discharges, illicit connections, illegal dumping and spills. Each staff
trainingevent shall be documented, including the agenda/materials, date, and number of staff participating.
,A
B
C
D
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 22
Table 15: Illicit Discharge Detection and Elimination BMPs
BMP
No.
Description of BMP
Measurable Goal(s)
Schedule for
Implement tion
Annual Reporting
Metric
22.
Employee Training
Develop a program to educate town
1. Develop staff training
1. Permit Year 1
1. Yes/No/Partial
staff of indicators of potential illicit
program for all
discharges/connections and illegal
employees
dumping and the appropriate avenues
2. Train all staff to
2. Permit Year 2
2. See BMP 18
through which to report suspected
recognize and report an
illicit discharge. (See BMP No. 20 for
illicit discharge
SOPS by which to train staff)
3. Train new staff that
3. Annually, beginning
3. Yes/No/Partial; Report
will be part of the IDDE
in permit year 3
topics, training date, and
program
number of attendees
4.
4.
4.
23.
Provide Public Education
Inform employees, businesses, and
1. Create seasonal IDDE
1. Permit Year 1
1. See BMPs 8-10
the general public of hazards
flyers for municipal
associated with illegal discharges and
facilities, website
2. Display IDDE flyer at
2. Permit Year 1
2.See BMPs 8-10
improper disposal of waste
municipal facilities,
website
3. Distribute Illicit
3. Permit Year 1
3. See BMPs 8-10
Discharge Brochure to
residents
Permit
3.4.6: IDDE Reporting
Ref.
Measures for the public and staff to report illicit discharges, illegal dumping and spills. The mechanism shall be
publicized to facilitate reporting and shall be managed to provide rapid response by appropriately trained
Personnel.
BMP
A
B '
C
D
No. `
Description of BMP
Measurable Goals)
Schedule for
Implementation
Annual Reporting
Metric
24.
Stormwater Hotline
A hotline will be maintained for
1. See BMP No. 6
1. See BMP No. 6
1. See BMP No. 6
citizens to ask stormwater questions
and report stormwater issues. (See
BMP No. 6)
25.
Stormwater Website
The web page will provide links to
1. See BMP No. 5
1. See BMP No. 5
1. See BMP No. 5
information on the City's stormwater
program, including the permit,
SWMP, applicable ordinances, and
annual reports. The web page will
also include a stormwater issue
reporting mechanism, educational
materials developed by the City, and
links to additional stormwater
educational resources
DRAFT NCS000515 SWMP
Town of China Grove
July 21", 2021
Page 23
DRAFT NCS000515 SWMP
Town of China Grove
July 21", 2021
Page 24
16A.1 'A 1f[OOby-I twalK181 WX4113LIY_M_l`T-0 a 9 Z110 7�u 1
In accordance with 15A NCAC 02H .0153, the MS4name relies upon the North Carolina Sedimentation
Pollution Control Act (SPCA) of 1973 as a qualifying alternative program to meet a portion of the
NPDES MS4 Permit requirements for construction site runoff control measures. The SPCA requirements
include reducing pollutants in stormwater runoff from construction activities that result in land
disturbance of greater than or equal to one acre, and includes any construction activity that is part of a
larger common plan of development that would disturb one acre or more. The state SPCA Program is
either delegated to a city/town, delegated to a county, or implemented by NCDEQ in non -delegated areas.
Table 16: Qualifying Alternative Program Components for Construction Site Runoff Control Program
Permit
Reference
State or Local Program Name
Legal
Authority
Implementing Entity
Meets Whole
or Part of
Requirement
3.5.1 -
Rowan County
15A NCAC
Rowan County
Whole
3.5.4
Delegated SPCA Program*
Chapter 04
NCDEQ
Approved
Delegation
Interlocal
Agreement
* The local delegated SPCA Program ordinances)/regulatory mechanism(s) can be found at:
https:Hlibrary.municode.com/nc/rowan county/codes/code of ordinances?nodeld=COOR CH 18SOE
RSE
The Town of China Grove also implements the following BMPs to meet NPDES MS4 Permit
requirements.
Table 17: Construction Site Runoff Control BMPs
Permit
3.5.6: Public Input
Ref.
Measures to provide and promote a means for the public to notify the appropriate authorities of observed
erosion and sedimentation problems.
BMP
A
B
C
D
No,
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting
Implementation
Metric
26.
