Loading...
HomeMy WebLinkAboutNCS000040_MONITORING REPORT_20201203CHARLRTTERECEIVED PIPE and FOUNDRY COMPANY P.O. Box 35430 • Telephone 704/332-2647 DEC 03 2020 CHARLOTTE, NORTH CAROLINA 28235 JENR-aEMLR Foundry Fax No. 332-4581 and qua➢ty section ,oru.,vl le Regional pgice December 2, 2018 NCDEQ - Mooresville Regional Office Attn: DEMLR Stormwater Program / James Moore 610 East Center Avenue, Suite 301 Mooresville, NC 28115 704.663.1699 RE: Charlotte Pipe & Foundry Company - Cast Iron Division Permit No: NCS000040 Stormwater Semi -Annual Analytical Monitoring Sampling Timeframe: July 2020 - December 2020 Please find attached the semi-annual Discharge Monitoring Report (DMR) for sampling conducted on November 12, 2020. Also, please find enclosed the monthly new motor oil usage data and stormwater insert change -out schedule for calendar year 2020YTD. The next TSS Abatement & Maintenance Quarterly Report will be submitted January 2021 for 4Q2020. Please contact Jenny Pappalardo at (704) 348-5513 or David Waggoner at (704) 348-5408 if you have any questions or need any additional information. Sincerely, On (' D Jenny L. Pappalardo Charlotte Pipe and Foundry Company Environmental Compliance RECp::- DEC o STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT DE,.,_,_,.:._ nano Qualiq, Sc: Permit Number NCS 000040 Mooresvin, ra .,., FACILITY NAME Charlotte Pipe and Foundry Company — Cast Iron Div PERSON COLLECTING SAMPLE(S) Jenny Pappalardo / Jack Hess CERTIFIED LABORATORY(S) Pace Analytical Lab # 12 Pace Analytical Lab #40 Part A: Specific Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: 2020 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY Mecklenburg PHONE NO. 7( 04 ) 332-2647 SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 2. Outfau Date 50050 1042 1051 1092 C0530 340 400 No. Sample Collected Total Flow if a Total Rainfall Cu Pb Zn TSS COD pH mo/dd/ r MG inches m9 mg/L mg/L mg/L mg/L unit A 11/12/20 n/a 4.3 0.008 0.008 0.093 27 54.6 6.5 B 11/12/20 n/a 4.3 0.032 0.037 0.274 101 86.2 8.7 C 11/12/20 n/a 4.3 0.022 0.027 0.691 162 57.0 7.8 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? dyes Ono (if yes, complete Part B) Part B: Vehicle Maintenance Activitv Monitorine Requirements Outfall No. Date Sample Collected 50050 00556 00530 00400 Total Flow (if applicable) Total Rainfall Oil & Grease (if appl.) Non -polar O&G/TPH (Method 1664 SGT-HEM), if a 1. Total Suspended Solids pH New Motor Oil Usage mo/dd/ r MG inches m m unit allmo C 11/12/20 n/a 4.3 n/a ND see above see above 100 avq YTD Form SWU-247, last revised 611212015 Page 1 of STORM EVENT CHARACTERISTICS: Date 11/12/20 Total Event Precipitation (inches): 4.3 Event Duration (hours): n/a (only if applicable —see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Mail Original and one copy to: Division of Energy Mineral and Land Resources Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." l r )% -�, 12/2/2020 (Signature of Permittee) (Date) Form S WU-247, lust revised 611212015 Page 2 of 2 Garage New Motor Oil Usage Month gals Jan 2020 110 Feb 2020 55 Mar 2020 110 Apr 2020 110 May 2020 110 Jun 2020 110 Jul 2020 110 Aug 2020 110 Sep 2020 110 Oct 2020 55 Nov 2020 110 Stormwater Insert Schedule Change ID# Location Schedule Mar-20 Apr-20 May-20 Jun-20 Jul20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 SWl Corner of Office Building 1/yr x SW2 Behind Slag Pile 1/grtr x © © © x SW3 Water Treatment 1/6m x x SW4 Corner of Substation & Rolo Laempe 1/6m x x SW5 Corner of Substation & Rolo Electr Rm 1/6m x x SW6 Oil House 1/6m x x SW7 NPF Baghouse 1/grtr x © © © x SW8 Sand Lab 1/grtr x © © © x SW9 Oil House Hill 1/6m x x SW10 Middle Oil House Hill 1/6m x x SW11 Gas Pump 1/6m x x SW12 HWS Baghouse 1/grtr x x x SW13 Alley @ HWS & Bath House 1/grtr x x x SW14 Alley @ Kitchen 1/grtr x x x x SW15 Alley @ Cope & Drag 1/mo x x x x x x x x x SW16 Alley @ Pattern Shop 1/mo x x x x x x x x x SW17 Alley @ Laempe Entrance 1/mo x x x x x x x x x SW18 Top Hill 1/yr x SW19 E-Coat 1/yr x SW20 Behind Pipe 1/yr x x Insert Changed Scheduled Change @ Checked, but ok so reviewing schedule for next CY