Loading...
HomeMy WebLinkAbout20210818 Ver 1_401 Application_20210728Staff Review Does this application have all the attachments needed to accept it into the review process?* r Yes r No ID#* 20210818 Version* 1 Is this project a public transportation project?* r Yes r No Reviewer List:* Rick Trone:eads\rvtrone Select Reviewing Office:* Submittal Type:* Central Office - (919) 707-9000 401 Application Does this project require a request for payment to be sent?* r Yes r No How much is r $240.00 owed?* r $570.00 Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * r For the Record Only (Courtesy Copy) r New Project r Modification/New Project with Existing ID r More Information Response r Other Agency Comments r Pre -Application Submittal r Re-Issuance\Renewal Request r Stream or Buffer Appeal Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request here: Prefile Submittal_04.21.21.pdf Date for Meeting Request 4/21/2021 ID# 20210818 Version 1 Project Contact Information Name: Heather LaGagamba who is submitting the information? Email Address: hlagamba@pilotenviro.com Project Information Project Name: The Preserve at Tallulah Springs Is this a public transportation project? r Yes r No 50.92KB Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown County (ies) Orange Please upload all files that need to be submited. click the upload button or drag and drop files here to attach document 6754-The Preserve at Tallulah 15.35MB Springs_PCN_7.28.2021. pdf Only pdf or krre files are accepted. Describe the attachments or comments: PCN for 401 WQC Sign and Submit V By checking the box and signing box below, I certify that: ■ I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. ■ I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. ■ I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the online form. Signature: W,WmeL. O. zaWmWA-7, Submittal Date: Is filled in automatically. Preliminary ORM Data Entry Fields for New Actions ACTION ID 9: SAW- 2021 Prepare file folder ❑ Begin Date (Date Received): July 28,2021 Assign Action ID Number in ORM ❑ 1. Project Name [PCN Form A2a]: The Preserve at Tullulah Springs 2. Work Type: ❑✓ Private ❑Institutional ❑Government ❑ Commercial 3. Project Description / Purpose [PCN Form B3d and B3e]: The site contains wooded land and fields. The site is proposed for residential development. 4. Property Owner / Applicant [PCN Form A3 or A4]: Margaret Kiser 5. Agent / Consultant [PNC Form A5 — or ORM Consultant ID Number]: Pilot Environmental, Inc. 6. Related Action ID Number(s) [PCN Form B5b]: 7. Project Location —Coordinates, Street Address, and/or Location Description [PCN Form Blb]: Eno Cemetery Road 36.1630690/-79.1529100 8. Project Location —Tax Parcel ID [PCN Form Bla]: 9857487266 9. Project Location — County [PCN Form A2b]: Orange 10. Project Location — Nearest Municipality or Town [PCN Form A2c]: Cedar Grove 11. Project Information —Nearest Waterbody [PCN Form 132a]: East Fork Eno River (Lake Orange) 12. Watershed / 8-Digit Hydrologic Unit Code [PCN Form 132c]: 03020201 Authorization: Section 10 ❑ Section 404 ✓❑ Regulatory Action Type: ❑ Standard Permit ✓ Nationwide Permit 9 Regional General Permit 9 Jurisdictional Determination Request Section 10 and 404 ❑ ❑ Pre -Application Request ::]Unauthorized Activity ❑ Compliance ❑ No Permit Required Revised 20150602 NORTH CAROLINA Environmental Quality Water Resources Office Use Only Corps Action ID no. SAW-2021-01312 Date received: [Click to enter.] DWR project no. 20210818 Date received: [Click to enter.] Site Coordinates: Latitude (DD.DDDDDD): 36.163077' Longitude (DD.DDDDDD): 79.153211' Form Version 1.5, September 2020 Pre -Construction Notification (PCN) Form (Ver. 1.5, September 2020) For Nationwide Permits and Regional General Permits and corresponding Water Quality Certifications Please note: fields marked with a red asterisk are required. The form is not considered complete until all mandatory questions are answered. The online help file may be found at this link: https:Hedocs.deg.nc.gov/WaterResources/0/edocl6247041PCN%2OHelp%2OFile%202018-1-30.pdf The help document may be found at this link: http://www.saw. usace.army. mil/Missions/Regulatory-Permit-Program/Permits/2017-Nationwide-Permits/Pre- construction-Notification/ Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as DWR will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used to satisfy 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Attach documentation of Pre -Filing Meeting Request to this Application. Date of Pre -filing Meeting Request (MM/DD/YYYY) : 4/21/2021 DWR ID # 20210818 Version 1 (If applicable) A. Processing Information County (counties) where project is located: Orange Additional (if needed). Is this a public transportation project? (Publicly funded municipal, state, or federal road, rail, ❑ Yes ❑x No or airport project) Is this a NCDOT project? ❑ Yes ❑x No If yes, NCDOT TIP or state project number: Click to enter. If yes, NCDOT WBS number: Click to enter. ❑x Section 404 Permit (wetlands, streams, waters, Clean Water Act) la. Type(s) of approval sought from the Corps: ❑ Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Pagel of 21 PCN Form - Version 1.5, September 2020 ❑x Nationwide Permit (NWP) 1 b. Permit type(s)? ❑ Regional General Permit (RGP) ❑ Standard (IP) This form may be used to initiate the standard/ individual permit process with the USACE. Please contact your Corps representative concerning submittals for standard permits. All required items can be included as separate attachments and submitted with this form. 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑x No NWP number(s): NWP 14 RGP number(s): Click to enter. 1d. Type(s) of approval sought from the DWR (check all that apply): ❑x 401 Water Quality Certification — Regular ❑ 401 Water Quality Certification— Express ❑ Non-404 Jurisdictional General Permit ❑ Riparian Buffer Authorization ❑ Individual 401 Water Quality Certification 1e. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: * ❑ Yes ❑x No For the record only for Corps Permit: * ❑ Yes ❑x No 1f. Is this an after -the -fact permit/certification application? ❑ Yes ❑x No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? ❑ Yes ❑x No If yes, attach the acceptance letter from mitigation bank or in -lieu fee program. 