Loading...
HomeMy WebLinkAboutNCC214434_ESC Approval Submitted_20210804ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director �.SSSJJI S. �C` f Y� Environmental Quat ity July 27, 2021 LETTER OF APPROVAL DEPCOM Power, Inc. Attention: Derrick Johnson of Timmons Group 5410 Trinity Rd., Suite 102 Raleigh, NC 27607 RE: Project Name: Partin Solar - Substation Acres Approved: 9.6 Project 1D: SURRY-2022-003 County: Surry City: Elkin Address: Elkin Wildlife Rd. River Basin: Yadkin-PeeDee Stream Classification: C Submitted By: Timmons Group Date Received by LQS: July 16, 2021 Plan Type: New -Express Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent CeNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, You will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.iucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. North Carolina Department of Environmental Quality ! Division of Emrgy, Mineral and Land Resources mhza.m_m,., _E Winston-Salem Regional Oftict j 450 Hanes Mill Road. Suite 3001 Winston-Salem. North Carolina 27€03 335,776,980f Letter of Approval DEPCOM Power, Inc. July 27, 2021 Page 2 of 2 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. in addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sin rely, Zachar entz, El Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCG01 Fact Sheet cc: Jacob Dooley, PE of Timmons Group Consultants (via e-mail) DEPCOM Power, Inc. Attention: Anthony Perrino, SHIP - Operations 9185 E. Pima Center Pkwy #100 Scottsdale, AZ 85258 WSRD file