Wanucha, Dave
From:Euliss, Amy
Sent:Friday, July 23, 2021 12:47 PM
To:Williams, Andrew E CIV USARMY CESAW (USA)
Cc:Swicegood, Dale L; Dagenhart, Daniel R; Byrd, Barry L; Wanucha, Dave
Subject:RE: \[EXTERNAL\] SAW-2020-01998 Bridge 8_Final
Thanks Andy!
From: Williams, Andrew E CIV USARMY CESAW (USA) <Andrew.E.Williams2@usace.army.mil>
Sent: Friday, July 23, 2021 11:20 AM
To: Euliss, Amy <aeuliss@ncdot.gov>
Cc: Youngman, Holland J <holland_youngman@fws.gov>; Williams, Andrew E CIV USARMY CESAW (USA)
<Andrew.E.Williams2@usace.army.mil>
Subject: RE: \[EXTERNAL\] SAW-2020-01998 Bridge 8 Stokes County
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Amy,
The US Army Corps of Engineers has reviewed the updated project plans (D100233 Permit Drawing-Revised 7-23-21.pdf)
associated with the Action Identification SAW-2020-01998 (NCDOT Bridge 8 over the Dan River in Stokes County), and
confirm the proposed NWP activity complies with the terms and conditions of the applicable NWP(s), and will result in
no more than minimal individual and cumulative adverse environmental effects.
Furthermore, through written correspondence (attached) with the United States Fish and Wildlife Services (USFWS),
Asheville Office, we have verified that the updated plans do not trigger a need to re-initiate ESA section 7 consultation.
As such, the updated plans (D100233 Permit Drawing-Revised 7-23-21.pdf), will be added to our administrative record
for this project and will be considered as the approved plans.
Please let me know if you have any questions or need any additional information.
Andrew Williams
Regulatory Project Manager
Regulatory Division Office
US Army Corps of Engineers, Wilmington District
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Office Tel: (919) 554-4884, x26
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at our website at
https://regulatory.ops.usace.army.mil/customer-service-survey/
to complete the survey online.
1
From: Euliss, Amy <aeuliss@ncdot.gov>
Sent: Friday, July 23, 2021 7:33 AM
To: Youngman, Holland J <holland_youngman@fws.gov>; Williams, Andrew E CIV USARMY CESAW (USA)
<Andrew.E.Williams2@usace.army.mil>
Cc: Swicegood, Dale L <dlswicegood@ncdot.gov>; Dagenhart, Daniel R <drdagenhart@ncdot.gov>; Byrd, Barry L
<blbyrd1@ncdot.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov>
Subject: \[Non-DoD Source\] RE: \[EXTERNAL\] SAW-2020-01998 Bridge 8 Stokes County
All,
We’ve revised the permit plans to add a note about the signing for the river access. We also revised the causeway note
to reflect note not impeding more than half of the river with the causeways, and remove the note about only one
causeway at a time.
Dave,
If you have any questions when you are back from vacation, let me know.
Thanks all for working with us to get the note revised.
Amy
From: Euliss, Amy
Sent: Thursday, July 22, 2021 3:40 PM
To: Youngman, Holland J <holland_youngman@fws.gov>; Williams, Andrew E CIV USARMY CESAW (USA)
<Andrew.E.Williams2@usace.army.mil>
Cc: Swicegood, Dale L <dlswicegood@ncdot.gov>; Dagenhart, Daniel R <drdagenhart@ncdot.gov>; Byrd, Barry L
<blbyrd1@ncdot.gov>
Subject: RE: \[EXTERNAL\] SAW-2020-01998 Bridge 8 Stokes County
Thanks all! I’ll get the plan sheet updated to alter the causeway note, and to add the river signing to the plan sheet.
Also, I have attached an email that documents the receipt of the conservation payment to WRC. As soon as I get a
survey memo from Biological Surveys Group, I’ll pass it along. For now, I have attached an email from them stating that
no bats were discovered in their June survey.
Barry/Dale,
We’ll need to plan sheet revised as discussed in the email below. Let me know if you need anything from me or Daniel
to take care of this prior to installing the causeways.
Amy
From: Youngman, Holland J <holland_youngman@fws.gov>
Sent: Thursday, July 22, 2021 3:37 PM
To: Williams, Andrew E CIV USARMY CESAW (USA) <Andrew.E.Williams2@usace.army.mil>; Euliss, Amy
<aeuliss@ncdot.gov>
Subject: Re: \[EXTERNAL\] SAW-2020-01998 Bridge 8 Stokes County
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
2
Hi Andy and Amy -
Thanks for following up, Andy. I was able to speak with Jay and Janet about this today. We have no issue with the
causeways being in place simultaneously, as opposed to staged, as long as their combined presence does not impede
more than half of the flow of the river at any time. This was confirmed during in-person discussion at the
preconstruction meeting yesterday, and I'm including it again here so that this correspondence can serve as
administrative record.
Please let me know if further discussion on the matter is needed - happy to join a call.
Best,
Holland Youngman
(she/her/hers)
Wildlife Biologist
U.S. Fish and Wildlife Service
Asheville Ecological Services Field Office
160 Zillicoa Street, Asheville, North Carolina, 28801
Cell: 828-575-3920 Office: 828-258-3939 x42235
From: Williams, Andrew E CIV USARMY CESAW (USA) <Andrew.E.Williams2@usace.army.mil>
Sent: Thursday, July 22, 2021 2:23 PM
To: Euliss, Amy <aeuliss@ncdot.gov>; Youngman, Holland J <holland_youngman@fws.gov>
Subject: \[EXTERNAL\] SAW-2020-01998 Bridge 8 Stokes County
This email has been received from outside of DOI - Use caution before clicking on links, opening attachments, or
responding.
Amy/Holland:
Regarding SAW-2020-01998 (NCDOT/NC Highway 704/Bridge 8/Dan River/Stokes County), USACE would be able to
replace the plan sheets indicating only one work pad is allowed at a time, in order to rectify some of the construction
difficulties expressed yesterday during the preconstruction meeting, provided that USFWS would not need to make any
changes to the referenced BO. From the USACE perspective, a new verification is not necessary since the location and
amount of fill remain the same as indicated on the verification issued on November 24, 2020. The request is only for
the timing of the proposed fill. Additionally, we would request that a River User Safety Plan or Notes also be added to
the revised plan sheets.
Please call me if you want to discuss, have questions, etc. 919-426-8709.
3
Andrew Williams
Regulatory Project Manager
Regulatory Division Office
US Army Corps of Engineers, Wilmington District
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Office Tel: (919) 554-4884, x26
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at our website at
https://regulatory.ops.usace.army.mil/customer-service-survey/
to complete the survey online.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
4