1 h. Is the project located in any of NC's twenty coastal counties? ❑ Yes ❑x No 1 i. Is the project located within an NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑x No ❑ Unknown 1j. Is the project located in a designated trout watershed? ❑ Yes ❑x No If yes, you must attach a copy of the approval letter from the appropriate Wildlife Resource Commission Office. Trout information may be found at this link: http://www.saw.usace.army.mil/Missions/Regulatory-Permit- Program/Agency-Coordination/Trout.aspx Page 2 of 21 PCN Form - Version 1.5, September 2020 B. Applicant Information 1 a. Who is the primary contact? Shawn C. Sidener 1 b. Primary Contact Email: Shawn.sidener@earthcentric.com 1 c. Primary Contact Phone: (###)###-#### 1 919.563.9041 1 d. Who is applying for the permit/certification? (check all that apply) ❑ Owner 0 Applicant (other than owner) 1 e. Is there an agent/consultant for this project? ® Yes ❑ No 2. Landowner Information 2a. Name(s) on Recorded Deed: Sebastian Garner & Margaret Kiser 2b. Deed Book and Page No.: 6633/2121 2c. Responsible Party (for corporations): Margaret Kiser 2d. Address Street Address: 1017 Spike Road Address line 2: Click to enter. City: Hillsborough State/ Province/ Region: North Carolina Postal/ Zip Code: 27278 Country: U.S. 2e. Telephone Number: - (###)###-#### (336) 324-0696 2f. Fax Number: (###)###-#### Click to enter. 2g. Email Address: megskiser@gmail.com 3. Applicant Information (if different from owner) 3a. Name: Shawn C. Sidener 3b. Business Name (if applicable): EarthCentric Engineering, Inc. 3c. Address: Street Address: 204 West Clay Street Address line 2: Click to enter. City: Mebane State/ Province/ Region: North Carolina Postal/ Zip Code: 27302 Country US 3d. Telephone Number: (###)###-#### (919)563-9041 3e Fax Number: (###)###-#### Click to enter. Page 3 of 21 PCN Form - Version 1.5, September 2020 3f. Email Address: Shawn.sidener@earthcentric.com 4. Agent/ Consultant (if applicable) 4a. Name: * Michael T. Brame 4b. Business Name: Pilot Environmental, Inc. 4c. Address: * Street Address: 743 Park Lawn Court Address line 2: Click to enter. City: Kernersville State/ Province/ Region: NC Postal/ Zip Code: 27284 Country: U.S. 4d. Telephone Number: * (###)###-#### 336.708.4620 4e Fax Number: (###)###-#### Click to enter. 4f. Email Address: * mbrame@pilotenviro.com Agent Authorization Letter: Attach a completed/signed agent authorization form or letter. A sample form may be found at this link: https://www.saw. usace.army. mil/Missions/Regulatory-Permit-Program/Permits/2017-Nationwide-Permits/Pre- construction-Notification/ Page 4 of 21 PCN Form - Version 1.5, September 2020 C. Project Information and Prior Project History 1. Project Information la. Name of project: * The Preserve at Tallulah Springs 1 b. Subdivision name (if appropriate): The Preserve at Tallulah Springs 1 c. Nearest municipality/town: * Cedar Grove, NC 2. Project Identification 2a. Property identification number (tax PIN or parcel ID): 9857487266 2b. Property size (in acres): 76 2c. Project Address: Street Address: Eno Cemetery Road Address line 2: Click to enter. City: Cedar Grove State/ Province/ Region: NC Postal/ Zip Code: 27231 Country: U.S. 2d. Site coordinates in decimal degrees (using 4-6 digits after the decimal point): * Latitude (DD.DDDDDD): 36.163077' Longitude (-DD.DDDDDD):-79.153211 ° 3. Surface Waters 3a. Name of nearest body of water to proposed project: East Fork Eno River (Lake Orange) 3b. Water Resources Classification of nearest receiving WS II; HQW; NSW water: The Surface Water Classification map may be found at this link: https://ncdenr.maps.arcqis.com/apps/webappviewer/index.html?id=6e125ad7628f494694e259c80dd64265 Neuse 3c. In what river basin(s) is your project located? * Choose additional (if needed) 3d. Please provide the 12-digit HUC in which the project is 030202010301 located: The Find Your HUC map may be found at this link: https://ncdenr.maps.arcgis.com/apps/Publiclnformation/index.html?appid=ad3a85aOc6d644aOb97cdO69db238ac3 Page 5 of 21 PCN Form - Version 1.5, September 2020 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site contains wooded land and fields. The site is located in a residential area of Hillsborough. 4b. Have Corps permits or DWR certifications been obtained for this ❑ Yes ❑X No ❑ Unknown project (including all prior phases) in the past? 4c. If yes, please give the DWR Certification number and/or Corps SAW-2021-01312 Action ID (ex. SAW-0000-00000): jClick to enter.] Attach any pertinent project history documentation 4d. Attach an 8'h x 11" excerpt from the most recent version of the USGS topographic map indicating the location of the project site. 4e. Attach an 8'h x 11" excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. 4f. List the total estimated acreage of all existing wetlands on the 2.612 acres property: 4g. List the total estimated linear feet of all existing streams (intermittent 3000 linear feet and perennial) on the property: 4g1. List the total estimated acreage of all existing open waters on the 4.102 acres property: 4h. Explain the purpose of the proposed project: The purpose of the proposed project is to construct a 7 lot single family residential subdivision. 4i. Describe the overall project in detail, including the type of equipment to be used: The overall project includes the construction of a 7 lot single family residential subdivision. In order to facilitate the proposed development and access the site, it is necessary to cross a stream. To facilitate the development of the site, clearing and grading the site is necessary. Graders, haulers, excavators and other heavy equipment will be used during grading and construction of the site. 4j. Attach project drawings/site diagrams/depictions of impact areas for the proposed project. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or in ® Yes ❑ No ❑ Unknown proposed impact areas? Comments: The site was delineated by Pilot Environmental on April 28, 2021. Based on an e-mail from Ms. April Norton with the USACE on July 15, 2021, she concurs with the delineation and will issue a Jurisdictional Determination based on a desktop review. Name (if known): David Brame/Michael Brame 5b. If 5a is yes, who delineated the jurisdictional Agency/Consultant Company: Pilot Environmental areas? Other: Click to enter 5c. If the Corps made a jurisdictional determination, ❑X Preliminary ❑ Approved ❑ Emailed Concurrence what type of determination was made? ❑ Not Verified ❑ Unknown Corps AID number (ex. SAW-0000-00000): SAW — 2021-01312 Page 6 of 21 PCN Form - Version 1.5, September 2020 5d. List the dates of the Corps jurisdictional determination or State determination if a determination was made by either agency. USACE e-mail concurrence of delineation on July 15, 2021. 5d1. Attach jurisdictional determinations. Page 7 of 21 PCN Form - Version 1.5, September 2020 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑x No 6b. If yes, explain. 