Loading...
HomeMy WebLinkAbout20120119 Ver 1_Inspection_20130426April 26, 2013 Mr. J. J. Swain, Jr., P.E. Division 13 Engineer N.C. Department of Transportation Post Office Box 3279 Asheville, North Carolina 28802 Natural Resources Subject: Inspection TIP No. B -5178 Bridge Nos. 235 and 238 Interstate 26 at Pond Road Buncombe County Dear Mr. Swain: tz- OII c John E. Skvarla, III Secretary On April 22, 2013, I inspected the construction work on TIP Project No. B -5178, Bridge Nos. 235 and 238, over Hominy Creek, on Interstate.26,.in Buncombe County. The inspection included a review of the construction and compliance with the 401 Water Quality Certification. Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are performed as required to protect State surface waters. Also, please refer to the attached inspection report for any specific items noted during the inspection. If you have questions, please call me at 828 - 296 -4500. Sincerely, �- Michael R. Parker Environmental Senior Specialist Attachment cc: Cole Hood, PE Roger Bryan, Division 13, DEO Ben DeWit, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office B -5178 Bridge Nos. 235 and 238 April 2013 Inspection Letter SURFACE WATER PROTECTION SECTION — Asheville Regional Office 2090 US 70 Highway, Swannanoa, NC 28778 -8211 Phone: 828- 296-45001 FAX: 828 - 299 -7043 One Internet: www.ncwaterguality.org NorthCarolina An Equal Opportunity Affirmative Action Employer ,/ atura"y Wetland Inspection Deport Project Num: 20120119 Version: 1 Status: Issued Project Name: NCDOT- Bridges No. 235 & 238 on SR 3431 (B -5178) Project Type: Replace bridge with bridge County: Buncombe Region: Asheville Location: NCDOT- Bridges No 235 & 238 on SR 3431 (B -5178) Latitude: +35 °32'44'1 Longitude: -82 °36'1711 SW Plan Location: Site Owner Name: NC DOT PDEA Inspection Date: 04/22/2013 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Michael R Parker Secondary Inspector(s): Facility compliance Status: ® Compliant Program Area: 401 (includes isolated /non -404) Question Areas: Permit (401 WQC) Title: n Not Compliant Phone: Phone: 828 -296 -4500 Inspection Summary: Inspected site with NCDOT staff. Contractor continues to work on piers for the new bridge. Also, -grading is taking place for the new MSE wall and new lane for 1 -26. Please ensure that sediment and erosion control structures are maintained to protect Hominy Creek. Seed and mulch all bare as required. Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and /or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? V__ K1_ AIA AIC ®nnn ®nnn ®nnn Page: 1