Loading...
HomeMy WebLinkAboutSW6200102_Plan (Misc. Detail)_20200608U.S. ARMY CORPS OF ENGINEERSHPTC_CG805.dgnANSI DCHECKED BY:DRAWN BY:ISSUE DATE:SHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONP:\Projects\017001\03 CAD_BIM\_Sheets\05_Civil\HPTC_CG805.dgn23-MAR-202014:51 171-20-13R. BOSTONW912PM-19-C-000769 DARLINGTON AVENUEWILMINGTON DISTRICTWILMINGTON, NORTH CAROLINAFORT BRAGG, NORTH CAROLINASOF HUMAN PERFORMANCE TRAINING CENTER (HPTC)FY18 PN 79443W912PM-18-R-0003SOLICITATION NO.:DECEMBER 2019CHANNEL AREA WITH NO DEFINED PIPE OUTLET TO FLAT DEFINED CHANNEL PIPE OUTLET TO WELL La d do 3Do W=do+0.4La do 3do (MIN) La d0% 0% PLAN VIEW PLAN VIEW PERIMETER FOR ENTIRE RECOMMENDED KEY IN 6" - 9"; OUTLET TO FLAT AREA - NO WELL DEFINED CHANNEL OUTLET TO WELL-DEFINED CHANNEL OUTLET STABILIZATION STRUCTURE NOT TO SCALE DETAIL 1 TYP CG805 A CG805 B NOT TO SCALE SECTION NOT TO SCALE SECTION FOR ENTIRE PERIMETER KEY IN 6" - 9"; RECOMMENDED CG805 A CG805 B UNDER LINER GEOTEXTILE RIPRAP NCDOT CLASS B UNDER LINER GEOTEXTILE MANUAL 6.41 FOR ADDITIONAL INFORMATION REFER TO NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (1/2 INCH OR MAINTENANCE IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION9. CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE APRON. PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEEDED TO FIT SITE ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND 8. SLIGHTLY BELOW IT. TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFILL AT THE END. MAKE THE7. HIGHLY WEATHER-RESISTANT AND WELL GRADED. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR,6. DIAMETER. REFER TO TABLE FOR LOCATION, DEPTH AND LENGTH OF PROTECTION. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE MAXIMUM STONE 5. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER.4. REPLACE THE ENTIRE FILTER CLOTH. ABOVE THE DOWNSTREAM LAYER A MINIMUM OF 1 FOOT. IF THE DAMAGE IS EXTENSIVE, DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP SO THE TOP LAYER IS BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY 3. SHOWN ON THE PLANS. THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED GRADING LIMITS2. UNDISTURBED SOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS. DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THE ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES 1. CONSTRUCTION VOLUME CONTROL FACILITY STORMWATER DETENTION/2:12:1 2' MIN. WIDTH NOT TO SCALE DETAIL2 PRETREATMENT FOREBAY VOLUME CONTROL FACILITY STORMWATER DETENTION/ PRETREATMENT BASIN SEDIMENT FOREBAY/ ROCK CHECK DAM NWL NWL RIPRAP APRON PRETREATMENT BASIN SEDIMENT FOREBAY/ (VARIES) LENGTH (VARIES)LENGTHFLOW (VARIES)NORMAL WATER LEVEL FLOW (VARIES) LENGTH NORMAL WATER LEVEL WOVEN GEOTEXTILE FABRIC NATIVE SOIL 1' MIN. DEPTH WOVEN GEOTEXTILE FABRIC 2' MIN. DEPTH PLAN VIEW PROFILE VIEW TYP CG805S.HAGGARDM.MEYERG.LYNNSEDIMENT AND EROSION CONTROL DETAILS 3