HomeMy WebLinkAbout20211153 Ver 1_401 Application_20210609DWR Pre -Filing Meeting Request Form
Contact Name*
Contact Email Address*
Project Owner*
Project Name*
Project County*
Owner Address:*
Dionne Snead
dionne.snead@yahoo.com
C. Todd Snead
Floyd Road pond
Davidson
Street Address
448 Floyd Road
Address Line 2
City State / Rovince / Region
Lexington North Carolina
Fbstal / Zip Code Country
27292 United States
Is this a transportation project?* c: Yes r No
Type(s) of approval sought from the DWR:
l 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
(' Yes c: No
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below and include location information.*
requesting approval for a small pond to water a variety of livestock at
our home. We are using an existing creek branch. we would like a
driveway permit as well.
448 Floyd Road in Southmont off of Briggs Road
Please attach the documentation you would like to have the meeting about.
pdf pond photo.pdf
pdf only
1.17MB
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• !also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature *
Submittal Date 6/9/2021
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Pre -Construction Notification (PCN) Form
A. Applicant Information
1. Processing
la. Type(s) of approval sought from the Corps:
❑ Section 10 Permit
X Section 404 Permit
1 b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number:
lc. Has the NWP or GP number been verified by the Corps?
X Yes ❑ No
1d. Type(s) of approval sought from
the DWQ (check all that apply):
— Regular ❑ Non-404 Jurisdictional General Permit
— Express ❑ Riparian Buffer Authorization
X 401 Water Quality Certification
❑ 401 Water Quality Certification
le. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
For the record only for Corps Permit:
❑ Yes X No
❑ Yes X No
1f. Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
❑ Yes X No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
❑ Yes X No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes X No
2. Project Information
2a. Name of project:
Snead Private Pond
2b. County:
Davidson
2c. Nearest municipality / town:
Lexington
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state project no:
3. Owner Information
3a. Name(s) on Recorded Deed:
3b. Deed Book and Page No.
3c. Responsible Party (for LLC if
applicable):
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
Page 1 of 10
PCN Form — Version 1.4 January 2009
4. Applicant Information (if different from owner)
4a. Applicant is:
❑ Agent
❑ Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 of 10
B. Project Information and Prior Project History
1. Property Identification
la. Property identification no. (tax PIN or parcel ID):
6639-02-66-6030
1 b. Site coordinates (in decimal degrees): Latitude: 35.65572 Longitude: -80.2234
lc. Property size:
5.06 acres
2. Surface Waters
2a. Name of nearest body of water to proposed project:
High Rock Lake (Yadkin River)
2b. Water Quality Classification of nearest receiving water:
WS-IV, B
2c. River basin:
Yadkin
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Rural / wooded
3b. List the total estimated acreage of all existing wetlands on the property: 0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 350
3d. Explain the purpose of the proposed project:
3e. Describe the overall project in detail, including the type of equipment to be used:
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
X Yes ❑ No ❑ Unknown
Comments.
4b. If the Corps made the jurisdictional determination, what type
of determination was made?
Preliminary Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): Andrew Williams, Sue Homewood
Agency/Consultant Company:
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
1/21321 and 3/4/21
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑Yes X No ❑Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project?
❑ Yes X No
6b. If yes, explain.
Page 3 of 10
PCN Form — Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
la. Which sections
❑ Wetlands
were completed below
for your project (check all that apply):
❑ Buffers ❑ Open Waters ❑ Pond Construction
X Streams — tributaries
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
Temporary (T)
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f.
Area of
impact
(acres)
W1 -
Choose one
Choose one
Yes/No
-
W2 -
Choose one
Choose one
Yes/No
-
W3 -
Choose one
Choose one
Yes/No
-
W4 -
Choose one
Choose one
Yes/No
-
W5 -
Choose one
Choose one
Yes/No
-
W6 -
Choose one
Choose one
Yes/No
-
2g. Total Wetland Impacts:
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1 P-
Fill
ut to Yadkin River
PER
Both
3.5
30
S2 P
Flooding
ut to Yadkin River
PER
Both
3.5
218
S3 -
Choose one
-
-
S4 -
Choose one
-
-
S5 -
Choose one
-
-
S6 -
Choose one
-
-
3h. Total stream and tributary impacts
248
3i. Comments:
Page 4 of 10
PCN Form — Version 1.4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number
Permanent (P) or
Temporary (T)
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
01 -
Choose one
Choose
02 -
Choose one
Choose
03 -
Choose one
Choose
04 -
Choose one
Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a.
Pond ID number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Livestock watering
218
30
P2
Choose one
5f. Total:
218
30
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes
X
No If yes, permit ID no:
5i.
Expected pond surface area (acres):
5j. Size of pond watershed (acres):
46
5k.
Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a. Project is in which protected basin?
❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other:
6b.
Buffer Impact
number —
Permanent (P) or
Temporary (T)
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1
impact
(square
feet)
6g.
Zone 2
impact
(square
feet)
B1 -
Yes/No
B2 -
Yes/No
B3 -
Yes/No
B4 -
Yes/No
B5 -
Yes/No
B6 -
Yes/No
6h. Total Buffer Impacts:
6i. Comments:
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
No
❑ Yes X
2b. If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c. If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type: Choose one
Type: Choose one
Type: Choose one
Quantity:
Quantity:
Quantity:
3c. Comments:
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
Choose one
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non -riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
Yes X No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
❑ Yes X No
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project?
0
2b. Does this project require a Stormwater Management Plan?
❑ Yes X No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
2e. Who will be responsible for the review of the Stormwater Management Plan?
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
3b. Which of the following locally -implemented stormwater management programs
apply (check all that apply):
❑ Phase II
NSW
❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
attached?
❑Yes ❑ No
4. DWQ Stormwater Program Review
4a. Which of the following state -implemented stormwater management programs apply
(check all that apply):
Coastal counties
❑HQW
❑ORW
❑Session Law 2006-246
❑Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes ❑ No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1.4 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the
use of public (federal/state) land?
❑ Yes X No
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
❑Yes ❑ No
lc. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
Comments:
❑ Yes ❑ No
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
or Riparian Buffer Rules (15A NCAC 2B .0200)?
X Yes ❑ No
2b. Is this an after -the -fact permit application?
X Yes ❑ No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
partial after the fact applicaion
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
additional development, which could impact nearby downstream water quality?
Yes X No
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N/A
Page 9 of 10
PCN Form — Version 1.4 January 2009
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
habitat?
❑ Yes ❑ No
5b. Have you checked with the USFWS concerning Endangered Species Act
impacts?
❑ Yes ❑ No
5c. If yes, indicate the USFWS Field Office you have contacted.
-
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ❑ No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
❑ Yes ❑ No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?
❑ Yes ❑ No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
Applicant/Agent's Printed Name
Date
Applicant/Agent's Signature
(Agent's signature is valid only if an authorization
letter from the applicant is provided.)
Page 10 of 10
Staff Review For
Updated September 4, 2020
Staff Review
Does this application have all the attachments needed to accept it into the review process?*
c Yes No
Submittal Type:* 401 Application
Comments: The application cannot be submitted until after the 30 day pre filing meeting
request hold is up.
Please copy and paste the following link into your web browser for explanation on
the how to correct your application and resubmit for review.
https://edocs.deq.nc.gov/WaterResources/DocView.aspx?
id=1335197&dbid=0&repo=WaterResources
Rease type in reason why this project can not be reviewed.
Project Submittal Form
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type:*
✓ For the Record Only (Courtesy Copy)
✓ New Project
✓ Modification/New Project with Existing ID
✓ More Information Response
✓ Other Agency Comments
✓ Pre -Application Submittal
✓ Re-Issuance\Renewal Request
✓ Stream or Buffer Appeal
Pre -Filing Meeting Information
Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not
be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in
accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project
proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section
121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was
submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read
more information on when this form is needed prior to application submission or here to view the form.
Attach documentation of Pre -Filing Meeting Request here:
DWR Pre -Filing Meeting Request Form (1).pdf 49.64KB
Date for Meeting Request 3/4/2021
ID#
Project Contact Information
Name: Dionne Snead
Who is submitting the inforrration?
Email Address: dionne.snead@yahoo.com
Project Information
Project Name: Floyd road pond
Is this a public transportation project?
r Yes
a No
Version
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r No r Unknown
County (ies)
Davidson
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach docunent
floyd pond PCN (1).pdfts.pdf 880.64KB
Only pdf or krrz files are accepted.
Describe the attachments
or comments:
Sign and Submit
117 By checking the box and signing box below, I certify that:
• I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to
the best of my knowledge and belief.
• I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
• I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
• I intend to electronically sign and submit the online form.
Signature:
Submittal Date: Is filled in autonatically.
