HomeMy WebLinkAboutNC0043320_WWTP Inspection_20041209Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
December 9, 2004
Mr. Paul Smart
Burlington Industries LLC
PO Box 250
Cordova NC 28330
SUBJECT: December 7, 2004 Compliance Evaluation Inspection
Burlington Industries LLC
Burlington Industries LLC - Richmond Plant
Permit No: NC0043320
Richmond County
Dear Mr. Smart :
Enclosed please find a copy of the Compliance Evaluation Inspection form from the inspection conducted
on December 7, 2004. The Compliance Evaluation Inspection was conducted by Belinda S. Henson of the
Fayetteville Regional Office. The facility was found to be in Compliance with permit NC0043320. The
cooperation of Mr. Paul Smart, ORC and Ms. Dorothy Quick, Backup Operator were greatly appreciated.
As a reminder preservationof the Waters of the State can only be acquired through consistent NPDES
permit compliance.
Please refer to the enclosed inspection report for additional observations, comments, and recommendations.
If you or your staff have any questions, please canine at 910-486-1541.
Sincerely,
L1ocJ 41e
Belinda S. Henson
Environmental Chemist II
/bsh
cc: Central Files
Fayetteville Files
NCDENR Division of Water Quality 225 Green Street -Suite 714 Fayetteville, NC 28301-50431 (910)486-1541 Telephone
(910)486-0707 Fax
Customer Service 1 877 623-7748
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection
1 INI 2 U 31 NC0043320 111 121 04/12/07 1 17
u
Type Inspector Fac Type
20I
18ICI 19151 Li
u u
u
Remarks
2111IIIIIII111III1IIIIIIIIIIIIl1IIIIIIIIIIII1III166
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
671 169 70 IJ 71 U 72 U 11 174 751 1 I I I 1 1 180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Burlington Industries LLC - Richmond Plant
740 Old Cheraw Hwy
Cordova NC 28330
Entry Time/Date
10:10 AM' 04/12/07
Permit Effective Date
04/09/01
Exit Time/Date
12:45 PM 04/12/07
Permit Expiration Date
09/02/28
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Paul Robert Smart/ORC/910-417-2207/
Dorothy Lorraine Quick/ORC/910-997-5001/
///
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Paul Smart,740 Cheraw Hwy Cordova NC 28330/Plant Contacted
No
Engineer/910-997-5001/
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self -Monitoring Program Sludge Handling Disposal • Facility Site Review Effluent/Receiving Waters
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) ' Agency/Office/Phone and Fax Numbers Date
Belinda S Henson v4 ,/ IIEJYiaC-i0 FRO WQ//910-486-1541/910-486-0707 I — Cj — Q 4
Signature o „- . semen/• 7eviewer Agency/Office/Phone and Fax Numbers Date
Paul E Rawls i 910-486-1541/910-486-0707 12 - r C)' O1
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
NPDES yNmo/day Inspection Type
31 NC0043320 111 121 04/12/07 117 18 I
(cont.) 1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
The facility has field parameter certification #5061 for the following parameters: pH, DO, Conductivity,
Temperature and Residual Chlorine. Microbac analyzes the remaining NPDES permit parameters with the
exception of Toxicity, which is completed by Pace.
Laboratory records were reviewed for the months April, May and June 2004 and compared to Discharge Monitoring
Reports (DMRs). All records reviewed appeared to be accurate.
A compliance report for the period September 2003 through September 2004 revealed one weekly fecal coliform
violation in November 2003. The facility received a Notice of Violation from our office.
The following recommendations were noted during the inspection:
1. The return pumps appeared to have paint worn from the surfaces. These areas should be painted in the near
future to eliminate major repairs in the future.
2. The 150 pound chlorine cylinders should be labeled empty or full.
3. The grass that was located on the surface of the digester liquid should be removed to assist with
maintaining the units in the plant.
4. The generator should be tested more frequently and documented.
DOOM
❑ ❑❑■
❑ ❑❑■
❑ ❑ ❑
❑ ❑ ❑ II
❑ ❑ ❑ 11
D ❑ ❑ ■
O 001.
O 0011
O 001
O 0011
❑ ❑ ❑ •
dN VN uN sal.
