Loading...
HomeMy WebLinkAboutNCC212092_Modification Review_20210723 Action History (UTC-05:00)Eastern Time(US&Canada) Subrrit by Anonymous User 7/21/2021 10:32:51 AM(ADD TO FILE Submittal) Approve by Morman,Alaina 7/23/2021 3:05:33 PM(Construction COC ADD TO FILE Review-NCC212092) • The task was assigned to Morman,Alaina.The due date is:July 26,2021 5:00 PM 7/21/2021 10:32 AM EESS - 1 • NORYH CAIiOLINA EnYlrenmemf&Quality Certificate of NCC212092 Coverage (COC) Enter the Certificate of Coverage Namber(Use capital letters) No.* Information associated with this permit: Project Name East Ash Basin Southeast Diversion Channel Address 1700 Dunnaway Road, Semora, NC County Person Latitude 36.4733 Longitude -79.0578 Permittee Listed Duke Energy Progress LLC Legally Responsible Duncan Brewer Individual NC Reference No. NCG01-2021-2092 E&SC Plan ID PERSO-2021-014 Original NOI 49659 Tracking No.* Date COC Issued* 04/07/2021 Prior Rescission This field will populate only if CCChas already been rescinded. Date Modification Information: Reason for r Closed-Out Lots/Outparcels in E&SC Plan Modification* r Additional Lots/Outparcels Approved-E&SC Revised F Other Revision(s)to E&SC Plan r Legally Responsible Individual and/or Site Contact Has Changed f Multiple Reasons(List) Addional IVbre information(e.g.,new Site Contact details).If lots are being added,please include specific lot numbers. Explanation You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance,etc.(only upload applicable sheets). For changes to the legally responsible individual,you must upload this form. Supporting Upload Supporting Documentation(%vised ERSC Approval,(lose-Cut Doc,etc.) Documentation PERSO-2021-014_20210719_LOA Revision-1.pdf 317.78KB Mast be FDFformat North Carolina General Statute 143-215.66(1) provides that: Anyperson who knowinglymakes any false statement,representation,or certification in anyapplication,record,report,plan,or other documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to e)ceed ten thousand dollars($10,000). rJ I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual f Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary,treasurer,or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV, Section B, Item(6)of that permit. Signature Type Name* Duncan Brewer Title* Project Director Organization* Duke Energy Progress LLC Date* 07/21/2021 Email Address* duncan.brewer@duke-energy.com 57ail for confirmation Telephone Number* 3363302058 Contact nun ber if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email lori.tollie@duke-energy.com (Optional) Additional errail for confirrration Original Permittee duncan.brewer@duke-energy.com Email Original Site Contact duncan.brewer@duke-energy.com Email Review Date 07/23/2021 Rescinded Since Submitted? Request Date 20210721 Formatted Review Date 20210723 Formatted