DocuSign Envelope ID: 54D3509B-785B-49A1-8719-7D9BEFA5F61 F
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
January 28, 2021
CERTIFIED MAIL # 7018 1130 0000 1608 2415
RETURN RECEIPT REQUESTED
Chris Snead & Todd Snead
448 Floyd Rd
Lexington NC 27292
Subject: NOTICE OF VIOLATION and RECOMMENDATION FOR ENFORCEMENT
NOV-2021-OP-0001
Parcel PIN: 6639-02-66-6030
Property on Floyd Rd, Lexington NC
Davidson County
Dear Sirs:
On January 21, 2021, Sue Homewood of the Division of Water Resources (Division) Winston-Salem
Regional Office conducted a site inspection in response to a referral from staff of the Division of Energy,
Mineral and Land Resources (DEMLR). The inspection was to investigate disturbances to a stream
channel on your above referenced property that appeared to be for the purposes of construction a pond
and/or installing road crossings. During the site inspection, Division staff observed that approximately
325 linear feet of stream channel had been impacted by the recent land disturbing activities. A Division
file review indicated that impacts to the streams have occurred without the issuance of a 401 Water
Quality Certification.
Accordingly, the following observations and violations were noted during the Division of Water
Resources inspection and subsequent file review:
1. Division file review indicates that impacts to the stream have occurred without the issuance of a
401 Water Quality Certification. Title 15A NCAC 02H .0501 requires certifications pursuant to
Section 401 of the Clean Water Act whenever construction or operation of facilities will result in
a discharge into navigable waters, including wetlands, as described in 33 CFR Part 323. Title 15A
NCAC 02H .0502 states any person desiring issuance of the State certification or coverage under
a general certification required by Section 401 of the Federal Water Pollution Control Act shall
file with the Director of the North Carolina Division of Water Resources. The file review
confirmed that a Pre -Construction Notification has not been received by the Division of Water
Resources for this project and that a 401 Water Quality Certification has not been issued.
D_E
NOR! H CAHOI INA
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105
336.776.9800
kgWNmBnt of EmIrOnmBntaI quAl�
DocuSign Envelope ID: 54D3509B-785B-49A1-8719-7D9BEFA5F61 F
Page 2 of 3
2. Approximately 325 feet of an unnamed tributary to the Yadkin River has been impacted by the
land disturbing activities. The stream impacts within the unnamed tributary to the Yadkin River
constitute a violation of 15A NCAC 02B .0211 (2) which states: "The waters shall be suitable for
aquatic life propagation and maintenance of biological integrity, wildlife, secondary recreation,
and agriculture. Sources of water pollution which preclude any of these uses on either a short-
term or long-term basis shall be considered to be violating a water quality standard."
Required Response
Accordingly, you are directed to respond to this letter in writing within 30 calendar days of receipt of
this Notice. Your response should be sent to this office and include the following information:
1. Restore or Permit the impacts from the land disturbing activities. Your proposal must be sent
to this office for review and approval prior to conducting any further activities within the
stream channels other than installation and/or maintenance of appropriate sediment and
erosion control measures to protect downstream water quality.
a. Restore: Submit a stream restoration plan for the unnamed tributary. This plan must
detail how you intend to restore the natural grades and hydrology patterns and details
of how the areas will be protected in the future. Please indicate in your response a
schedule with dates detailing when the restoration will be accomplished. The Division
strongly recommends that you secure the assistance of a qualified stream restoration
consultant should you choose to pursue this option.
b. Permit: Submit an application to the US Army Corps of Engineers for a 404
authorization/approval of the impacts to the stream for the proposed activities. A 401
Water Quality Certification will also be required. To apply for a 401 Water Quality
Certification, an application to the Division is required. Note that this application will
be reviewed for purpose and need along with avoidance and minimization pursuant to
15A NCAC 02H .0506. The Pre -Construction Notification form can be found at:
https://deq.nc.gov/about/divisions/water-resources/water-resources-
permits/wastewater-branch/401-wetlands-buffer-permits/401-application-forms-help-
documents
c. Alternatively, you may submit a proposal that is a combination of both restoration and
resolution through permitting options.
Thank you for your attention to this matter. DWR requires that the violations, as detailed above, be
abated and properly resolved. This Office is considering a recommendation for civil penalty assessment
to the Director of the Division of Water Resources regarding the above -mentioned violations on the
subject site.
Pursuant to G.S. 143-215.6A, the above -mentioned violations and any future violations are subject to a
civil penalty assessment of up to a maximum of $25,000.00 per day for each violation. Your above -
mentioned response to this correspondence will be considered in any further process that may occur.
DocuSign Envelope ID: 54D3509B-785B-49A1-8719-7D9BEFA5F61 F
Page 3 of 3
Should you have any questions regarding these matters, please contact Sue Homewood at 336-776-
9693 or Sue.Homewood@ncdenr.gov
Sincerely,
DocuS ig ned by:
l . c,JM0.Cf
145B49E225C94EA...
Lon T. Snider
Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ— WSRO
cc: Blane Houk, DEMLR (via email)
Andrew Williams, USACE Raleigh Regulatory Field Office (via email)
Shelton Sullivan —401 & Buffer Permitting Branch
WSRO File Copy