Municipal Staff Training
Train municipal staff who receive
1. Train municipal staff
1. Annually Permit Year
1. Number of staff
calls from the public on the protocols
on proper handling of
1 (FY20/21)
trained
for referral and tracking of
construction site runoff
construction site runoff control
control complaints.
complaints.
2.
2.
2.
27.
Stormwater Hotline
1. See BMP No. 6
1. See BMP No. 6
1. See BMP No. 6
DRAFT NCS000515 SWMP
Town of China Grove
July 21', 2021
Page 25
Table 17: Construction Site Runoff Control BMPs
A hotline will be maintained for
2.
2.
2.
citizens to ask stormwater questions
3.
3.
3.
and report stormwater issues (See
BMP No. 6).
Permit
3.5.5: Waste Management
Ref.
Measures to require construction site operators to control waste such as discarded building materials, concrete
truck washout, chemicals, litter, and sanitary waste at the construction site that may cause adverse impact to
water `quality.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting
Implementation
Metric
28.
Establish and Maintain Legal Authority
Develop and implement an ordinance
1. Adopt ordinance
1.Permit Year 1
1. Yes/No/Partial;
to require constriction site operators
Document and report
2. Maintain legal
2. Permit Year 1 - 5
2. Yes/No/Status; Assess
to control waste.
authority
and report annually
3. Implement and
3. Permit Years 2-5
3. See BMP 19
Enforce Ordinance
29.
Contractor Education
Make available through paper and
1. Create brochure to
1. Permit Year 1
1. Yes/No/Status
electronic means materials
share at preconstruction
appropriate for developers
meetings
concerning constriction site solid
2. Add brochure to
2. Permit Year 1
2. Yes/No/Status
waste management.
website
3. Distribute brochure at
3. Permit Years 2-5
3. Yes/No/Status;
preconstruction meetings
Number of sheets
distributed
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 26
PART 9: POST -CONSTRUCTION SITE RUNOFF CONTROL PROGRAM
This SWMP identifies the minimum elements to develop, implement and enforce a program to address
stormwater runoff from new development and redevelopment projects that disturb greater than or equal to
one acre, including projects less than one acre that are part of a larger common plan of development or
sale, that are located within the Town of China Grove and discharge into the MS4. These elements are
designed to minimize water quality impacts utilizing a combination of structural Stormwater Control
Measures (SCMs) and/or non-structural BMPs appropriate for the community and ensure adequate long-
term operation and maintenance of SCMs.
In accordance with 15A NCAC 02H .0153 and .1017, the Town of China Grove implements the
following State post -construction program requirements, which satisfy the NPDES Phase II MS4 post -
construction site runoff control requirements as Qualifying Alternative Programs (QAPs) in the MS4
area(s) where they are implemented.
Table 18: Qualifying Alternative Program(s) for Post -Construction Site Runoff Control Program
State QAP Name
State Requirements
Local Ordinance / Regulatory
Mechanism Reference
None
N/A
N/A
Water Supply Watershed (WS-IV)
15A NCAC 2B
China Grove Unified Development
.0620 - .0624
Ordinance Chapter 3
Table 19: Summary of Existing Post -Construction Program Elements
DRAFT NCS000515 SWMP
Town of China Grove
July 21", 2021
Page 27
Permit Requirements for
Plan Review and Approval
Municipal Ordinance/Code Reference(s)
and/or Document Title(s)
Date Adopted
3.6.2(a) Authority
Town of China Grove Code of Ordinances
Section 54-332
8-2-2011
3.6.3(a) & 15A NCAC 02H.0153(c)
Federal, State & Local Projects
Unified Development Ordinance 8.11.8
9-24-2019
3.6.3(b) Plan Review
Unified Development Ordinance 8.11.9
9-24-2019
3.6.3(c) O&M Agreement
Unified Development Ordinance 8.11.11
9-24-2019
3.6.3(d) O&M Plan
Unified Development Ordinance 8.11.11
9-24-2019
3.6.3(e) Deed
Restrictions/Covenants
Unified Development Ordinance8.1 1. 10 &
8.11.11
9-24-2019
3.6.3(f) Access Easements
Unified Development Ordinance 8.11.10
9-24-2019
Permit Requirements for
Inspections and Enforcement
Municipal Ordinance/Code Reference(s)
and/or Document Title(s)
Date Adopted
3.6.2(b) Documentation
Unified Development Ordinance 8.11.10
9-24-2019
3.6.2(c) Right of Entry
Unified Development Ordinance 8.11.10
9-24-2019
3.6.4 a Pre -CO Inspections
Unified Development Ordinance 8.11.11
9-24-2019
3.6.4(b) Compliance with Plans
Unified Development Ordinance 8.11.11
9-24-2019
3.6.4(c) Annual SCM Inspections
Unified Development Ordinance 8.11.11
9-24-2019
3.6.4(d) Low Density Inspections
Unified Development Ordinance 8.11.11
9-24-2019
3.6.4(e) Qualified Professional
Unified Development Ordinance 8.11.11
9-24-2019
Permit Requirements for
Fecal Coliform Reduction
Municipal Ordinance/Code Reference(s)
Iand/or Document Title(s)
Date Adopted
3.6.6(a) Pet Waste
Town of China Grove Code of Ordinances
Section 10-24
8-2-2016
3.6.6(b) On -Site Domestic
Wastewater Treatment
Unified Development Ordinance 8.10.1
8-1-2006
The annual reporting metrics for the post construction program are provided in Table 20: Post
Construction Site Runoff Control BMPs below.
