Loading...
HomeMy WebLinkAboutNCC214434_NOI Application_20210804Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 8/3/2021 12:10:52 PM (NCG01 NOI Submission) Approve by Broussard, Brooklyn C 8/3/2021 12:17:39 PM (Review- Construction NOI 61221) • The task was assigned to Broussard, Brooklyn C by round robin distribution 8/3/2021 12:12 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: August 5, 2021 5:00 PM. The priority is: High 8/3/2021 12:12 PM Submit by Selkane, Aziza 8/4/2021 10:49:53 AM (Payment Verification for NCC214434) * Steven Taylor • Selkane, Aziza assigned the task to Selkane, Aziza 8/4/2021 10:48 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: September 14, 2021 5:00 PM. The priority is: High 8/3/2021 12:18 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Partin Solar - Substation 1 b. Specific Lot This field nay be used to list specifc lot numbers. Numbers 496200226585, 496200329256 1 c. Parcel ID List all Rios associated w ith this project. Number(s) (PIN) 496200226585, 496200329256 2. County* Surry 3. Highway or Street Elkin Wildlife Rd. Address* Street name only is acceptable if no address number assigned yet 4. City or Township* Elkin 5. State * NC 6. Zip Code* 28621 7. Latitude* Enter the latitude in decimal degrees 36.2705 8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative) -80.8148 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 08/09/2021 Estimated Construction Project Start Rate 10. Date to End * 07/14/2022 Estinated Construction Project End Date 11. SIC (Primary) * Other (9999) Standard Industrial C]assification for Development 12. Acres to be 9.60 disturbed* (including off -site borrow and waste areas) 13. Total site area 242.10 (acres) * 14. Post- 169.20 construction (Estimated) impervious area (acres) * Project Tracking ID NCC-SURRY-2021-Partin Solar - Substation Assigned automatically (not used) Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Turkey Creek Waterbody* Narreof waterbody into which stormwater runoff will discharge 15b. Waterbody 12-58 Index No. * NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * DEPCOM POWER, INC. IF pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Graeme If Corporation, enter Faegistered Agent First %rre 3. Last Name* McNeil IF Corporation, enter F;bgistered Agent Last %rre 3b. Title SVP - Project Operations 4. Permitee E-mail gmcneil@depcompower.com Address* 5. Permittee 281-546-3479 Telephone No.* 6. Permittee Mailing Street Address Address* 9185 E. Pima Center Parkway Address Line 2 Suite 100 City Scottsdale Check box if the street address the same as mailing address 7. Permittee Street Address* Fbstal / Zip Code 85258 V Yes Street Address 9185 E. Pima Center Parkway Address Line 2 Suite 100 city Scottsdale Fbstal / Zip Code 85258 State / Ffovince / Fbgion AZ Country United States State / Ftovince / Region AZ Country United States 8. Type of Ownership is only individual if an individual is naned in B.1. above. Ownership* Non -Government C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Steve Contact - First Name * 2. Primary Site Taylor Contact - Last Name * 3. Title Project Manager 4. Site Contact E- staylor@depcompower.com mail Address* 5. Site Contact 336-307-9168 Telephone No. 6. Organization DEPCOM POWER, INC. Name 7. Site Contact Street Address Mailing Address* 9185 East Pima Center Parkway Address Line 2 Suite 100 city Scottsdale Fbstal / Zip Code 85258 8. Consultant Name (Optional) First and Last narre 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. 11. Billing E-mail (For Annual Fee correspondence) staylor@depcompower.com Default is legally responsible person a-rrail 12. Billing (For Annual Fee correspondence) Telephone 336-307-9168 Default is legally responsible person telephone State / Rovince / Region Arizona Country United States D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 07/27/2021 Approved * 2. E&SC Plan Project SURRY-2022-003 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Winston-Salem (WSRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan SURRY-2022-003_20210727_Approval_Express.pdf 3.75MB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Mast be RDFformat (limit 20 NB) PARTIN SP-100-5-T Rev 4 9-10-20.pdf 2.35MB Rease do not upload entire set of E&SC plans. 7. Notes (Optional) Rovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies if necessary. Please note that the Site Location Map uploaded shows the remainder of this solar project in addition to the 9.6 acres permitted through this approval. This approval is for the project substation/switchyard area only. The rest of the project is to be permitted separately. 8. NOI Certification NCG01 eNO1 Certification Form_NC70 Partin Form 534.21 KB Substation_SIGNED. pdf Mast be RDFformat This is an Express r No Review Project* F Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* IT The Legally Responsible Person named on this Notice of Intent f Authorized Responsible Person* (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Graeme McNeil Title SVP - Project Operations Organization Legally Plesponsible Entity DEPCOM POWER, INC. Date * 08/03/2021 F. Tracking and COC Info NOI Tracking No. 61221 NC Reference No. NCG01-2021-4434 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC214434 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 4434 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2021 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC214434-2021 Invoice Due Date 9/2/2021 Initial Fee $ 100.00 Invoice Status OPEN