Loading...
HomeMy WebLinkAboutSW6200102_Plan (Ex. DA)_20200608ELEVATION=265.75' BOLT OF FIRE HYDRANT INSCRIBED "X" ON BONNET #22 TBM ELEVATION=263.66' E=1991187.54 N=484419.59 #31 RB&C ELEVATION=260.32' E=1990596.36 N=484414.62 #32 RB&C ELEVATION=251.86' E=1990440.94 N=483961.51 #7 RB&C ELEVATION=261.48' E=1990917.38 N=484492.73 #5 RB&C ELEVATION=255.43' E=1990436.55 N=484427.73 #6 RB&C ELEVATION=262.75' E=1991205.96 N=484027.22 #3 RB&C ELEVATION=266.42' E=1991347.23 N=484491.19 #4 RB&C ELEVATION=258.52' BOLT OF FIRE HYDRANT INSCRIBED "X" ON BONNET #23 TBM ELEVATION=261.6' P-02 BORE HOLE INV.OUT=244.19' (E) INV.IN=244.33' (SW) TOP=249.97' INV.OUT=241.87' (S) INV.IN=243.76' (E) TOP=249.82' INV.OUT=244.94' (NE) TOP=247.66' 18" RCP 1 8 " RCP 18" RCPELEVATION=257.1' B-02 BORE HOLE ELEVATION=255.5' B-01 BORE HOLE ELEVATION=259.8' P-04 BORE HOLE ELEVATION=256.0' S-03 BORE HOLE ELEVATION=253.3' S-04 BORE HOLE ELEVATION=252.1' B-05 BORE HOLE ELEVATION=259.2' S-02 BORE HOLE ELEVATION=258.5' P-03 BORE HOLE (NO ACCESS TO INVERTS) TOP=256.76' (NO ACCESS TO INVERTS) TOP=256.80' CONC CONC CI W/3SBW 84" CHLK CI CI CI CONC SW 72" CHLK DI BOLLARDS (4) CB CB ELEVATION=260.8' S-01 BORE HOLE ELEVATION=259.7' B-04 BORE HOLE 72" CHLK (4) BOLLARDS ELEVATION=260.1' P-01 BORE HOLE 84" CHLK W/3SBW84" CHLK W/3SBWW/3SBW 84" CHLK ASPHALT ASPHALT ASPHALT ASPHALT ASPHALT18" C&G 18" C&G 18" C&G18" C&G 18" C&G18" C&G18" C&G18" C&G18" C&G 18" C&G (NO ACCESS TO INVERTS) TOP=265.06' CI WW WW HW HW WW WW INV.=260.00' INV.=260.97' ASPHALT TOP=262.48' COMM MH BOTTOM BOX=242.28' TOP=251.94' COMM MH BOTTOM BOX=243.25' TOP=252.87' COMM MH PVC PIPES VERTICAL UNKNOWN 6" CURB 6" CURB 6" CURB6" CURB 6" CURB6" CURB 6" CURB 6" CURB(NO ACCESS TO INVERTS) INV 251.25' (FROM ASBUILTS) TOP=262.10' (NO ACCESS TO INVERTS) INV 250.68' (FROM ASBUILTS) TOP=262.04'24" RCPEXISTING ASPHALTPARKING LOT EXISTING ASPHALT PARKING LOT EXISTING ASPHALT WOODED AREA WOODED AREA WOODED AREA WOODED AREA WOODED AREA 247.63 DI 247.65 DI 247.67 DI 247.69 DI248249 249.81 CB249.82 CB 249.94 CB 249.97 CB 249.99 CB250 250250250 250.00 CB 250.18 CB 250.19 CB 2 5 1 251 2512512512512512 5 1 T 2 5 2 252252252 2 5 2 252252 2 5 2 252 252252252 T 253 253 253253253253253253253 253253253254 254 2 5 4 254254254254254254254254 254254254254P 2 55255255255255 255255 255 255255255255255255255 255 2 5 6256256256256 256256256256256 2 5 6 2 5 6 256256256256256256 256256 256 256.74 CI 256.75 CI 256.79 CI 256.80 CI 256.80 CI 256.81 CI 256.87 CI 256.88 CI 2 5 7257257257 257257257257257257257257257257257257257257257257257257 