Table 20: Post Construction Site Runoff Control BMPs
Permit
3.6.5(a), 3.6.5(b), and 4.1.3: Minimum Post -Construction Reporting Requirements
Ref.
Measures to document activities over the course of the fiscal year (July 1 7-June 30) including appropriate
information to accurately describe ogress, status, and results.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting
Implementation
Metric
30.
Standard Reporting
Implement standardized tracking,
1. Track number of low
1. Continuously
1. Yes/No/Partial;
documentation, inspections and
density and high density
Permit Years 1-5
Number of plan reviews
reporting mechanisms to compile
plan reviews performed.
performed for low
appropriate data for the annual self-
density and high density.
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 28
Table 20: Post Construction Site Runoff Control BMPs
assessment process. Data shall be
2. Track number of low
2. Continuously
2. Yes/No/Partial,
provided for each Post -Construction/
density and high -density
Permit Years 1-5
Number of plan
Qualifying Alternative Program
plans approved.
approvals issued for low
being implemented as listed in Tables
density and high density.
3. Maintain a current
3. Continuously
3. Yes/No/Partial;
18 and 19.
inventory of low -density
Permit Years 1-5
Summary of number and
projects and constricted
type of SCMs added to
SCMs including SCM
the inventory; and
type or low -density
number and acreage of
acreage, location and last
low -density projects
inspection date.
constricted.
4. Track number of SCM
4. Continuously
4. Yes/No/Partial;
inspections performed.
Permit Years 1-5
Number of SCM
inspections.
5. Track number of low-
5. Continuously
5. Number of low density
density inspections
Permit Years 1-5
projects inspected.
performed.
6. Track number and
6. Continuously
6. Number of
type of enforcement
Permit Years 1-5
enforcement actions
actions taken.
issued.
Permit
3.6.2: Legal Authority
Ref.
Measures to maintain adequate legal authorities through ordinance or other regulatory mechanism to: (a) review `
designs and proposals for new development and redevelopment to determine whether adequate stormwater
control measures will be installed, implemented, and maintained, (b) request information such as stormwater
plans, inspection reports, monitoring results, and other information deemed necessary to evaluate compliance
with the Post -Construction Stormwater Management Program, and (c) enter private property for the purpose of
inspecting at reasonable times any facilities, equipment, practices, or operations related to stormwater
discharges to determine whether there is compliance with the Post -Construction Stormwater Management
Program.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Implementation
Annual Reporting
Metric
31.
Site Plan Design Review - This permit requirement is fully met by the existing post -construction program, see
references provided in Table 19.
Maintain ordinance(s) to ensure
1.
adequate stormwater control
measures will be installed,
2.
2.
2.
implemented and maintained
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 29
Table 20: Post Construction Site Runoff Control BMPs
Permit
3.6.3: Plan Review and Approval
Ref.
Measures to maintain plan review and approval authority, standards and procedures to: (a) Require Federal,
State, and local government projects to comply with Post -Construction Program requirements throughout the
entire MS4 permitted area, unless the entity is subject to its own NPDES MS4 permit or a qualifying alternative
program, (b) Conduct site plan reviews of all new development and redeveloped sites that disturb greater than
or equal to one acre, and sites that disturb less than one acre that are part of a larger common plan of
development or sale for compliance with 15A NCAC 02H.. 10 17 and the qualifying alternative programs that
apply within your jurisdiction, (c) Ensure that each project has an Operation and Maintenance Agreement that
complies with 15A NCAC 02H .1050(12), (d) Ensure that each project has an Operation and Maintenance Plan
that complies with 15A NCAC 02H .1050(13), (e) Ensure that each project has recorded deed restrictions and
protective covenants, that require the project to be maintained consistent with approved plans, and (f) Ensure
that each SCM and associated maintenance accesses be protected in a permanent recorded easement per 15A
NCAC 02H 1050 9) and 10).