'lick to enter. Are any other NWP(s), regional general permit(s), or individual permit(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossings for linear projects that require Department of the Army authorization but don't require pre -construction notification. No other permits are intended to be used. Page 8 of 21 PCN Form - Version 1.5, September 2020 D. Proposed Impacts Inventory Impacts Summary 1 a. Where are the impacts associated with your project (check all that apply): ❑ Wetlands ❑ Buffers ❑ Pond Construction ❑x Streams - tributaries ❑ Open Waters 2. Wetland Impacts If there are wetland impacts proposed on the site, complete this table for each wetland area impacted. 2a. 2a1. 2b. 2c. 2d. 2e. 2f. 2g. Site # Impact Impact Wetland Name Wetland Type* Forested Jurisdiction Impact Area Reason/Type Duration ?* Type* (ac) W1 Choose one Temp/ Click to enter Choose one Y/N Choose one Click to Perm enter W2 Choose one Temp/ Click to enter Choose one Y/N Choose one Click to Perm enter W3 Choose one Temp/ Click to enter Choose one Y/N Choose one Click to Perm enter W4 Choose one Temp/ Click to enter Choose one Y/N Choose one Click to Perm enter W5 Choose one Temp/ Click to enter Choose one Y/N Choose one Click to Perm enter W6 Choose one Temp/ Click to enter Choose one Y/N Choose one Click to Perm enter 2g1. Total temporary wetland impacts Click to enter. ac 2g2. Total permanent wetland impacts Click to enter. ac 2g3. Total wetland impacts Click to enter. ac 2h. Comments: Wetland impacts have been avoided and are not proposed. Page 9 of 21 PCN Form - Version 1.5, September 2020 3. Stream Impacts If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site, complete this table for all stream/ tributary sites impacted. ** All Perennial or Intermittent streams must be verified by DWR or delegated local government Site # 3a. Impact Reason/ Type 3b. Impact Duration 3d. Stream Name 3e. Stream Type 3f. Jurisdiction Type 3g. Stream Width (avg ft) 3h. Impact length (linear ft) S1 Crossing/ Culvert Permanent Unnamed Perennial Both 11.90/15.27 31/22 S2 Dewatering Temporary Unnamed Perennial Both 15.85 20 S3 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S4 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S5 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S6 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S7 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S8 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S9 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S10 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S11 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S12 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S13 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S14 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S15 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter 3i1. Total jurisdictional ditch impact: Click to enter. linear ft 3i2. Total permanent stream impacts: 31/22 linear ft 36. Total temporary stream impacts: 20 linear ft 3i4. Total stream and ditch impacts: 73 linear ft 3j. Comments: 31 linear feet (369 square feet or 0.008 acres) of stream channel will be permanently impacted with a culvert and associated fill. 22 linear feet (336 square feet or 0.008 acres) of stream channel will be permanently impacted with rip rap that is to be keyed in. 20 linear feet (317 square feet or 0.007 acres) of stream channel will be temporarily impacted by a cofferdam and associated pump around. The total permanent stream impacts (excluding keyed -in rip rap) is to 31 linear feet (0.008 acres) of stream impact. It is below the mitigation threshold. Therefore, mitigation should not be required and is not proposed. Page 10 of 21 PCN Form - Version 1.5, September 2020 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S., individually list all open water impacts in the table below. 4a. 4b. 4c. 4d. 4e. 4e1. 4f. Site # Impact Reason/ Impact Waterbody Name Waterbody Jurisdiction Impact area (ac)' Type Duration Type* Type 01 Choose one Temp/ Click to enter. Choose one Choose one Click to enter. Perm 02 Choose one Temp/ Click to enter. Choose one Choose one Click to enter. Perm 03 Choose one Temp/ Click to enter. Choose one Choose one Click to enter. Perm 04 Choose one Temp/ Click to enter. Choose one Choose one Click to enter. Perm 4g. Total temporary open water impacts Click to enter. ac 4g. Total permanent open water impacts Click to enter. ac 4g. Total open water impacts Click to enter. ac 4h. Comments: Open water impacts are not proposed. 5. Pond or Lake Construction If pond or lake construction is proposed, complete the table below. (*This does NOT include ofFline stormwater management ponds.) 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or Wetland Impacts (ac) Stream Impacts (ft) Upland # purpose of pond Impacts (ac) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one Click to Click tL Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. P2 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. 5f. Total Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. 5g. Comments: Pond or lake construction is not proposed. 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no.: Click to enter. 5i. Expected pond surface area (acres): Click to enter. 5j. Size of pond watershed (acres): Click to enter. 5k. Method of construction: Click to enter. Page 11 of 21 PCN Form - Version 1.5, September 2020 6. Buffer Impacts (DWR requirement) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts. 6a. Project is in which protected basin(s)? (Check all that apply.) ❑x Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Jordan ❑ Goose Creek ❑ Randleman ❑ Other: Click to enter. Site #* 6b. Impact Type* 6c. Impact Duration* 6d. Stream Name* 6e. Buffer Mitigation Required?* 6f. Zone 1 Impact* (sq ft) 6g. Zone 2 Impact* (sq ft) B1 Crossing/ Culvert/ Bridge Permanent Click to enter. No 3366 2231 B2 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B3 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B4 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B5 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B6 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B7 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B8 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B9 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B10 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 6h. Total temporary impacts: Zone 1: Click to enter. sq ft Zone 2: Click to enter. sq ft 6h. Total permanent impacts: Zone 1: 3366 sq ft Zone 2: 2231 sq ft 6h. Total combined buffer impacts: Zone 1: 3366 sq ft Zone 2: 2231 sq ft 6i. Comments: Buffer impacts are associated with a road crossing and are allowable without mitigation. Please attach supporting documentation (impact maps, plan sheets, etc.) for the proposed project. Page 12 of 21 PCN Form - Version 1.5, September 2020 E. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts through project design: The applicant has designed the proposed development to avoid impacts to other streams, wetlands and the pond. A headwall and endwall are dsigned to minimize impacts to the stream. Rip rap is being keyed in to the existing bed on each end of the box culvert to maintain the current stream bed. The remaining roads and lots have been designed to avoid additional impacts to jurisdictional areas. 1 b. Specifically describe measures taken to avoid or minimize proposed impacts through construction techniques: The clearing limits will be surveyed, staked and silt fencing and clearing limit fencing will be used. Coffer dams will be used to minimize sediment discharge during construction activities. Disturbed areas will be seeded and mulched to limit sediment from entering downgradient waters. Slope matting will be used on steep slopes. 2. Compensatory Mitigation for Impacts to Waters of the U.S., Waters of the State, or Riparian Buffers 2a. If compensatory mitigation is required, by whom is it required? * ❑ DWR ❑ Corps (check all that apply) 2b. If yes, which mitigation option(s) will be used for this ❑ Mitigation Bank project? * (check all that apply) ❑ In Lieu Fee Program ❑ Permittee Responsible Mitigation 3. Complete if using a Mitigation Bank (Must satisfy NC General Statute143-214.11 (d1).) 3a. Name of mitigation bank: Click to enter. 3b. Credits purchased/requested: Type: Choose one Quantity Click to enter. Type: Choose one Quantity Click to enter. Type: Choose one Quantity Click to enter. Attach receipt and/or approval letter. 3c. Comments: Click to enter. 4. Complete if Using an In Lieu Fee Program 4a. Attach approval letter from in lieu fee program. 4b. Stream mitigation requested: Click to enter. linear feet 4c. If using stream mitigation, what is the stream temperature: Choose one NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website: (Please use the filter and select Wilmington district) https://ribits.usace.army.mil/ribits apex/f?p=107:27:2734709611497::NO: RP: P27 BUTTON KEY:O 4d. Buffer mitigation requested (DWR only): Click to enter. square feet 4e. Riparian wetland mitigation requested: Click to enter. acres 4f. Non -riparian wetland mitigation requested: Click to enter. acres 4g. Coastal (tidal) wetland mitigation requested: Click to enter. acres Page 13 of 21 PCN Form - Version 1.5, September 2020 4h. Comments: Click to enter. 5. Complete if Providing a Permittee Responsible Mitigation Plan 5a. If proposing a permittee responsible mitigation plan, provide a description of the proposed mitigation plan, including the amount of mitigation proposed. Click to enter 5b. Attach mitigation plan/documentation. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — DWR requirement 6a. Will the project result in an impact within a protected riparian buffer ❑ Yes ❑x No that requires buffer mitigation? If yes, please complete this entire section — please contact DWR for more information. 6b. If yes, identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required in the table below. 6c. 6d. 6e. Zone Reason for impact Total impact (square Multiplier Required mitigation feet) (square feet) Zone 1 Click to enter. Click to enter. :,hoose one Click to enter. Zone 2 ;lick to enter. Click fo enter " hnnca nna Click to enter. 6f. Total buffer mitigation required Click to enter. 6g. If buffer mitigation is required, is payment to a mitigation bank or ❑ Yes ❑ No NC Division of Mitigation Services proposed? 6h. If yes, attach the acceptance letter from the mitigation bank or NC Division of Mitigation Services. 6i. Comments: Buffer mitigation is not required or proposed. Page 14 of 21 PCN Form - Version 1.5, September 2020 F. Stormwater Management and Diffuse Flow Plan (DWR requirement) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers ® Yes ❑ No identified within one of the NC Riparian Buffer Protection Rules? 1 b. All buffer impacts and high ground impacts require diffuse flow or other forms of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse flow will be maintained. All Stormwater Control Measures (SCM) must be designed in accordance with the NC Stormwater Design Manual (https://deg.nc.gov/about/divisions/energv-mineral-land-resources/energv-mineral-land-permit- guidance/stormwater-bmp-manual). Associated supplement forms and other documentation must be provided. ❑ Level Spreader What Type of SCM are you ❑ Vegetated Conveyance (lower seasonal high water table- SHWT) providing? ❑ Wetland Swale (higher SHWT) (Check all that apply) ❑ Other SCM that removes minimum 30% nitrogen ❑x Proposed project will not create concentrated stormwater flow through the buffer For a list of options to meet the diffuse flow requirements, click here: Attach diffuse flow documentation. 2. Stormwater Management Plan 2a. Is this an NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? El Yes ❑x No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? ❑x Yes ❑ No To look up low density requirements, click here: http://reports.oah.state.nc.us/ncac/title%2015a%20-%20environmental%20guality/chapter%2002%20- %20environmental%20management/subchapter%20h/15a%20ncac%2002h%20.1003.pdf 2c. IS the project over an acre? ❑x Yes ❑ No 2d. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state- ❑ Yes ❑x No approved local government stormwater program? Note: Projects that have vested rights, exemptions, or grandfathering from state or locally implemented stormwater programs or projects that satisfy state or locally -implemented stormwater programs through use of community in -lieu programs should answer "no" to this question. 2e. Which of the following stormwater management program(s) apply? ❑ Local Government (Check all that apply) ❑ State If you have local government approval, please include the SMP on their overall impact map. Page 15 of 21 PCN Form - Version 1.5, September 2020 ❑ Phase II ❑ USMP Local Government Stormwater Programs ❑ NSW ❑ Water Supply Please identify which local government stormwater program you are using. GIicK to enter. ❑ Phase II ❑ HQW or ORW State Stormwater Programs ❑ Coastal Counties ❑ Other Comments: This is a LID development with less than 6% impervious surfaces. Additionally stormwater flow will not be concentrated and discharged at the site. A SWMP is not required. Page 16 of 21 PCN Form - Version 1.5, September 2020 G. Supplementary Information 1. Environmental Documentation 1 a. Does the project involve an expenditure of public (federal/state/local) ❑ Yes ❑x No funds or the use of public (federal/state) land? * 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the ❑ Yes ❑ No requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the ❑ Yes ❑ No NEPA or SEPA final approval letter.) Comments: A NEPA or SEPA is not required. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DR Surface Water or Wetland Standards or Riparian Buffer Rules El Yes ❑x No W (15A NCAC 2B .0200)? 2b. If you answered "yes" to the above question, provide an explanation of the violation(s): Click to enter. 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby ❑ Yes ❑x No downstream water quality? 3b. If you answered "no", provide a short narrative description: Additional development as a result of the proposed development is not proposed. 3c. If yes, attach a qualitative or quantitative cumulative impact analysis (.pdo in accordance with the most recent DWR policy. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? 1 ❑ Yes ❑x No ❑ N/A 4b. If yes, describe in detail the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Individual septic systems will be used to treat sewage. Additional impacts associated with sewage disposal are not proposed. Page 17 of 21 PCN Form - Version 1.5, September 2020 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected ® Yes ❑ No species or habitat? (IPAC weblink: hftps://www.fws.gov/ipac/ Ifws.govl) 5b. Have you checked with the USFWS concerning Endangered Species ❑ Yes ❑x No Act impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Choose one 5d. Is another federal agency involved? ❑ Yes ❑x No ❑ Unknown If yes, which federal agency? Click to enter. 5e. Is this a DOT project located within Divisions 1-8? ❑ Yes ❑x No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? ®Yes ElNo 5g. Does this project involve bridge maintenance or removal? * ❑ Yes ❑x No Link to NLEB SLOPES document: http://saw-reg.usace. army. mil/NLEB/1-30-17-signed NLEB- SLOPES&apps.pdf 5h. Does this project involve the construction/ installation of a wind turbine(s)? ❑ Yes ❑x No If yes, please show the location of the wind turbine(s) on the permit drawings/ project plans (attach .pdo 5i. Does this project involve blasting and /or other percussive activities that will be conducted by machines, such as jackhammers, ❑ Yes ❑x No mechanized pile drivers, etc.? If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property (attach .pdo 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Department of the Interior— Fish and Wildlife Service Official Species List from IPaC 4 listed species are identified on the IPaC report. Neuse River Waterdog (nearest identified population on the NHP database - 2.7 river miles — down stream); Carolina Madtom (nearest identified population on the NHP database - 16.5 aerial miles — down stream), Atlantic Pigtoe (nearest identified population on the NHP database - 2.7 river miles — down stream) and Dwarf Wedgemussel (nearest identified population on the NHP database - 3.07 river miles — down stream) were identified on the IPaC report. The identified populations are separated from the site by the dam associated with Lake Orange and at least one road crossing. Additionally, the identified populations are located on the West Fork Eno River and Eno River. The stream that crosses the site feeds into the East Fork Eno River before it merges with the West Fork Eno River. Best management practices will also be used to avoid sediment from entering the stream and down -gradient waterbodies. Based on the distance to known populations, fragmented potential habitat and stream characteristics in the vicinity of the crossing, we have made the determination that the proposed project is not likely to adversely affect this species.. Attach consultation documentation. 6. Essential Fish Habitat (Corps Requirement) Page 18 of 21 PCN Form - Version 1.5, September 2020 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? ❑ Yes ❑x No Are there submerged aquatic vegetation (SAV) around the project vicinity? El Yes ❑x No El Unknown Will this project affect submerged aquatic vegetation? ❑ Yes ❑x No ❑ Unknown Explain: Dlick to enter. 6b. What data source(s) did you use to determine whether your site would impact Essential Fish Habitat? Essential Fish Habitat Mapper— NOAA Fisheries Page 19 of 21 PCN Form - Version 1.5, September 2020 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data): hftp://qis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural ❑ Yes Z No preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data source(s) did you use to determine whether your site would impact historic or archeological resources? NC Historic Preservation Office's HPOWEB 2.0. Historic properties were not identified on the site. One "survey only" property is identified on adjacent property southeast of the site. 7c. Attach historic or prehistoric documentation. 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain? Z Yes ❑ No 8b. If yes, explain how the project meets FEMA requirements. There is a rise that is less than one foot. Therefore, it meets FEMA requirements. 8c. What source(s) did you use to make the floodplain determination? National Flood Hazard Layer froom FEMA Web Map Service — FEMA Panel 3710985700K Page 20 of 21 PCN Form - Version 1.5, September 2020 H. Miscellaneous Comments: (`lirlr +n a - Attach pertinent documentation or attachments not previously requested I. Signature * ❑x By checking the box and signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete, to the best of my knowledge and belief; • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time; • The project proponent hereby agrees that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • The project proponent hereby agrees to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • The project proponent hereby understands that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • As the project proponent, I intend to electronically sign and submit the PCN/online form. Full Name: Michael T. Brame Michael Signature: om, Bramerezoz,o ze, ,,az�eo 7/28/2021 Page 21 of 21 PCN Form - Version 1.5, September 2020 Proposal for Environmental Services Pilot Proposal 6754 April 12, 2021 AGENT AUTHORIZATION This form authorizes Pilot to act as our agent in stream/wetland matters including U.S. Army Corps of Engineers and North Carolina Division of Water Resources field verification and permitting. Property Address: Owner Information. Cw CJ_n Address: Telephone Number: 33 " Fax Number: E-mail Address: Mp'13sKISQreCrV1U-I� Can1 JURISDICTIONAL DETERMINATION REQUEST D. PROPERTY ACCESS CERTIFICATION By signing below, I authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) to enter upon the property herein described for the purpose of conducting on - site investigations, if necessary, and issuing a jurisdictional determination pursuant to Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. I, the undersigned, am either a duly authorized owner of record of the property identified herein, or acting as the duly authorized agent of the owner of record of the property. Print Name Capacity: X Owner _ Authorized Agent Date COY Signature 61 Orange County n' `ti *Am • K,� s[r� _�� 4 } �� f�}4�'"f'f�i'f��. 