O 001
❑ ❑ ❑ •
O 001
O 001
0
dN `dN uN sal.
0.00
0.00
0.00
❑ • ❑ ❑
0.00
❑ ■❑❑
❑ • ❑ ❑
O 1100
dN VN oN Sal.
❑ ❑ ❑ •
❑ ❑ ❑ •
dN VN uN sa.l
O 001
O 001
❑ ■ ❑ ❑
O 001
❑ ■ ❑ ❑
dN VN uN se.l
6 6uoiinq;o awl eoeJJns ay; sl
Moog u!d/spllos an!ssaaxa;o reap MOI;.leno ay; si
6(eouaingJn; Mol) alge;daooe a;ei wn;ai ay; si
Lalgeldaooe lane! lNuelq e6pnls ayl si
61euogeJedo;lun OAIJp ay; si
6e6pnIs 6ulleog enISseaxa;o owl Ns ay; s!
Leienbepe lenowe; wnos sl
66uglnano-pots;o eouepina;o pail Ns ay; sl
6e6e3loolq J!em )o awl ells ay; s!
Uanal SJ18M GA/
6.teiwep Jeinoip jo IIaM lepuaa u! spllos;o dnpllnq en!sseoxa;o awl ells ay; sl
6ieleMalseM snwopo pue >peiq;o awl Jaguep ay; si
aaguel� raupuO)e
:luewwoo
6uol;Ipuoo pooh u!;Iun ay; s!
6eouelldwoo u! 6ulu99Jos;o lesodslp si
6sugap anissaoxa;o a0J; UOOJOS all SI
6sugep 6u!uooJos /la;enbepe sJeq ay; aiy
Ieoluegoamq
lenueyAe
uaans Jeq;o ed/1
suaa.1oC
;ueld ay; ow! pa; /l;IneJ6 s! Mog luengul :;uawwoo
6IeuogeJado pue a gellene wuepe lensin pue Nuns si
Lleuol;eJedo pue algellene ti;awalal vayos sl
6olgeJedo spi;uoo;eoil a.y
6aigsjedo sdwnd tie 8Jy
6luesaad sdwnd Ile aJy
LeseoJ6 enpsaaxa;o 004 IIeM;aM ay; sl
6alge;deoae 6uideo osnoq leJeua6 ay; si
,sawn;onils Jo soul! ssed/q;o awl Hem;em dwnd ay; s!
luenllul - uoilels ownd
'Mahal Jo; aag;o mo of peXe; OJaM spJooei •
Awe; pue aaueualuleo; •slaplo )IJ0M peleieue6lalndwoo g6noly; l;els /q pe eidwoo sI eoueualuleW :luawwoo
66uidoojesnoq alge;deooe yl!M ueep Alleieua6;ueld ay; s!
6sllem to 's;ld 'slue; JOAO SJOAOO to punole slum se tons amid ul salnpnlls Ala;es lelaue6 anal!weld ay; sao0
aoueualuieini g suugwadG
:;uawwoo
6uo!loedsul Jo; Seale lie o; ssaaae pa;uel6 Joloadsui atl s!
6ollgnd lelaue6 ay; o; peloplsal a;is weld ay; o; ssaaae si
awied ay; lo) suol;lpuoa lelaads Aue play; ply
6;Iwied ay; u! pequasep se Allilae; ay; si
6uol;ealldde Mau e pepiwgns eon wJed ay; seH •(ssej to sy;Uow g u! sal!dxa ;pied ;uaswd eq;;I)
Hulled
uoi;enien3 eoueiidwo3 uoi;3edsui
weld puowyoN - 011 sep;snpui uol6u!IJn8 - m-11 sap;snpui uol6uiim9 :l(;iiioed - JauMO
bO/LO/Z6 :e;ea uoi;oadsuii
OZEEb000N :;iwied
Permit: NC0043320 Owner - Facility: Burlington Industries LLC - Burlington Industries LLC - Richmond Plant
Inspection Date: 12/07/04 Inspection Type: Compliance Evaluation
Secondary Clarifier Yes No NA NF
Comment: Sludge depths were approximately 1 foot. The effluent appeared to have a cloudy color. As per Ms. Quick,
the cloudy (milky) color appears when the industry discharges vats of what they call Size which is an agent that assists in
fixing dye into the cloth for the facility. During the inspection, I observed the cloudy (milky) color discharged in the
influent.