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting
Implementation
Metric
32.
Legal Authority
Maintain compliance by Federal,
1. Revise code to require
1. Permit year 1
1. Yes/No/Partial;
State, and Local government projects
Federal, State, and local
Review and assess
and revise reference to stormwater
government projects to
effectiveness
design manual to specify NCDEQ
comply with post
Stormwater Design manual.
construction
requirements unless
subject to its own
NPDES MS4 permit or
qualifying alternative
program
2. Revise code to specify
2. Permit year 1
2. Yes/No/Partial, Report
NCDEQ Stormwater
code reference and date
Design Manual as the
adopted
reference stormwater
design manual
33.
Developer Resources
Establish a developer stormwater
1. Upload links to
1. Permit year 1, in
1. Yes/No/Partial; link to
resources section on the city website
ordinances, post
conjunction with
webpage
so relevant materials are easily
constriction
stormwater website
accessible for developers.
requirements, link to
development
design standards, and
other relevant material to
website
2. Update when changes
2. Continuously
2. Yes/No/Partial; Report
to resources occur
date of updates
and changes made
34.
O&M Plan
Maintain an ordinance requiring each
1. Maintain legal
1. Permit Year 1
1. Yes/No/Partial;
stormwater control measure to have
authority through
Review and assess
an Operation and Maintenance Plan
ordinance revisions
effectiveness
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 30
Table 20: Post Construction Site Runoff Control BMPs
that complies with 15A NCAC 02H
2. Enforcement of new
2. Continuously, after
2. Yes/No/Partial;
.1050(13)
code by requiring
ordinance is adopted.
Number of O&M plans
approval of O&M Plan
approved
by Stormwater
Administrator prior to
plan approval
Permit
3.6.4: Inspections and Enforcement
Ref.
Measures to maintain inspection and enforcement authority, standards and procedures to: (a) Conduct post -
construction inspections prior to issuing a Certificate of Occupancy or a Temporary Certificate of Occupancy.
Alternatively, the project owner may provide a surety bond to guarantee compliance with the approved plan(s),
(b) Ensure that the project has been constructed in accordance with the approved plan(s), (c) Ensure annual
inspection of each permitted SCM to ensure compliance with the approved Operation and Maintenance
Agreement, (d) Ensure inspection of low density projects at least once during the permit term, and (e) Require
that inspections be conducted by a qualified professional.
BMP
A
B
C
D
No,
Description of BMP
Measurable Goal(s)
Schedule for
Implementation
Annual Reporting
Metric
35.
Inspection of low -density projects
Establish the legal authority for
1. Establish legal
1. Permit year 2
1. Yes/No/Partial; Report
inspection of low -density projects at
authority through code
code reference and date
least once during the permit term; and
revision
adopted
carry out the inspections.
2. Conduct inspection of
2.Permit Year 2
2. Yes/No/Partial
20% of low -density
projects each year (See
BMP No. 30.5)
36.
Inspection Tracking
Track the results of regular
1. Establish inspection
1. Permit year 2
1. Yes/No/Status
postconstriction SCM and low-
tracking mechanism to
density
meet all requirements of
2. Implement Inspection
2. Continuously Permit
2. Yes/No/Status
inspections to provide documentation
and the ability to identify chronic
tracking
Years 3-5
violators.
37.
Inventory of SCM and low -density projects
Develop a comprehensive inventory
1. Establish list of
1. Permit year 1
1. Yes/No/Status,
of permitted post -constriction SCMs
existing structural SCMs
Number of SCMs and
and low -density projects to be
and low -density projects
low -density projects
utilized for inspections and tracking.
inventoried
2. Develop a low -density
2. Permit year 1
2. Yes/No/Status
inspection and
enforcement SOP to
standardize and
consistently manage
process
DRAFT NCS000515 SWMP
Town of China Grove
July 21', 2021
Page 31
Table 20: Post Construction Site Runoff Control BMPs
3. Issue letter of
3. Permit year 1
3. Yes/No/Status;
notification to owners
Number of letters sent
making them aware of
upcoming inspections
4. Add SCMs and low-
4. Permit year 1
4. Yes/No/Partial
density projects to
inventory list when
project as-builts are
approved
Permit
3.6.6: Fecal Coliform Reduction
Ref.