'F•-.s �+ � k's � r4��J`.'��� � r �� '� {3''y`'�"-?R�irri+'r� '$F�� '�''�'x�Y'' �,'r,,+5.•,: .'v,I s+�cG�..rd �f�...,p„' stf� •�: 'y'"4"'. k +�"�._I ��st' r�C.s'S..�,:rl.r f.�"fdyi. i',h.,:S�','.��y.',5'...`}'�.�' a�.•y,�,.:s�- ��i' .1 Sy l'..��y`• "'f 1.=• �'}:{; `} `Fi _ •,J� £ _�1� ,',k1- '1 • f' LL�r;yjt1 _.. 5. '�'. y1. xi'.� i �•��r`'�r., �` � �{ '� � r ? x.�'S .T.`: +f'• . r�i+. rr �.' J `7AF+' F. �l'f`-' ! ,'. ,y ' r }'. �'f �.� �5•F `'� '- .:' ff 'S F' �': YSs f. .;�''} _', y P. �..� yr . .fit.{: ,M1�; . 'r .�ti � 5•r�i ;'Y +�. .. +r{ ]'� f'�-` . '� fA k f .:.. {A. `fix21 T . 4 � {° ' ,�,�: n ��, : "{A - •�� .}..,.. �5 �.:l�''G� � ,.� i � . '• ��': �JJ}��;� �+tea' .;ij a.. it r 14. This map contains parcels prepared for the inventory of real property withi n Orange County, and is compiled from recorded deed, plats, and other public records and data. Users of this mepare hereby notified that the aforementioned public primary information sources should be consulted for verification of the information contained on this map. The county and its mapping compan ies assume no legal responsibility for the info rma to n o n this map. PIN: 9857487266 OWNER 1: GARNER SEBASTIAN DUKE OWNER 2: KISER MARGARET STEWART ADDRESS 1: 1017 SPIKE RD ADDRESS 2: CITY: HILLSBOROUGH SIZE: 76.25 A DEED REF: 6633/2121 RATECODE: 00 DATE SOLD: 11/06/2019 BLDG SQ FT: YEAR BU I LT: BUILDING COUNT: LAND VALUE: BLDG VALUE: USE VALUE: TOTAL VALUE: - kr. 1,44t April 6, 2021 $475,400 $0 $0 $475,400 1:3,600 0 0.03 0.06 0.12 mi I I I 0 0.05 0.1 0.2 km STATE, ZIP: NC 27278 LEGAL DESC: MAJ 16 THOMAS W PATTERSON P83/76 0WOODIAWOOPB l@74o0N'I!gd -IIBVY Kee 0E WL0) xej L t06-E95 (6 L0) auoyd ZO ELZ ON 'a uegayy ""'s "In m toe - oc9e09-Uo=I, 'OU UIJaaUI U 01J Ua JE d33rvi�rv3 �v 10—d NOI LonH LSNOO aOJlON AaVNIw1]3ad Z��HS ��n�� VN[ IOHVD H HON `A�LNn�O�D3ONVHO SJK[ad[S HV'Ifl'l'f Vl IV �aF "� 03 - � "`.@••s.. _ �'ov _ �€ 0000F a w o Q Q Q Q - a =o��Q O'F o =a �Mz� www Fo o��z =�� o �fowwUYw z mo- two 0o aid^acvao Qa000 ¢w n o o czo 0 0 0 0 �000 aa�aaiaa "000 o 00 �000 a a a a o0000 z N a 0 iww ��o ge e 0 in F m $e PE . M5 m z ¢ "r`xd� U n r�l 0004 - I �L'S� �0.K •x ac .f - o N _ oY I o 11 El El it III @ C haw w� �o �w� oo'aAuOOWBe ]@7gooN'I!gd -IIBVY - - KeC P0E (6L6) xej e33Ni�N3 �vdioNidd nVld NOILHOL130 Ltos-ese(s�sl auogd Sn[OI,LIQN00 ONI,LSIX3 - - ZOCZeON'—gayy '_'Is *0 m toe aNI.10HU HIHON`AINOD3ONeHOf 969e09-U—] ` aOJION navNlwn3ad SJK[adS HV'yf1'y'pVl IV w auk uuaaui u3 aialua�ulas3 HAUHSHdd °. o aAua�4ue3@7400N'I!4d -PIVY2 - � "�� : - "`.@••s.. 4EZE-40E (6L6) xej d33Ni�N3 �vdioNidd _ 4 �Wo,' T L P06-C99 (6L6) auoyd NV'Id HIIS ZO ELe ON'auegayy laa4S Relit 'M toe aNII-10HU HIHON `AINlOD3ONVHOft _ -- -- w d tOd lON069e09-U AHVNIA111Hd SYKnadS HV'yn'y'pVl IV 'OU UIJaaUI U 01J Ua JE I 3 I DUI 3 �Ai[�S�2Id �HZ o�¢oM o au]ua�4Ye3@7gaoN'I!gd-IIeW-3 - "�� - Veee of (6L6) xej _NgN3 �vdioNidd Lt06-c 9WL6) auogd 'a NVId HIIS - - s O ZO ELe ON uegayy ]aa4S*0'M toe NOiionHISNOO VNCI0HU HIHON `AIN[lOH 3ONVHO s -- - _ e el9e-0 ga U—] UOd lON S'DK[adS flV'Ifl'l'fVl. ,IV e oo°000 � w 'OU uuaaui U O1J Ua JE I 3 I DUI 3 AUVNIWI13Ud �Ai[�S�2Id �HZ o�¢oso oo'aAuOOWBe ]@7gooN'I!gd -IIBVY " - 4EZE-40E (6L6) xej d33Ni�N3 �vdioNidd mvZd Z0HINOD L�(OI�'OHH ''? L 406-E95 (6L6) auoyd 'a H`.�VKIVU(l KaolS 'Dmfava) ZO CZe ON uegayy loo4S *0 m toe 3ONeHOf aNII-10HU HIHON `AINlOD 'l'pVl 9E9e09-U—] ` aOJION navNlw1]3ad SYKnadS HVHnIV auk uuaaui u3 aia�ua�u�as3 HAUHSHdd °. 1 o oa'au]ua�4Ye3@7gaoN'I!gd-IIeW-3 _ - Veee OE (6Lo) xej _N N �vdioNidd 09+4T :V,LS 01 00+OT :VIS Ltos-ese(sLslaoogd Nl dHlN3ddV0 :THAOdd 2' NV'ld ZO ELe ON 'auegayy ,_ls ReI0 'M toe N0 lOfltilSN00 VYN�I.10HU HIHONI `AINOD3I DNVHO -- 969e09-U ald tiOd ION S,./K[adS HV'y1f1'y1'1p Vl V 'OU UIJaaUI U 01J Ua JE AHVNIV41]]Hd- I 3 T o 3 HAUHSHdd HHI ogeo¢o NO+VAIII w= I 0o r e .a ae � II v oa'au]ua�4Ye3@7gaoN'I!gd-IIeW-3 - VeeE-4OE (6Lo) xej u33N N �vdioNidd 00+4, :V,LS 01 09+/,T :VIS _ LP06-o99 WLo)auogd jNl 'drHf,NHdHVJ :THAOdd 2Y NVZd ZooLe ON 'a uegayy laa4S *0 m toe NO lOfltilSN00 VYN�I.10HU HIHON `A�yIN[�lyO�Dp 3yONVHyO �aF -- -- w o69e 09.—a,d tiOd ION AHVNIV41]]Hd SJK[adS HV 1f111Vl IV _'� - 'OU UIJaaUI U 01J Ua JE I 3 T o 3 HAUHSHdd HHI _ ogeo¢o _ Noiivn313 es'z�e :ao�e pi / / HO'b£9 '3JA3 jz £Z'L£9 �3003 / / / i i / i NO11VV313 WOO DIAWOOPBe l@74o0>1 lqd -IIBVY - Kee 0E WL0) xej e33Ni�N3 T/10—d Z/ +Ec •VLS OJ 00+/.Z •VJS Ltos-ese(sLsl auogd API 2dHINHdHVJ :3'IIdOdd 2' NV'Id ZO CZe ON 'a uegayy ""'s "In m toe NO lOfIalSN00 VYN�I•IOHVD HIHON `AIN[OD3I ONVHO -- w 969e09-Uaold aOJION SDHV'y1f1'ly1'1p Vl V 'OU UIJaaUI U 01J Ua JE AaVNIW1]3ad / NOILVAIII y r I Q' 1916 +11 :11A9 / 1 a z � / nss s I ess I I m n I ;I � I ' I I I ass. 1 / —Z jl�� A111 11 11+1� dl�-�4� X P"r war I ^✓... r p i --- NOILVAIII x m rvl zz a � a r 'au]ua04Ye3@OgaoN'I!gdIIe- W Veee xej _NgN3vioNd0E6L0) iI+80 •Vis 01 00+00 •VLS _ =- sLtos-eesLsl auogd CVM VLnIN3I30id nVId - ,aUe ON agayy a4S *0'M toeNOIOf 0 00 VNCI0HU HIHON `ALN OD 30NVHO s" ea elseOga] HOJ IONoa AUVNIWIl3Ud DdlI e oo°000 � w 'OU uuaaui U 01J Ua JE I 3 1 �41 3 HAi][HSH2Id HHZ NOLVA313 o �°�eeNaep<'si srys�o s s Po f��'M4 0 N �OLVA313 WOO 'aAua04ue3@74u°N'1l4d-IIeW-3 PCeC Pos (6L6) xed �wzw3doN- Hoo—Hd e33rvi�rv310—d i ONPIQNVH S'IVIHHIVK (INV - _ - - - LP06-C99(6W auogd mollvZCIIHVIS (MlOaD INOON zoeZznN'auegaW —is *0 M toe l' NOIlonHLSNOO aoJION Vn�[louvn [t,euon[ `.c,en[non aon[euo _ - ��I SUMS HV'IIITIVl IV- ` AHVNIw113ad out uuaaui u3 oialua�4UE3 HAUHSHUd NHL o�¢o¢o x .3 o .a3e 5k9€s4e - w "-�' s ° s o a c o ° 10 o. .3 ° 3 3 m o c ' 5° 0 wm ��" o„ 'v3 3° - w °Y '0 3 >O a7-_ .V ;: xm > s � o � _ `o $ w 3 `v o v a >' 3 ms E � o F, m on 10 w 3 >, -o v ° 0cc '0 �s oxn .E v � � x O Y f r w - - m _+J, cc «> o i 0- O v °-mom v" v v 3 o 0 o m a o w w xw _ --EW m `o oven m o a; m o -o - 3- i_ - °0. w W. E a o �E j `° v ° -60 = a o `m � o a« s w w w m o r n v _ 1-2 wm _ ° 3 a " " '�° 'm 8 lei€ °a ` a m �,0 -vo v a o w _ 0 3 _a o v _ w SO " 3 tf 5$ w -O m '1 o sox `o w> o - w LL a o v w o V o N o R wuu L o L `m g s N 3 v �-`o 3 3 3 O `m °"o.