HomeMy WebLinkAboutNCC192293_NOT Closeout Documents_20210728North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336)
776-9800
County: Forsyth Project: FC Clemmons Branch Library River basin: Yadkin-PeeDee
Person financially responsible: Forsyth County - Damon L Sanders -Pratt, Deputy Project #: FORSY-2020-010
County Manager
Address: 201 N. Chestnut Street, Winston-Salem, NC 27101
1. Project Location: James St., Clemmons
Pictures: Yes - Digital
2. Weather and soil conditions: Rain, Wet Soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: July 12, 2021
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCGO1-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Tyler Pearson Others present:
Date of inspection: July 08, 2021 Time arriving on site: 11:45 AM Time leaving site: 12:15 PM
cc: