Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNCG060021_DMR_20210707SEMI-ANNUAL STORMWATER DISCHARGE MONITORING REPORT
For North Carolina Division of Water Quality General Permit No. NCG060000
Date submitted: 07-07- 2021
CERTIFICATE OF COVERAGE NO. NCG060021. SAMPLE COLLECTION YEAR 2021.
FACILITY NAME ;meson Farms inc, RECEIVED FACILITY ACTIVITIES INCLUDE (check all that apply):
Roarin River Feed Mill ❑ use/process meats N use animal fats/byproducts
COUNTY Wilkes JUL 1 9 ZD21 DISCHARGING TO SALTWATERS? ❑YES [;LINO
PERSON COLLECTING SAMPLES James Brown; CENTRAL FR-ES
LABORATORY Statesville N.0 Lab Cert. P 440DWR SECTION
Part A: Storm water Benchmarks and Monitoring Results
PLEASE REMEMBER TO SIGN ON THE REVERSE -->
Total event rainfoll z =.00 or ❑ No discharge this period'
Outfall No.
Sample Collected,
Mo./dd./yr.
TSS,
mg/L
pH,
Standard units
COD,
mg/L
Oil and Grease,
mg/L
Fecal Coliform',
Colonies per 100 ml
Enterococcil,
Colonies per 100 ml
Benchmark
-
100 or 504
Within 6.0 — 9.0
120
30
1000
500
RMV - Oil.
06/22/2021
12.42
6.4
27
<5.05
NA
NA
RRIV - 02
06/22/2021
10.82
6,5
34
<5.13
NA
NA
RRIV - 04
06/22/2021
11.8
6.5
<25
<5.10
NA
NA
1 Only applies to facilities that use/process meats.
'The total precipitation must be recorded using data from an on -site rain gauge.
i For sampling periods with no discharge at any outfalls. You must still submit this discharge monitoring report with a checkmark here.
'See General Permit text, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? Yes ❑ no
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new motor oil/month.
(if es, complete Part B)
Outfall No.
Sample Collected,
Mo,/dd,/yr,
Oil and Grease,
mg/L
Non Polar Oil
&Grease/TPH
mg/L
TSS,
mg/L
pH,
Standard units
New Motor Oil Usage,
Annual average gal/mo
Benchmark
-
30
15
100 or 504
6.0 — 9.0
-
RRIV - 04
06/22/2021
-5,10
<5.30
11.8
6.5
irU5
1 Only applies to facilities that use/process meats.
'The total precipitation must be recorded using data from an on -site rain gauge.
' For sampling periods with no discharge at gny outfalls, you must still submit this discharge monitoring report with a checkmark here.
'See General Permit text table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
SWU-249 Last Revised: October 18, 2012
Paxe I of 2
*FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALLTRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
+ TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES rI NO L]
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES 0 NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR including all "No Discharge," reports, within 30 days of receipt of the lab results or at end o
monitoring period in the case of "No Discharge" reports), to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, NC 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false
information, including the possibility of fines and imprisonment for knowing violations."
(Signakbre of Permittee)
7 7--agar
(Date)
Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4
SWU-249
Last Revised: October 18, 2012
Page 2 of 2
NCDENR
Storm water Discharge Outfall (SDO)
Qualitative Monitoring Report
Forguidance on filling out this form, please visit. htto://nortal.ncdennorg/web/wq/ws/suInpdessw##tab-4
Permit No: N C G 1) 6/0/0A)L( or Certificate of Coverage No. N { /fl/0%6/0/0/2/1
Facility Name: Tyson I:arins Iiic.-Roaring; River Feed yTill
County: Wilkes
Phone No: ;;i6.6gG.274'I_
Inspector: Ravinond Nichols.
Date of Inspection: QU 0 /2021_
Time of Inspection: ll .4 S tam
Total Event Precipitation (inches): 1.00
Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See
information below.)
Yes No
Please verify whether Qualitative Monitoring must be performed during a "representative storm event"or
"meusureablestorm event" (requirements vary, depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed
during a "representative storm event" or during a "measureable storm event." However, some permits do not
have this requirement. Please refer to these definitions, if applicable.
` A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is
preceded by at least 72 hours (3 days) in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A "measurable storm event' is a storm event that results in an actual discharge from the permitted
site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is E
representative For local storm events during the sampling period, and the permittee obtains approval from the
local DWQ Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
re of Permittee or Designee)
Page 1 of 2
SWU-242, Last modified 10/25/2012
1. Outfall Description: /�
Outfall No. 9,N — O k Structure (pipe, ditch, etc.) 0—% 1 V Ct ��-
Receiving Stream: U.n A Cj-Mt4A fit' b`tAW, --d a-hz N f•dlt n .\lvx
De nbe the industrial activities that occur within the outfall drainage area: MOLK. n!, OF
2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint
(light, medium, dark) as descriptors: L. Ski'
3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak
chlorine odor, etc.): ARC, A -f-
4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and
5 is very cloudy: V
2 3 4 5
S. Floating Solids: Choose the number which best describes the amount of floating solids in the
stormwaterdischarge, where 1 is no solids and 5 is the surface covered with floating solids:
10 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended solids in
the stormwater discharge, where 1 is no solids and 5 is extremely muddy:
0 2 3 4 5
7. Is there any foam in the stormwater discharge? Yes
S. Is there an oil sheen in the stormwater discharge? Yes to'
9. Is there evidence of erosion or deposition at the outfall? Yes i�Q
10. Other Obvious Indicators of Stormwater Pollution:
List and describe
Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition maybe
indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242, Last modified 10/25/2012
��A
��
NCDENR
Storm water Discharge Outfall (SDO)
Qualitative Monitoring Report
Forguidance on filling out this form, please visit: http-.//12ortal.nedenr.org/web/wqlws/su/npdessw4tab-4
Permit No: iy;C4GY.(% (zl()411(„ )i(]_or Certificate of Coverage No. N/C/C/0/6j0/0/2/1
Facility Name: Tyson FFi_rns lnc. Roaring l� tivec 1�eed Miil
County: Wilkes
Phone No. 33b.696.2741
Inspector: Raymond Nichols
Date of Inspection: 07 07 'L021
Time of Inspection: W So An,
Total Event Precipitation (inches): 1,00
Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See
information below.)