Measures to control, to the maximum extent practicable, sources of fecal coliform,per 15A NCAC 02H
.1017(7).; At a minimum, the program shall include: (a) A pet waste management component, which may be
achieved by revising an existing litter ordinance, and (b) An on -site domestic wastewater treatment system
component, if applicable, which may coordinated with local county health department, to ensure proper
operation and maintenance of such systems.'
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
-
Schedule for
Implementation
Annual Reporting
Metric
38.
Pet Waste Litter Program
Review the Town of China Grove pet
1. Review ordinance for
1. Permit Year 1
1. Yes/No/Status
Waste disposal ordinance
Pet Waste disposal
requirements and Update
2. Include pet waste
2. Permit Year 1
2. Yes/No/Status;
disposal information on
Report number of
social media and websiteposts/views
3. Maintain current town
3. Permit Year 1
3. Yes/No/Status;
owned Pet Waste
Number of bags replaced
Stations
4. Review Pet Waste
4. Continuously Permit
4. Yes/No/Partial; New
Station Locations
Years 2-5
stations required?
Relocations?
5.
5.
5.
39.
Septic System Education Program
Provide Educational Brochures to
1. Develop brochure
1. Permit Year 2
1. Yes/No/Status
town residents who have private
addressing the operation
septic systems regarding operation
and maintenance of
and maintenance
-private septic sstems
2. Identify parcels using
2. Permit Years 3-5
2.Yes/No/Status, Report
private septic systems
number of brochures
and distribute
mailed
educational brochure
annually
3.
3.
3.
4.
4.
4.
5.
5.
5.
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 32
DRAFT NCS000515 SWMP
Town of China Grove
July 21", 2021
Page 33
PART 10: POLLUTION PREVENTION AND GOOD HOUSEKEEPING PROGRAMS
This SWMP provides a comprehensive pollution prevention and good housekeeping strategy for the
Town of China Grove municipal facilities and operations. Pollution prevention and good housekeeping is
accomplished through the implementation of seven required programs, which collectively address the
ultimate goal of preventing or reducing pollutant runoff from municipal operations such as parks and
open space maintenance, fleet and building maintenance, new construction and land disturbances, and
municipal storm sewer system maintenance.
Pollution prevention and good housekeeping for municipal operations includes the following programs:
1. Municipal Facilities Operation and Maintenance Program
2. Spill Response Program
3. MS4 Operation and Maintenance Program
4. Municipal SCM Operation and Maintenance Program
5. Pesticide, Herbicide and Fertilizer Management Program
6. Vehicle and Equipment Maintenance Program
7. Pavement Management Program
The Town of China Grove will manage, implement and report the pollution prevention and good
housekeeping BMPs as specified in Table 21 below for each required program.
Table 21: Pollution Prevention and Good Housekeeping BMPs
Permit
3.7.1: Municipal Facilities Operation and Maintenance Program
Ref. '
Measures to manage facilities that are owned and operated by the permittee and have the potential for generating polluted
stormwater runoff. The permittee shall maintain a current inventory of municipal facilities; perform facility inspections
and routine maintenance; establish specific frequencies, schedules, and standard documentation; provide staff training on
general stormwater awareness and imp ementing pollution prevention'and good housekeeping ractices.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting
Implementation
Metric
40.
Inventory of Municipal Facilities
Develop and maintain an up-to-date
1. Compile list of
1. Permit Year 1
1. Yes/No/Partial;
inventory of municipal facilities with
existing City -owned
Number of facilities
potential to generate polluted runoff.
facilities
inventoried; date list is
completed
2. Perform initial
2. Permit year 2
2. Yes/No/Partial;
inspection of facilities
Number of inspections
for potential to generate
performed and number of
polluted runoff or
facilities classified as
requiring spill response
high potential and low
procedures. Classify
potential
facilities as having high
or low potential for
stormwater pollution
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 34
Table 21: Pollution Prevention and Good Housekeeping BMPs
3. Determine which
3. Permit year 2
3. Yes/No/Partial;
facilities require a SPCC
Number of SPCC Plans
Plan
required
4. Determine which
4. See BMP No. 50
4. See BMP No. 50
facilities require a
NPDES Industrial permit
See BMP No. 50)
5. Update inventory as
5. As required
5. Yes/No/Partial;
needed when facilities
Number of facilities
are added or closed
added/revisions made
41.
