HomeMy WebLinkAbout20000874_Mitigation Information_20021223Skelly and Loy, LLP
5404 Fails of the Neuse Road
Suite 103
Raleigh, NC 27615 9
E -mail: wlyke @skeltyloy.com 1
Internet: www.skellyloy.com
Mr. Richard Spencer
Project Manager, Regulatory Division
U.S. Army Corps of Engineers
Post Office Box 1890
Wilmington, North Carolina 28402 -1890
Dear Mr. Spencer:
jL.__ Phone: 919- 878 -3535
Fax: 919- 878 -3550
December 23, 2002
Re: Stream Mitigation Plan for NCDO1' Ellerbe
Bypass Project, NCDOT
Project TIP 2231
Skelly and Loy, LLP is enclosing one copy of the revised Stream Mitigation Design Repant for the
following project, involved with the North Carolina Department of Transportation (NCDOT) Ellerbe: Bypass
Project.
• Site #2, Saron Church Road (Riparian Planting and Livestock Exclusion)
The enclosed document is supplied for your review and comment. We are requestiing your
acceptance of the mitigation credit ratios and associated linear feet of stream mitigation credit for- this site
as presented in the appropriate sections of the enclosed report. Reports for three additional sites ((Bennett
Road, Poole Road, and Haithcock Road) will be completed and submitted to your office before throe end of
January 2003.
If you have any questions or comments regarding the enclosed document, please do not mesitate
to contact me at the above telephone number. Thank you for your consideration in this matter.
Sincerely yours,
SKELLY and LOY, LLP
vV
William Lyke, P. , P.G.
Senior Manager
Enclosure
cc: Alice Gordon
Gerry Longenecker
Michael Lower
2300000002
Office Locations: Harrisburg PA Pittsburgh PA Morgantown WV State Coll- e PA H
V , agersto)wn, NO
Affiliated Company: AMS of Skelly and Loy, Harrisburg, PA
Skelly and Loy, LLP
6404 Falls of the Neuse Road
Suite 103
Raleigh, NC 27615
E -mail: wlyke@skellyloy.com t
Internet: www.skellyloy.com
Mr. Dave Cox
Wildlife Resources Commission
1142 1 -85 Service Road
Creedmore, North Carolina 27522
Dear Mr. Cox:
I Phone: 919- 878 -3535
F Fax: 919 -878 -3550
December 23, 2002
Re: Stream Mitigation Plan
Bypass Project, NCDOT
Project TIP 2231
for NCDOT Ellerbe
Skelly and Loy, LLP is enclosing one-copy of the revised Stream Mitigation Design Report for the
following project, involved with the North Carolina Department of Transportation (NCDOT) Ellerbe Bypass
Project.
0 Site #2, Saron Church Road (Riparian Planting and Livestock Exclusion)
The enclosed document is supplied for your review and comment. We are requesting your
acceptance of the mitigation credit ratios and associated linear feet of stream mitigation credit for this site
as presented in the appropriate sections of the enclosed reports. Reports for three additional sites (Bennett
Road, Poole Road, and Haithcock Road) will be completed and submitted to your office before the end of
January 2003.
If you have any questions or comments regarding the enclosed document, please do not hesitate
to contact me at the above telephone number. Thank you for your consideration in this matter.
Sincerely yours,
SKELLY and LOY, LLP
William Lyke, P.E., P.G.
Senior Manager
Enclosure
cc: Alice Gordon
Gerry Longenecker
Michael Lower
2300006002
Office Locations: Harrisburg, PA Pittsburgh, PA Morgantown, WV Stale College, PA Hagerstown, MD
Affiliate! Company: AMS of Skelly and Loy, Harrisburg, PA