258 258 2582582582582 5 8258258258258258 2 5 8258258258258258258258258 258 258 DILAPIDATED FENCEEAGLE TALON DRIVE EAGLE TALON DRIVE259 259259 259259259259 259259 259 259 259259259259259259259 259259259259259260.00 RCP 260 260 260 260 260 260 260 260260260260260260 260260 260 2602602602602602602 6 0 260260260260260 26026018" RCP 260.97 RCP 261261 261261261 2612612612612 6 1 261 261 2612612612612612612612612612 6 1 261261261261261261261261261.52 WW 261.58 WW261.86 WW 261.88 WW 261.88 WW 261.89 WW 261.95 CI 2 6 2 262 262262262262262 262 2 6 2 262262262262262262262262262262262262 262 262.00 CI 262.02 CI 262.03 CI 262.05 CI 262.08 CI 262.10 CI 262.12 CI T 262.57 WW 262.60 WW262.78 WW 262.79 WW 262.81 WW 262.83 WW 262.85 HW 262.89 HW 263 263263263263 2 6 3 263263263263 263 263263 263263263263EL JB #108689 EL JB #112804 WM WV WV WV WVFH BOX HOT WMV PIV FHFH WV WV WV FH WV FH WV PPL PPL PPL #79677 83696 PPL PPL PPL #108680 EL JB 83648 #79679 PPL #79677 83740 PPL 83786 #79678 PPL TOP=254.09' EL MH 263.76 HW 263.79 HW 264 264 264 264 264 264.99 CB 265 265 265265 265.06 CB 265.12 CB265.20 CB 266 266 26 6 U.S. ARMY CORPS OF ENGINEERSHPTC_CG750.dgnANSI DCHECKED BY:DRAWN BY:ISSUE DATE:SHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONP:\Projects\017001\03 CAD_BIM\_Sheets\05_Civil\HPTC_CG750.dgn05-JUN-202014:38 171-20-13R. BOSTONW912PM-19-C-000769 DARLINGTON AVENUEWILMINGTON DISTRICTWILMINGTON, NORTH CAROLINAFORT BRAGG, NORTH CAROLINASOF HUMAN PERFORMANCE TRAINING CENTER (HPTC)FY18 PN 79443W912PM-18-R-0003SOLICITATION NO.:CERTIFIED FINAL FAST-TRACK (ISSUED FOR CONSTRUCTION)DECEMBER 2019STAGING AREA CONTRACTOR CG750S.HAGGARDM.MEYERG.LYNNN GEOGRAPHIC COORDINATE DATA HORIZONTAL DATUM: NORTH CAROLINA STATE PLANE, NAD83. VERTICAL DATUM: NAVD88. UNITS OF MEASURE: U.S. SURVEY FEET. COORDINATES SHOWN IN FORMAT OF EASTING, NORTHING AND ELEVATION. GENERAL NOTES 2. 1. PLANS FOR ADDITIONAL GRADING REQUIREMENTS. SLOPES AND GRASSED. SEE THE EROSION CONTROL DISTURBED AREA SHALL BE GRADED TO MATCH EXISTING REFER TO SHEET C-001 FOR GENERAL NOTES.PRE DEVELOPED HYDROLOGYGRAPHIC SCALE: 1"=40'-0" 120'80'40'020'40' Q100: 13.99 Q50: 11.50 Q25: 9.35 Q10: 6.54 Q5: 4.90 Q2: 2.69 Q1: 1.52 PEAK FLOW (CFS) WEIGHTED CN: 65 DRAINAGE AREA: 2.49 ACRES AREA 2 Q100: 8.56 Q50: 7.03 Q25: 5.72 Q10: 4.00 Q5: 3.00 Q2: 1.64 Q1: 0.93 PEAK FLOW (CFS) WEIGHTED CN: 65 DRAINAGE AREA: 1.52 ACRES AREA 1 PRE DEVELOPED DRAINAGE AREA 1 PREDEVELOPMENT DRAINAGE AREA 2 PREDEVELOPMENT TO BE REMOVED EXISTING BUA TO BE REMOVED EXISTING BUA