Facility Inspections
Inspection of Town facilities to
1. Establish a SOP for
1. Permit Year 1
1. YesiNO/Partial;
confirm good housekeeping practices
town facility inspections,
Number of inspections
are being followed
including an inspection
and issues corrected
schedule, inspection
report documentation,
and tracking system
2. Implement annual
2. Annually conduct
2. Yes/No/Partial;
facility inspections for
inspections
Number of inspections
high stormwater
and issues corrected
pollution potential
facilities and once per
permit term inspections
for low potential
facilities
42.
Staff Training
Develop or identify a staff training
1. See BMP No. 45
1. See BMP No. 45
1. See BMP No. 45
program for general stormwater
pollution prevention and provide to
public works department employees
(See BMP No. 45).
Permit
3.7.2: Spill Response Program
Ref.
Measures for facilities and operations that store and/or use materials that have the potential to contaminate stormwater
runoff if spilled. The permittee shall maintain written spill response procedures and train staff on spill response
procedures.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Implementation
Annual Reporting
Metric
43.
Inventory of facilities with Spill potential
Maintain a list of city facilities and
1. See BMP 40
1. See BMP 40
1. See BMP 40
operations storing materials that
would be a pollutant if spilled and
introduced to the stormwater system
and classify by hazard and quantity
See BMP No. 40).
44.
Spill Response Procedures
DRAFT NCS000515 SWMP
Town of China Grove
July 21 ", 2021
Page 35
Table 21: Pollution Prevention and Good Housekeeping BMPs
Maintain spill response procedures
1. Review general spill
1. Permit year 1
1. Yes/No/Partial; Are
and continue training of appropriate
response procedures
procedures adequate?
staff.
es/no/status
2. Review specific spill
2. Permit year 1
2. Yes/No/Partial; Are
response procedures for
procedures adequate? —
town facilities and
yes/no/status
operations with potential
to produce high hazard
spills
3. Update as facilities
3. As required
3. Yes/No/Partial;
and operations are
Number of additions or
revised
revisions made
4. Train new fire
4. As required
4. Yes/No/Partial;
department staff in spill
Number of new staff
response procedures
trained
5. Train staff at facilities
5. Annually
5. Yes/No/Partial;
with potential for high
Number of staff trained
hazard spills in first
response actions and
reporting rocedures
Permit
37.3: MS4 Operation and Maintenance Program
Ref.
Measures to minimize pollutants in the stormwater collection system. The permittee shall provide operation and
maintenance staff training on stormwater awareness and pollution prevention, perform MS4 inspections, maintain the
collection system including catch basins and conveyances; and establish specific frequencies, schedules, and standard
documentation.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Implementation
Annual Reporting
Metric
45.
Staff Training
Develop or identify a staff training
1. Develop or identify
1. Permit year 2
1. Yes/No/Partial
program for general stormwater
appropriate training
pollution prevention and provide to
program
public works department employees
2. Provide initial training
2. Annually, beginning
2. Yes/No/Partial;
for all employees
in permit year 3
Number of staff
members trained and
topics from training
3. Provide training for
3. Annually, beginning
3. Yes/No/Partial;
new hires
in permit year 3, as
Number of new hires
necessitated by staffing
trained and topics from
changes
training
46.
MS4 System Inspections and Maintenance
A proactive plan for MS4 system
1. Develop a SOP that
1. Permit year 2
1. Yes/no/Partial;
maintenance, requiring regular
includes proactive
Created?
inspections and maintenance.
inspection schedules,
standard documentation,
staff responsibilities, and
proper maintenance
training
DRAFT NCS000515 SWMP
Town of China Grove
July 21', 2021
Page 36
Table 21: Pollution Prevention and Good Housekeeping BMPs
2. Perform regular
2. Continuously Permit
2. Yes/No/Status;
inspections in
Years 3-5
Number of inspections
accordance with the SOP
documented
(See BMPs No. 44.1 and
44.4)
3. Verify, document, and
3. Continuously, as
3. Yes/No/Partial;
prioritize maintenance
potential maintenance
Number of maintenance
activities identified by
activities are identified
activities performed
inspections or citizen
reports
4. Develop an inspection
4. Permit year 2
4. Yes/No/Partial;
and maintenance
tracking system to be
used in accordance with
the SOP and to identify
"hot spot" locations for
system maintenance
Permit
3.7.4: Municipal SCM Operation and Maintenance Program
Ref.
Measures to manage municipally -owned, operated, and/or maintained structural stormwater control measures (SCMs) that
are installed for compliance with the permittee's post -construction program. The permittee shall maintain a current
inventory of SCMs, perform SCM inspections and maintenance, and shall establish specific frequencies, schedules, and
documentation.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Implementation
Annual Reporting
Metric
47.