M11'Xe5 ❑ No
Please verify whether Qualitative Monitoring mustbe performed during a "representative storm event" or
"measureablestorm event" (requirements vary, depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed
during a "representative storm event" or during a "measureable storm event." However, some permits do not
have this requirement. Please refer to these definitions, if applicable.
A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is
preceded by at least 72 hours (3 days) in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A "measurable storm event" is a storm event that results in an actual discharge from the permitted
site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is
representative for local storm events during the sampling period, and the permittee obtains approval from the j.
local DWQ Regional Office.
By this signature, I certify that this reportis accurate and complete to the best of my knowledge:
(SignaUre of Permittee or Designee)
Pagel of 2
SWU-242, Last modified 10/25/2012
I. Outfall Description:
outfall No. Ill' D Structure (pipe, ditch, etc.) k
Receiving Stream: uR i ervi A, J AK:-Vi � 'u
Desrsibe the ind vial activities that Occur within the outfall drainage area:
2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint
(light, medium, dark) as descriptors: \_ !�Y'V
3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak
chlorine odor, etc.): -t.
4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and
5 is very cloudy:
1 d 3 4 5
5. Floating Solids: Choose the number which best describes the amount of floating solids in the
stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids:
1 P 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended solids in
the stormwater discharge, where 1 is no solids and 5 is extremely muddy:
1 0 3 4 5
7. Is there any foam in the stormwater discharge? Yes �l
8. Is there an oil sheen in the stormwater discharge? Yes l
9. is there evidence of erosion or deposition at the outfall? Yes
10. Other Obvious Indicators of StormwaterPollution:
List and describe
Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be
indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242, Last modified 10/2S/2012
�P. .
NCDENR
Storm water Discharge Outfall (SDO)
Qualitative Monitoring Report
Forguidance on filling out this form, please visit: htti2:./.Iportal.ncdenr.oi-g/web/wq/ws/su/npdessw#tab-4
Permit No: N C'Ci`t?/6 0/0i0/0 or Certificate of Coverage No. NIC%Gf0/6f0/0j2J1
Facility Name: T spa—'. ns Inc:. Roaring River fed %Mill
County: Wilkes
Phone No: 336.696.2741
Inspector: Raymond Nichols
[sate of Inspection: 07 '0� 7J2U21-
Time of Inspection: 1 k-. 55 4:1,W-
Total Event Precipitation (inches): 1.00
Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See
information below.)
C9'*'Y'es ❑ No
Please verify whether Qualitative Monitoring must be performed during a "representative storm event"or
"measureablestorm event"(requirements vary, depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed
during a "representative storm event" or during a "measureable storm event." However, some permits do not
have this requirement. Please refer to these definitions, if applicable.
i
A "representative storm event" is a storm event that measures greaterthan 0.1 inches of rainfall and that is
preceded by at least 72 hours (3 days) in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A "measurable storm event" is a storm event that results in an actual discharge from the permitted
site outfall- The previous measurable storm event must have been at least 72 hours
F
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is
representative for local storm events during the sampling period, and the permittee obtains approval from the
local DWQ Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
re of Permittee or Designee)
Pagel of 2
SWU-242, Last modified 10/25/2012
1. Outfall Description:
Outfall No. QZ 1\ Q 4 Structure (pipe, ditch, etc.) 5 hGLkko W SyaeA( l+A-a%
Receiving Stream: UIYII�ILC(Y�P.[i S �10c try -�c� jri1� � 3:�h -VCX
De b the ind stria) activities that occur within the outfall drainage area: rn.0.V,` n q OF
`�Cltf�kc� �rri
2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint
(light, medium, dark) as descriptors:.
3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak
chlorine odor, etc.): Nt y..e- _
4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and
5 is very cloudy:
1 02 3 4 5
S. Floating Solids: Choose the number which best describes the amount of floating solids in the
stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids:
1 0 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended solids in
the stormwater discharge, where 1 is no solids and S is extremely muddy:
1 0 3 4 5
7. Is there any foam in the stormwater discharge? Yes
8. Is there an oil sheen in the stormwater discharge? Yes
4. Is there evidence of erosion or deposition at the outfall? Yes
10. Other Obvious Indicators of Stormwater Pollution:
List and describe
Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be
indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
5wU-242, Last modified 10/25/2012