Pumps-RAS-WAS
Are pumps in place?
Are pumps operational?
Are there adequate spare parts and supplies on site?
Comment: Facility has three (3) return pumps. All return pumps are operational. A recommendation would be to paint
the return pumps in the near future to eliminate major repairs in the future.
Aeration Basins.
Mode of operation
Type of aeration system
Is the basin free of dead spots? • ❑ ❑ O
Are surface aerators and mixers operational? .000
Are the diffusers operational? ❑ ❑ E ❑
Is the foam the proper color for the treatment process? 1 ❑ ❑ ❑
Yes No NA NF
■ O ❑ ❑
• ❑ ❑ ❑
❑ ❑ ❑ •
Yes No NA NF
Does the foam cover less than 25% of the basin' s surface? 1 ❑ ❑ ❑
Is the DO level acceptable? 1 ❑ O ❑
Are settleometer results acceptable? • ❑ ❑ O
Comment: The facility has two (2) aeration basins. Both aeration basins are operational. One aeration basin is utilized
for treatment of wastewater while the other is basically a standby. Basin #1 contains two (2) aerators and one (1) mixer.
The aerators are set on timers that allow the aerators to be switched every 10 minutes and operate 4 minutes. The most
recent Mixed Liquor Suspended Solids (MLSS) results were 2200 mg/L.
Disinfection Yes No NA NF
Type of system ?
Are cylinders secured adequately?
Are cylinders protected from direct sunlight?
Is there adequate reserve supply of disinfectant?
Is ventilation equipment operational?
Is ventilation equipment properly located?
Is SCBA equipment available on site?
Is SCBA equipment operational?
Is staff trained is operating SCBA equipment?
Is staff trained in emergency procedures?
Is an evacuation plan in place?
Are tablet chlorinators operational?
Are the tablets the proper size and type?
Number of tubes in use?
(Sodium Hypochlorite) Is pump feed system operational?.
Is bulk storage tank containment area adequate? (free of leaks/open drains)
Is the level of chlorine residual acceptable?
Is there adequate detention time
Is the contact chamber free of growth, or sludge buildup?
Comment: Chlorine is added to the influent (domestic) to assist with disinfection. The addition of chlorine does not occur
at the wastewater plant but a location at the back of the building which houses the industrial process which includes
making cloth, sewing cloth and dyeing swatches (small pieces) of cloth.
111000
11000
■ ❑ ❑ ❑
■ ❑❑❑
• ❑ ❑ ❑
❑ ❑•❑
O 010
O 010
11000
O 00111
❑ ❑ E0
❑ ❑ •❑
❑ ❑ E0
O 010.
O 00111
O 00111
DO 1110
Permit: NC0043320 Owner - Facility: Burlington Industries LLC - Burlington Industries LLC - Richmond Plant
Inspection Date: 12/07/04 Inspection Type: Compliance Evaluation
Pump Station - Fffluent
Is the pump wet well free of bypass lines or structures?
Is the general housekeeping acceptable?
Is the wet well free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational?
Comment: Effluent flows by gravity to the outfall.
Yes Nn NA NF
O ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ • ❑
O 0.0
❑ ❑■❑
O 0.0
O 0.0
❑ ❑ ■ ❑
,Standby Power Yes No NA NF
Is automatically activated standby power available? 1 ❑ ❑ ❑
Is generator tested weekly by interrupting primary power source? 0.00
Is generator tested under load at least quarterly? 0.00
Was generator tested & operational during the inspection? ❑ ❑ ❑ 1
Do the generator(s) have adequate capacity to operate the entire wastewater site? • ❑ ❑ ❑
Does generator have adequate fuel? 0 0 0 •
Is there an emergency agreement with a fuel vendor for extended run on back-up power? 0 0 0 •
Comment: The generator is tested under load annually. A recommendation would be to test the generator weekly by
interrupting the primary power source.