Inventory of Municipal structural SCMs
Development and maintain of a
1. Create an inventory of
1. Permit year 1
1. Yes/No/Partial;
current inventory of municipally
existing City -owned
Number of municipal
owned structural SCMs.
SCMs with information
structural SCMs
including type, year
built, date of last
inspection, and
maintenance actions
2. Compile, and develop
2. Permit year 2
2. Yes/No/Partial;
as needed, Operation and
Maintenance Plans for all
City -owned SCMs
3. Update as necessitated
3. As required
3. Yes/No/Partial;
by new City
Number of updates to list
development
48.
SCM Inspections and Maintenance
Development an SOP to inspect and
1. Locate City -owned
1. Permit year 1
1. Yes/No/Partial; Report
maintain municipally owned
SCMs and add them to
the number and type of
structural SCMs.
the MS4 Map with type
SCMs added to the map
of SCM indicated
DRAFT NCS000515 SWMP
Town of China Grove
July 21', 2021
Page 37
Table 21: Pollution Prevention and Good Housekeeping BMPs
2. Update the map when
2. Annually, once BMPs
2. Yes/No/Partial; Note
new City -owned SCMs
No. 45.1 and 46.1 are
annually whether new
are constructed
completed
City -owned SCMs were
added. If any are added,
note number and type
added as well as number
and type of SCMs
mapped to date
3. Maintain NC SCM
3. Continuously,
3. Yes/No/Status;
Inspections and
beginning in permit year
Number of staff
Maintenance
2
members with active
Certification for
certification
appropriate ersonnel
4. Develop SCM
4. Permit year 2
4. Yes/No/Partial;
inspection forms
5. Inspect each device
5. Annually, beginning
5. Yes/No/Partial;
using appropriate SCM
in permit year 3
Number of SCMs
inspection form
inspected, number
passing inspection,
number requiring
inainLenance
6. Perform maintenance
6. As required
6. Yes/No/Partial;
tasks identified in
Number of SCMs
inspections
maintained
7. Develop a tracking
7. Permit year 2
7. Yes/No/Partial;
document (See BMP No.
46.13.4)
Permit
3.7.5: Pesticide, Herbicide and Fertilizer Management Program
Ref. '
Measures to minimize water quality impacts from the use of landscape chemicals. The permittee shall provide routine
pollution prevention and chemical use, storage and handling training, and shall ensure compliance with permits and
aDDlicator certifications.'
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Implementation
Annual Reporting
Metric
49.
Pesticide, Herbicide, Fertilizer Applicator Training
Training of town staff who apply
1. Maintain Right -of-
1. Continuously
1. Yes/No/Partial;
landscape chemicals in order to
Way Pest Control, Public
Number of staff
minimize water quality impacts from
Health Control, and
members with active
pesticides, herbicides, and fertilizers
Ornamental & Turf Pest
certification
Control applicator
certifications for
appropriate ersonnel
2. Require contractors
2. Continuously
2. Yes/No/Partial;
provide copies of NC
Pesticide License
DRAFT NCS000515 SWMP
Town of China Grove
July 21", 2021
Page 38
Table 21: Pollution Prevention and Good Housekeeping BMPs
3. Develop or identify
3. Permit year 2
3. Yes/No/Partial;
pollution prevention and
chemical use, storage
and handling training
program
4. Provide staff training
4. Annually, beginning
4. Yes/No/Partial;
in pollution prevention
in permit year 3
Number of staff trained
and chemical use,
and topics covered
storage and handling
training
Permit
3.7.6: Vehicle and Equipment Maintenance Program
Ref.
Measures to prevent and minimize contamination of stormwater runoff from areas used for municipal vehicle and
equipment maintenance and/or cleaning. The permittee shall ensure that municipal industrial facilities subject to NPDES
industrial permitting comply with those permit requirements, provide routine pollution, prevention training to staff,
perform routine inspections, and establish specific frequencies, schedules, and documentation.'
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Im lementation
Annual Reporting
Metric
50.