� m E wu oms O m w w s - s w v v m„ o a _ w o° f vpp w v E` V a° � m E o o w 0 ', s m w s m 3 O �_ ° a- E x xo `a m � E 0 3 v w 0 oxn E a 0 0 Z $ m ° E xw ° `o m w ° a ° Q 3 s 'o o �a Z m" „0 «.� �-- - - - - - >o m 3 v xm 10 m o.. m in v� v 3 `m �_° o� �o ms a`o "E«+.««oo sw�3o w=O www a O m 10 €. °s °o �m`v °10w ��«°°��s3vwsa 'm >m>o-vE u o- _L'a w3 F °'o w wv 3aE vE-"' �N w 3s°° 3vo°-nva°_v3v,. °E� a�oa`-'m°v Qa E- c 3 on x°-`w- E a° w >o= 'owa?s 3 o s v w _m- w3v c? c w c 5 m - ., - ., in w w c aN I--) 9� zOoxm�=a�m2«Ow-ma Om.-°.°xwm ��a>O°aa� o `o2 mu oR0 o �C Z S 6 L81_F ONN m 1 xNQN LLL�eiii�r "' Eu SwIS lw s v `Y' o -o ay1 E o a - ---2 - m `v x o 0c _ E o 0 0 `v Ic `�>wo.3 $ `o v 3 �w= 3 E= �Ev _ 'O m E E v v_ o a '� yo v -o _ m o I--j N _ m v$ s m = s v °- m m�' v - E w w ' w -m3o v 3 0 '- 3 = ° o m- 0 c o w? s 3 o - m m s On rTl W o o m m o w w s �, o °o. E .a, " +' 0m w c o w 'o w3-Oa -`o Eu --°m m ° °' won - _ o a m w w E. a E - moo ° w a o w 'o o f � m O> o m E oxn o o m ° a ° v m c v O _ E _ `a.N mE E?-m m ° v - 2 cw zO' - w s w_ - � o - - - ?� o-Oo ° m v ° y - C 'o - o ° m > a ' 'o ° o _ = V E O x m w > `o w w m m « w o m m v m v m x v w ° w - z-vo'm`m �m �w 3` m o 3 - y m -«0 m.o o vE ° o-m m"o Qo[i ao w�ov� -- vxs w�3o v�"�°oa �v ��"v Y mmoav mvo uE `v U `w0u - w m o 3m`m -o ? -cam a - o _ E',.o`o =C m, u F ow N ° om- r ~� m- .2 _ w z.2 w m a? � N 0 0 w s 0 .3'i� .3w - Q « O- - -o a O a > s - w m w 0 w - _ w g v 8Y g °"-" <<° = a — vo30 v �Zma- y'a E« zry W. -` z'- 03= z v vy- o�s E ms- °� o v N>o 03 oa- v° u° N m v 2 �_ - -_ �o Qm Eo 3 0 ° °Cao o o `�`o 'o O -m - m`w -- w;° a oEw _ Q v v v m y _ - O x s w _ = --- o w3�o-s- �$ -3 - «so �� = '°° $`mom <u ° 30 w -0 C o Q �' _ o o v o a 3 o v v> O m 3 E m w« y a W. o 0 3 = Y y >o z>- a3 mO-= 17000 �_� N° tu �°� =ESN-xLo wr3�w -`m0 `w Yy�m o°'A°°p--_ Q o N c y= O °o- w m o v a u0 2 0 � m o m o F v- C m 0 w w o a' w" 3' 3 �- 3 w m 3 � 3` O m z x- w w m E� ` ` a a; w w �-o s u m aa' O m `w ;° ;° t w= E m on -°"._ N a N 3 w °_ w __« ovn 00_ v m m v z '� w m s a s> a o m a s m` O m> 2 m a m o N 0 0 O O v 0 2 0 O z s 2_ 2 O o a _ u s W z w° 3 ° w u° ¢ „E, ° D O F O 3 u u a Q o xo ° m m w n 3 m � Z �, 6 K,4r� m , 6 �o m 4N m 4 .1 oN m ma � x 0 o 3 a F ` o Y= s_- wu - x0 w o-2 v 0 w ` - 3 3 °°° n� - O n U t E - U p aLC O `gym mNO E aQ EO`� .3o�o. xo' mE'° - ° - VE 5 -vox �wvvizy V N O ._ o E 3 au NOOw n - a - «gym-w O xEx _ �nm O� x m w m m� -E aLEw -O dow �x�3����z - vo o vE-O TO E„ 0 W. c -w m U _ oma �-mox- = 3 .. 1. z o 3 a.3 0 lw _ m� ° O v Qa 0s mQ ° `o ' t' °«°os o o 'o m 00 ' z 3 O E E u o z w -xo p _ - wx � z w 3ow x°- = Q - m o z r- 'm o 0> Q s s 3 3 OJ s w v `o 'y SO `O V 0 2' z wu O 17��� -� aO N _ �p� LL o Uc3 _ Go `o p m E o ZVO�Om Q _ o Q z x O s o - o o- N w o _ "" ono wuw O u '- w u -Im m O m = O w a -wu a �z `v •''s �� O z E c on `w x0 `- �- z �' o "- �= 0y o m `m v `m `m -O° x= xo _ u o' °'vo 0 - m m o a x - a0 $Z= 06, - o m Q oonL E 2'2ooEm oENv o.V O O w _ O O 3cY o o v w Gv- os F s _ a z_ a Z w o O ¢-° m m Z N oxz° 3aa Q u Q Q i O O O z w w x-_ O=- y - l7 H `Y' V a E Z o`n l7 in xa �— O Cn„ 3s 3s v O O o � oy � Z z o � m 0,E� E N O w E °3aE � LL o ° `w E`o H m � U a m `o a - m r m v L 0 O 'v w - c uiEv� z 0 .a � - s o � w v o o" � � � m N Q` EvE `w3a ._ x s o,� m N w ¢ w WOO 'ailuO0gYe3@7qu0N'Ilgd -IIBVY - - roeze-rooe(sLs) xeO e33rvi�rv3 ivdi0rvied ONI,L2IOd32I QNV 9NId33xQ2I0O32I - �{ L P06-C99(6W auogd 'M0llJHdSNI—A'IHS zoeZzON'auegaW 100AS *0 'M 40z NOiLoniLSNOO aoJloN VN1Fl0HVD HIUONI `.INMOO ADNIVuO _ - AHVNIw1]3ad SUMS HIITI V'IV�, Z� ��I r= °� - out ` uuaaui u3 oialua�4UE3 1��S�2Id NHL oMm =d� v mg v°o"3- fE a m3 c c cr _ v„ 8 o 5 o - g � - m���Ea°cE - 6 E E °E � B o o E oE 4 - E o � - m���Ea°cE - 6 E E °E � B o o E oE 4 - E o WOO a_i1u00g1Je3@7ga0N'I1gd -l1BVY e33Ni�N3 ivdioNied - 4eze-4oe(s�sl xed S'IIV,L3Q �400-609(6W aoogd 'fozliKOO NOISMH zoCZeON'—qaW NOiLoniLSNOO VN['I0HVD HIUONI `XIN OD a0NVu0 - - w 100AS Rely 'M 40Z _ ao�loN SMUMS HV'IIITIVl IV- AHVNIw1]3ad out ` uuaaui u3 oialua�ulas3 1��S�2Id �H L Fz 0. M EffiE - x e �n U mA a I F W ----- ----- ------- ----- \ 8 a Y V - - -------- z o H _ d n GG° Goo o w v—r x a z- 000000 z rffa o ea - 000000 w z rI >mi a a 000000't. z 00000"00 0= Iffx� _ 0000 z 0000001w F - a - 000000 0 z - w 000000 F1, a o E. qp- 0. 'a _ m - - Z x a w may ma ma a, - F�< a w F WOO aJ1000 Ye3@7ga0N'Iigd Ileyy-3 e33Ni�N3 ivdi0Nied - 4eze-4oe(s�s) xed S'IIV,L3Q �400-609(61.6) auogd f0z11K00 NOISMH zoDZeON'—gayy NOiLoniLSNOO VN1F10HVD HIUON `XINnOD a0NVu0 aai- - w llS Rely 'M 40Z _ aoJloN SMUMS HV'IIITfVI IV- AHVNIw1]3ad 1111 All out ` uuaaui u3 oialua�4Us3 1��ST2Id �H L �i z �o o ae= m F oN�oVo y� z e Y�p�o 5 W G] ig— W W m� II I 1 I b o a r =po= U g, �G O m w o � o � Y --- CD In s/ O � wYo - in -a - oYz 04 ppp. a z cn �j t� o z �l a w & I I 0 m a a a = i _ g x w � Sad aye 0 of I� s a6 � Ey m � x WOO H00— ,� _a» _, , , - _ - pCeep mw w s am .w>w_, ««+n+se! - vonH L :v, _, :'X a ^ toe ° :g&mas��nz1`�(�) HAUHSMd HHI,1111 All \ \ ; 2l / §))/| ||QQrJ. a §- ..§0 j(( ( & LU LU _ z= - w m V _ - LL , o v 9 �. 20 | . 4 ,m �- 4 \ � \ ! �\ �. ) .E ) / _ N� OD �� 1 - v V A A J V A v II o0IC Now �� \ \ z� -_ cn m0 \ z _ N-0 cn CD 1, 1 1 \ Oy (nr Cu _� m D 1 m0 100 PEAR FE MA 1 v \ �z mcn-x 0 �C ZN=� FLOOD PLAIN \ orcn 0 z N 1 I\ m0D NaroDp + �I 0 \ — /PI: 21+28.81 p DD ZONE 2 _mm ar-*O ZONE 1 — • \ 625 • STREAM 2, / I \ 625 o _ ZONE 1 i ZONE 2 ' i C i I 011 m Cn 100 YEAR FEMA 1 I — — — — - ,' cn z-0 z z z m N FLOOD PLAIN 22 N j z y 0�(n�(n «W C. 1 vri �C N0 _u > 0 - m r=< mom OBI Z �Drpr C Z O _n m I _ Wm m.. �Dmpr rn m X Z� 1 SOD fn;u / C N p —G7 1 D �— Y �ZOZL NN�� Cn 1� I G$� z� mpZ Z � Un (p�D \ 1 I'**110 — D20p0 J rCa 1 rm 1 — 00 m> >C ^ n � on x Dr II _ Z� rpm-� r O N� �I + C m.. 0r� m 0 N n E! DX(n �7D2 ; --_ DI r- 0 m ;u D K r < > O �- =U)CM0 � 0 M zm �1 i yr ��<�z mmmm � �z _ _ A ��—_cnr.— zm.zC/) �� C0 m t� D-n 9�9 DATE: 07/01, 2021 THE PRESERVE AT TALLULAH EarthCentric Engineering, Inc. HORIZONTAL SCALE: 1" = 40' Licence # C-2638 PROJECT MANAGER: CPK ORANGE COUNTY, NC DRAWN BY: CPK 204 W. Clay Street PROJECT NO: 20-17 Mebane, NC 27302 DRAWING NAME: 20-17 WORKING EXHIBIT 1: BUFFER IMPACTS Phone: (919) 563-9041 • •^� Fax (919) 304-3234 DRAWING REVISION: 0 TO RIPARIAN ZONES E-Mail: Phil.Koch@EarthCentric.com I � NAD 83 (2011) I A Z v r D o� Nr- m 100 YEAR FEMq FLOOD PLAINI cKZ m I D mcsIVWDp;u;u o PI: 21+28.81 — aom r`s0�- mm v� ZONE 2 �. v°D> > . \ ZONE 1— I I — I 625 i STREAM �. - c _ _ - _ = _.._.