ahoratory Yes No NA NF
Are field parameters performed by certified personnel or laboratory? • ❑ ❑ ❑
Are all other parameters(excluding field parameters) performed by a certified lab? 1 ❑ ❑ ❑
Is the facility using a contract lab? 1 ❑ O ❑
Are analytical results consistent with data reported on DMRs? 1 ❑ ❑ ❑
Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)? ❑ ❑ 1 ❑
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? ❑ ❑ 1 ❑
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? 00.0
Comment:
Flow Measurement - Influent Yes Nn NA NF
Is flow meter used for reporting? 00.0
Is flow meter calibrated annually? ❑ O E ❑
Is flow meter operating properly? 0 0 • 0
(If units are separated) Does the chart recorder match the flow meter? O ❑ E ❑
Comment:
Flow Measurement- Effluent Yes Nn NA NF
Is flow meter used for reporting? 1 ❑ ❑ ❑
Is flow meter calibrated annually? 1 ❑ ❑ ❑
Is flow meter operating properly? .000
(If units are separated) Does the chart recorder match the flow meter? 1 ❑ O ❑
Comment: The effluent flow meter was calibrated September 23, 2004 by facility instrumentation staff (Bill Thompson).
Yes Nn NA NF
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
■ ❑ ❑ ❑
11000
Permit: NC0043320 Owner - Facility: Burlington Industries LLC - Burlington Industries LLC - Richmond Plant
Inspection Date: 12/07/04 Inspection Type: Compliance Evaluation
Record Keeping
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Are sampling and analysis data adequate and include:
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Plant records are adequate, available and include
O&M Manual
As built Engineering drawings
Schedules and dates of equipment maintenance and repairs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility classification?
Is a copy of the current NPDES permit available on site?
Is the facility description verified as contained in the NPDES permit?
Does the facility analyze process control parameters, for example: MLSS, MCRT, Settleable Solids, DO, Sludge
Judge, pH, and others that are applicable?
Facility has copy of previous year's Annual Report on file for review?
Comment:
Influent Samnling
Is composite sampling flow proportional?
Is sample collected above side streams?
Is proper volume collected?
Is the tubing clean?
Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)?
Is sampling performed according to the permit?
Comment:
Fff uient Sampling,
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type representative)?
Comment: The effluent composite sampler temperature was 0 degrees Celsius. The acceptable temperature range of
samples during storage and for stored sample extracts, is 1.0 to 4.4 degrees Celsius. Ref: Federal Register, July 1,
1995; 40 CFR 136; Table II.
Aerobic Digester
Yes No NA NF
• 000
• 000
• 000
•
•
•
•
•
•
1.000
•
•
•
• 000
• ❑ ■ O
• 000
• ❑ ❑ ❑
• 000
▪ ❑ ❑ ❑
• 000
• 000
• 000
O 0.0
Yes No NA NF
❑ ❑ ■ ❑
❑ ❑ • ❑
❑ ❑ ■ ❑
❑ ❑ • ❑
❑ ❑ ■ ❑
O ONO
Yes No NA NF
• 000
• 000
• ❑ ❑ ❑
■ ❑❑❑
• 000
• 000
Yes No NA NF
Permit: NC0043320 Owner - Facility: Burlington Industries LLC - Burlington Industries LLC - Richmond Plant
Inspection Date: 12/07/04 Inspection Type: Compliance Evaluation
Aerobic Digester Yes No NA NF
Is the capacity adequate? • ❑
00
Is the mixing adequate? 0 • 0 ❑
Is the site free of excessive foaming in the tank? • ❑ ❑ ❑
Is the odor acceptable? U ❑ �
Comment: The aerator in the digester has been repaired but has not been placed back into the digester. The facility
plans to contract with a crane service in order to place the aerator in the digester. A recommendation is to remove the
grass from the edge of the digestor to assist with maintaining the facility.
Drying Beds Yes No NA NF
Is there adequate drying bed space? 1 ❑ ❑ ❑
Is the sludge distribution on drying beds appropriate? 0 0 • 0
Are the drying beds free of vegetation? 1 ❑
Is the site free of dry sludge remaining in beds? 1 ❑
0
Is the site free of stockpiled sludge? 1
000
Is the filtrate from sludge drying beds returned to the front of the plant? 0 0 E 0
Is the sludge disposed of through county landfill? 0 0 E 0
Is the sludge land applied? 00.0
(Vacuum filters) Is polymer mixing adequate? 0 0 E 0
Comment: Facility has never wasted any solids onto the drying beds as per Ms. Quick in the years she has been
employed there. All solids from the clarifiers are returned to the aeration basin.
Fffluent Pipe Yes No NA NF
Is right of way to the outfall properly maintained?
Are receiving water free of solids and floatable wastewater materials? 1
Are the receiving waters free of solids / debris? 1
Are the receiving waters free of foam other than a trace? 0 0 0 •
Are the receiving waters free of sludge worms? 1
If effluent (diffuser pipes are required) are they operating properly? 00.0
Comment:
Regional Field Inspectors Check List for Field Parameters
Name of site to be Inspected: _
Field certification # (if. applicable): �n
NPDES n _ Region:
#: � Cr�n ��
I. Circle the ararneter or arameters erformed at this site:
Settleable Solids�pductivit emperatur
esidual Chtonn � ,
II. Instrumentation:
Does the facility have the equipment necessary to analyze field parameters as circled above?
No
A acC.trrnel p 1-1Er
-
- r►l
r? Lip
Inspector: /-/ rt,
1. A pH meter
2. A Residual Chlorine meter
3. . DO meter
4. A Cone for settleable solids
Ye
Yes
5. A thermometer or meter that measures temperature. *Yes
Yes No
No
6. Conductivity meter
III. Calibration/Analysis;
1. Is the pH meter calibrated uer eaach day ofeuse? d
checked with a third
2. For Total Residual Chlorine, is a check standard
analyzed each day of use?
3. Is the air calibration of the D0 meter performed
each day of use?
4. For Settleable Solids, is 1 liter of sample
settled for 1 hour?
5. Is the temperature measuring device calibrated
annually against a certified thermometer?
6. For Conductivity, is a calibration standard
analyzed each day of use?
Yes
Yes
Yes
No Colt
No
No
P4rrrtfr
55011
IV. Documentation:'
1. Is the date and time that the sample was collected documented?
2. Is the sample site documented?
3. Is the sample collector. documented?
4. Is the analysis date and time documented?
5. Did the analyst sign the documentation?
6. Is record of calibration documented?
7. For Settleable Solids, is. sample. volurne and
1 hour time settling time documented?
8. For Temperature, is the annual calibration of
the measuring device documented? .
Comments:
qes
Yes
No
No ....
No
Please submit a copy of this completed form to the Laboratory. Certification Program.
DWQ Lab Certification
Chemistry Lab. •
Courier # 52-01-01
FIELD INSPECTOR CHECKLIST REV. 04/23/2002
Re: GENERATOR AT WASTE WATER TREATMENT FACILI...
Subject: Re: GENERATOR AT WASTE WATER EATMENT 'ACILLTY AT-B.PRIeHM'OND
PLAN TTI'EyRIv1aIT NO:NC0043320
From: Belinda Henson <Belinda.Henson@ncmail.net>
Date: Wed, 15 Dec 2004 14:13:58 -0500
To: "Smart.Paul" <smart.paul@burlington.com>
Thank you Paul for the call yesterday. This will be noted in our files. Have a good
day.
Belinda
Smart.Paul wrote:
AS I NOTED TO YOU IN OUR TELEPHONE CONVERSATION WE DO NOT HAVE A BACK UP
GENERATOR.
IN THE PAST WHEN WE HAD POWER FAILURES OUR PROCESS WAS ALSO EFFECTED
THEREFORE THE FLOW
TO THE WASTE TREATMENT FACILITY WAS ALSO EFFECTED.
IF WE EVERY HAD A FAILURE OF JUST THE POWER TO THE WASTE TREATMENT PLANT THEN
WE WOULD
MONITOR OUR DISCHARGE. WE WOULD ALSO TRY TO CONTAIN OUR INFLUENT AND REDUCE
OUR PROCESS
UNTIL REPAIRS WHERE MADE OR A TEMPORARY POWER SOURCE WAS PUT IN PLACE.
1 of 1 12/15/2004 2:14 PM