NPDES Industrial Permit Compliance
Review municipal facilities inventory
1. Review municipal
1. Permit year 1
1. Yes/No/Partial;
to ensure NPDES Industrial Permit
facilities inventory to
Number of facilities
Compliance.
determine which
determined to require a
facilities require a
NPDES Industrial Permit
NPDES industrial
stormwater permit
2. Permitting of
2. Permit year 1,
2. Yes/No/Partial;
municipally owned
following review of
Report number of new
facilities; apply for new
facilities, and
permits received or
permits and confirm that
continuously thereafter
renewed as well as
all existing permits are
number of active
valid. Renew permits as
permits.
required
3. Develop a municipal
3. Permit year 1
3. Yes/No/Partial;
industrial facility
inspection form
4. Perform facility
4.Annually, after NPDES
4. Number of inspections
inspections for
permits acquired
performed
compliance with permit
5. Establish NPDES
5. Permit year 1
5. Yes/no/status
Industrial Permit
tracking mechanism to
document list of
municipally owned
facilities with permit,
permit expiration dates,
and inspections
51.
Vehicle and Equipment Cleaning and Maintenance Facility Inspection
Routine inspections as part of general
1. Develop an inspection
1. 1. Permit year 1
1. Yes/No/Partial;
facilityinspections (See BMP No.
checklist
DRAFT NCS000515 SWMP
Town of China Grove
July 21", 2021
Page 39
Table 21: Pollution Prevention and Good Housekeeping BMPs
39) to ensure that vehicle and
2. Perform inspections
2. Bi-annually, beginning
2. Yes/No/Partial;
equipment facilities are following
using inspection
in permit year 1
Number of inspections
proper procedures to minimize water
checklist and notify
quality impacts from vehicle and
facility manager of any
equipment cleaning and maintenance.
corrective actions
required
3. Perform re -inspections
3. As required by
3. Yes/No/Partial;
of any facility that
corrective actions issued
Number of facilities
required corrective
requiring corrective
action
action, number of
resolutions
52.
Staff Training
Provide general stormwater
1. See BMP No. 44
1. See BMP No. 44
1. See BMP No. 44
awareness training and pollution
prevention training to employees
working in vehicle maintenance and
cleaning areas (See BMP No. 44).
Permit
37.7: Pavement Management Program
Ref.
Measures to reduce pollutants in stormwater runoff from municipally -owned streets, roads, and parking lots within the
permittee's corporate limits. The permittee shall implement measures to control litter, leaves, debris, particulate and fluid
pollutants associated with vehicles, and establish specific fre uencies, schedules, and documentation.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Implementation
Annual Reporting
-Metric
53.
Street Sweeping
Street sweeping following a regular
1. Develop a SOP,
1. Permit Year 1
1. Yes/No/Partial;
schedule in order to reduce pollutants
including a schedule and
from City owned and maintained
plan to document
streets.
2. Implement SOP and
2.Annually beginning in
2. Yes/No/Partial; Total
documentation
permit year 2
number of street miles
swept
3. Identify "hot spot"
3. Permit Years 3-5
3. Yes/No/Status
areas for more frequent
sweeping
54.
Leaf Collection
Periodic collection of leaves, at least
1. Develop a SOP,
1. Permit year 1
1. Yes/No/Status
twice a year, from residential and
including a schedule and
public areas to reduce pollutants and
plan to document
clogging of storm system inlets.
2. Implement SOP and
2. Regularly, beginning
2. Yes/No/Status;
documentation
in permit year 2
3. Provide periodic
3. Permit Year 1
3. Yes/No/Status;
seasonal leaf collection
Volume of leaves
collected (tons)
4. Evaluate seasonal leaf
4. Permit Years 3-5
4. Yes/No/Status;
collection routes to
Report Results
identify "hot spot" areas
for more frequent
collection
DRAFT NCS000515 SWMP
Town of China Grove
July 2 Pt, 2021
Page 40
Table 21: Pollution Prevention and Good Housekeeping BMPs
55.
Vehicle Spill Cleanup
An organized vehicle spill cleanup
1. Maintain spill
1. See BMP No. 43
1. See BMP No. 43
response to prevent pollutants from
response procedures
vehicular accidents from entering the
2. Provide public
2. See BMP No. 7
2. See BMP No. 7
storm drain system.
education about stopping
vehicle leaks
56.
Litter Collection
Collect litter weekly in public spaces
1. Develop a SOP,
1. Permit Year 1
1. Yes/No/Partial;
including a schedule and
plan to document weekly
litter collection
2. Implement SOP and
2.Annually beginning in
2. Yes/No/Partial;
documentation
permit year 2
Document collection
results
3. Identify "hot spot"
3. Permit Years 3-5
3. Yes/No/Status
areas for more frequent
collection
DRAFT NCS000515 SWMP
Town of China Grove
July 21', 2021
Page 41