• 6 25 — ZONE 1 CI I � ZONE 2 i ,I I I mom �mD-0 290C r.vn0 -or rD mm MA202 _ D W j �XC� ��CD I— Dim— KRZ(n «K00�C I — I (700� yyNr� \Zci>��I ���0d wDz*;�100 YEAR NA o R> -jC0 FLOOD PACn On 0) cr �� � Z� � y> m0m0 m0 ��D r CC) CA Ln m2oDC M�X rV�K �WMr0o4 gD �0 D �L4 v <*0m (0 u 0) co 0 � — rm�D �m O 0K(n - < 71 N 0 z Z� U)Cm0 _ca O I O z Z�ZrKZm�mmm >M pr 00 >�� o"� m — i m� N� y�� 00 0 (/) Z D -- z D -n C vv 0 OD — m Z D Z v DATE 07/01, 2021 THE PRESERVE AT TALLULAH EarthCentric Engineering. Inc. HORIZONTAL SCALE: 1" = 40- Licence # C-2638 PROJECT MANAGER: CPK ORANGE COUNTY, NC DRAWN BY: CPK 204 W. Clay Street PROJECT NO: 20-17 Mebane, NC 27302 DRAWING NAME: 20-17 WORKING EXHIBIT 2: STREAM IMPACTS Phone: (919) 563-9041 • •^� Fax (919) 304-3234 DRAWING REVISION: 0 (NO GRADING SHOWN) E-Mail: Phil.Koch@EarthCentric.com I N v \ Cr Nrm 100 YEAR FEMq FLOOD PLAT c z iv Q . D N I a (� 010C)m m r.p ONDD �� PI: 21+28.81 — — aommar*�jmm N�z��� ZONE 2 VX I I ZONE 1 I I 625 i STREAM (A: 62S o w ZONE 1 / CIP _ I � _ I ZONE 2 i D-or I I mom I �vn0 -0> D p 0� W Z �xC� ��r� I— m — D 'i m ZDn 7nr-m OD�D<D OZ m C.p U OON�100 YEAR AO D Cr' cOD PLAINN r�� >0moOZm Zz pp M� rr � D=Omo 4� U' @r-co I D (A �m-T1�m �r.�oOro I �� �Oy \\ \ mD DC . 00 =�OC/M�n x rC— 4 p� ^WO0^Wom rOZv {*OENr O -nm r- m Dc— *=D m2irnm� D t00 01 _N �C mKCD 0 70 OD� (l C I <OZCam, �Zr ZmMmm Z >M r 00 > O I mN�� m 00O r � N 0 0) 0) OCD ;u ) m Zm ' `DDo ���D0—0 D ozD i C ccD n 0 m Z Z rD DATE 07/01, 2021 THE PRESERVE AT TALLULAH EarthCentric Engineering, Inc. HORIZONTAL SCALE: 1" = 40- Licence # C-2638 PROJECT MANAGER: CPK ORANGE COUNTY, NC DRAWN BY: CPK 204 W. Clay Street PROJECT NO: 20-17 Mebane, NC 27302 DRAWING NAME: 20-17 WORKING EXHIBIT 3: STREAM IMPACTS Phone: (919) 563-9041 • •^� Fax: (919) 304-3234 DRAWING REVISION: 0 (WITH GRADES) E-Mail: Phil.Koch@EarthCentric.com D# * 20210818 Version* 1 Regional Office * Central Office - (919) 707-9000 Reviewer List* Rick Trone Pre -Filing Meeting Request submitted 4/21/2021 ................................................................................................................................................................................................................ Contact Name* Heather LaGamba Contact Email Address* Project Name* Project Owner* Project County* Owner Address: hlagamba@pilotenviro.com The Preserve Tallulah Spring Sebastian Garner/Margaret Orange Street Address 1017 Spike Road Address Line 2 aty Hillsborough Postal / Zip axle 27278 Is this a transportation project?* r Yes r No State / Province / Pegion NC Country USA Type(s) of approval sought from the DWR: * 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express * Individual Permit F Modification F Shoreline Stabilization Does this project have an existing project ID#?* C Yes (-- No Do you know the name of the staff member you would like to request a meeting with? Sue Homewood Please give a brief project description below and include location information.* The applicant does not request a meeting. The applicant may submit a request for 401 WQC. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature r 0. .61 r�+.A,, Submittal Date 4/21/2021 IIJ Drawing USGSTopographic Map Cedar Grove, NCQuadrangle � Scale: 1"=2�000' 0 LEGEND Site Boundary USGS Topographic Map Approximate 76-AoreTract Eno Cemetery Road Cedar Grove, Orange County, NC Pilot Project 6754 '.r 7!'r Drawing 2 USDA Web Soil Survey of Orange County, NC F11 I7, Scale: 1" = 500' PILOT E N Y I R 0 N M E N 7 A L. I N C r .,.y E • � *� Mrs I µ LEGEND Site Boundary .M Web Soil Map Approximate 76-Acre Tract Eno Cemetery Road Cedar Grove, Orange County, NC Pilot Project 6754 Drawing 2A USDA Soil Survey of Orange County, NC Published 1977, Sheet 6 Not to Scale j z PILOT P I L O T E N V I R 0 N M E N 7 A L. I N C Published Soil Map Approximate 76-Acre Tract Eno Cemetery Road Cedar Grove, Orange County, NC Pilot Project 6754 Drawing 3 USFWS NWI Wetlands Mapper Scale: 1" = 500' r PILOT P I L O T E N V I R 0 N M E N T A L I N C r �5 k ' a LEGEND Site Boundary Freshwater Emergent Freshwater Forested/Shrub Estuarine and Marine Deepwater Estuarine and Marine Freshwater Pond Lake Rivenne Other r NWI Map Approximate 76-Acre Tract Eno Cemetery Road Cedar Grove, Orange County, NC Pilot Project 6754 At A _ +►�. Drawing 4 FEMA FIRM Panels 3710985700K Effective 11.17.17 Scale: 1" = 500' s } V LEGEND Site Boundary 196.Annual Chance Flood Hazard Regulatory Floodvay Sped al Floodvay Area of Undetermined Flood Hazard 0.29(.Annual Chance Flood Hazard Future Conditions 1'/¢Annual Chance Flood Hazard ► Area with R educed Risk Due to Levee y �FEMA FIRM Approximate 76-Acre Tract Eno Cemetery Road PILOT Cedar Grove, Orange County, NC PILOT ENVIR0NMEN7AL,INL Pilot Project6754 FLAG NUMBERS/INFO WETLAND FLAGS = STREAM FLAGS =ZA WF 1-55 1.347 Ac. LEGEND Site Boundary 0 Wetland Pond Perennial Stream SA 1-5 Flag Number/Feature ID DP-1 Q Data Point WD 1-17 0.895 Ac. WE 1-5 0.054 Ac. THE LOCATIONS OF FEATURES SHOWN ON THIS MAP ARE APPROXIMATE. THEY WERE VERIFIED BY MS. APRIL NORTON WITH THE USACE VIA DESKTOP REVIEW (E-MAIL FROM MS. NORTON ON 7.15.21). THIS MAP INCLUDES GPS LOCATIONS OF DELINEATED FEATURES. Drawing 5 Wetland Map Aerial Imagery from ESRI Approximate 76-Acre Tract and Pilot Field Notes - - Eno Cemetery Road Scale: 1" = 500' PIL01 Cedar Grove, Orange County, NC Date:4.30.21 PILOT ENVIRONMENTAL,17NC Pilot Project6754 HPaWEB 2.0 Gene al Audience w a�,a ..■i mtp " T� �� Egg ;ET_= • � �+•T' a 7I'll.. tT is " � ]9.1gg16] l.`..FSFn(s1 F%r•:'... .. _ r CA -in ® esn D# * 20210818 Version* 1 Regional Office * Central Office - (919) 707-9000 Reviewer List* Rick Trone Pre -Filing Meeting Request submitted 4/21/2021 ................................................................................................................................................................................................................ Contact Name* Heather LaGamba Contact Email Address* Project Name* Project Owner* Project County* Owner Address: hlagamba@pilotenviro.com The Preserve Tallulah Spring Sebastian Garner/Margaret Orange Street Address 1017 Spike Road Address Line 2 aty Hillsborough Postal / Zip axle 27278 Is this a transportation project?* r Yes r No State / Province / Pegion NC Country USA Type(s) of approval sought from the DWR: * 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express * Individual Permit F Modification F Shoreline Stabilization Does this project have an existing project ID#?* C Yes (-- No Do you know the name of the staff member you would like to request a meeting with? Sue Homewood Please give a brief project description below and include location information.* The applicant does not request a meeting. The applicant may submit a request for 401 WQC. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature r 0. .61 r�+.A,, Submittal Date 4/21/2021