Loading...
HomeMy WebLinkAbout20201510 Ver 1_B-5624 Utilities_20210719 Submitted 6/3/2021 Er r 1‘ aD c • u r>, r T.I.P. NO. SHEET N.. � ',1 • ' - `S a ,� \ \ \ \ `�`'i PERMIT DRAWING `GGGjG___j_i►►►, BEGIN PROJECT v SHEET 1 OF 4 B-5624 STATE OF NORTH CAROLING B-5624 Uo 1 � DATE. 3-11-2021Crass 141 4), ft ` DIVISION OF HIGHWAYS13aoliWi , , Moon Island _ .war , OTE. ALL UTILITY WORK SHOWN ON THIS IslanenSHEET WILL BE DONE BY OTHERS. Creein9 UTILITIES BY OTHERS PLANS NO PAYMENT WILL BE MADE TO iilk e ee or�•_ THE CONTRACTOR FOR UTILITY WORK 71 . /' lit eekSHOWN ON THIS SHEET. , AI a I I 111 41D4 . 46 dr . BRUNSWICK COUNTY ,, a VI, END PROJECT 1 al • • N B-5624 i LOCATION: REPLACE BRIDGE NO.57 OVER DRIVING CREEK c...) VICINITY MAP N.T.S ON NC211 (GREEN SWAMP ROAD NW)rS „„r TYPE OF WORK: RELOCATION OF COMMUNICATION LINES #L4 PS U0 BEGIN TIP PROJECT B-5624 _2 4 U0 _; —L— POT STA. 10 + 44.20 END BRIDGE o —L— POT STA. 17 + 81 +/— END TIP PROJECT B-5624 ° e —L— POT STA. 24 + 47.19 cP SITE 2 SITE 5 -/- .4 . :_ _ , _. . . StS ue —Ke— as i� ^ \ r SIB O * * * 3 a *SITE 1 BEGIN BRIDGE ► 3 1 3 \r y N * \c S 1 * 3 * * * L— POT STA: 17 + 11 +/ * tt tx 3 I * * 3 3 3 3 3 : 1.- - 3 ten. — via L' c. Zrll .... � TO SR 1341 ' --� `-�_ '1 J � � .. ' -- ' — _— TO SR 1448 � 11 �., , : ——— i,ww. rn''mri - il — — — v. — — — —111.6 —s KB -i•- - - - --"-- -- -- - - - —*— — — —Ill . IL3 * A wr —LOFT— �` * rs Mr •.rs..r s Mr * * * * 3 JS Mr a Mr \ it \r * 3 _ 3. _ ` 3. 3 13. 3 3. * 3. BEGIN NSTR UC'TIQ1sI 3 * * '� 3 fiRT y 3 3 � 3 END CON�ST1C 'ION —L STA. 14 + 44.20 * . * —L,— *POT STA. 243447.19 = -.� Y e,. T-_, '_� S A,* Qeyf Q�,�Q, !e LTRT_ _ _`_ _a» - - - .�� - - -- --ale . a,. ere— - -=1,IJ T=.,�'_I' - TA� 4 + 07. 78, 0.00' LT/RT SITE 1 SITE 3 WETLAND AND SURFACE WATER IMPACTS PERMIT (,) .1 . c e. GRAPHIC SCALES , ' INDEX OF SHEETS , F UTILITY OWNERS WITH CONFLICTS , PREPARED IN THE OFFICE OF: \ �, DIVISION OF HIGHWAYS 50 25 0 50 100 //TM UTILITIES UNIT (n 1020 BIRCH RIDGE DR I ' ' ' SHEET 11 t 0.: DESCRIPTION: - _ RALEIGH NC 27610 (A) - ,'� s' FAX PHONE(919) 250-4151 707-6690 z PLANS AT&T - COMMUNICATIONS CO o UO-1 TITLE SHEET (B) ATMC COMMUNICATIONS �F sQ,, (n u) 50 25 0 50 100 (C) MCNC - COMMUNICATIONS SA//s 411.OF TRPN I I I UO-02 THR U UO-03 UBO PLAN SHEETS w w PROFILE (HORIZONTAL) Bo Hemphill, PE EASTERN UTILITIES MANAGER FOR THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ~ a 10 5 0 10 20 thil_ I Freddie Bunn UTILITY PROJECT MANAGER Kelvin Martin,EI SENIOR UTILITIES ENGINEER cn• c�w � (v) PROFILE (VERTICAL) Matthew Ward PROJECT UTILITY COORDINATOR Larry M.James,Jr. SENIOR UTILITY COORDINATOR CO ( mw (n / \ / ` J ` J CO (i) t (OCO � \ Submitted 7/19/21 6 PROJECT REFERENCE NO. SHEET NO. 0- B-5624 U0-2 50' 25' 0 50' 100' R' SHEET NO. 04 \ / ROADWAY ERSIGN HYDRAULICS co SCALE: 1"=100' OPEN HDD DRILL TRENCH \I-7,0 INCOMPLETE PLANS l co DO NOT USE FOR R/W ACOVISITION OPEN HDD DRILL TRENCH \i'27 o, CDM -- SUNGATE DESIGN GROUP`P.A�Pnea Smith e'ROV ° AI ��oa o" so DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ± s AA A A PERMIT DRAWING A A A i J MCNC 10' MINIMUM II I THE NATURE CONSERVANCY J ATHE NATURE CONSERVANCY :.. �r BELOW STREAM 1 _IL SHEET 2 O F 4 At A m AT&T 10 MINIMUM o ± A BELOW STREAM " DATE: 03-11-2021 * OPEN A HDD DRILL A SITE 4 * ,, I MCIt NEW JIANDHOLE TO TRENCH A ± A AA a SITE�2 INTERCEPT- EXISTING `4 ± SITE 5 0 EXISTING R/W / 1 * IP h 1 A A 0 JO B� aRov orG(ro)Tc¢GaBLE x u c(ED)TEL.BLE.. PROP urc lrol TEL cadre 'FEN TEL CABLE PROP uir rol TEL Est eAo= + w vRov DIG(eo)T.` SC w000s ai R VIS AL WOODS z F F _ E ,M F� C F D AT& PAN E:G B EGiF N i8 'LE4 eTM B,M— F r E .. FiT&T�( M a' rrr r„ s ay � " .,.: »F AB.. n Eo------ F RKER R (rm-rec DAnLLh —— r,Te jrl r F c REEK SWAMP RD WV "'� ICI i 15"RC•— ABANDONED I Olj ABANDONED I ABANDONED _1 B57 VARIES 15 '-IV I.:::ICvm n ar -- -- 'Irk _— -- ET ET o , — � � � � — — "- � T Eo- 'T-�' .. -. .. — .E .— � ��-ram, _.. -.. :. -a, Bj 't���r -r'�. wL — a: .. _ JN R I<. 'T :irrirrl Si T T�faBL GTD + + W GTD I H 'm Fo MnRy.inir' :!...: —— GTD — ——_ ILWLIZR C 1 E1,i _ 1� IN ± wtow000s ___— �S NGNNIrC AT C m NDNMT + Z fi wO 9 �,,,,�. _— ..��,., . C C CC EXISTING R/W ——— - l — — `� .o«_ mT 'r - C C 2 R MOUNTAIN TIMBERCO II LLC PEE [\ ---' ��—L =/ ('= \y\ E C E �' E V ———— '/// — leL\ —� WI R —�— `,—�— \— \ * A, ± N, Q I I, ± ± \± PDE PDE P1DE PDE PDE \\ \I ± AT&T iFIH TO INTERCEPT ± n THE NATURE CONSERVANC4Y SITE 2 ITE EXISTING 3X1 .25 CDR 5' / ± ± ±\ 1 ROLL±PIPE @ 5 ± DEEP MIN. + A, ± 0 ,k + 1 .25" SDR 11 ATMC HH TO INTERCEJPT 1 ± A $ITE ± \\ ROLL PIPE @ 5' - A EXISTING A A / DEEP MIN. 3X1 .25" SDR 11 ti / ROLL PIPE @ 10' W o DEEP BENEATH a STREAM BED 0 Z L\ Cu '////, BRIDGE APPROACH SLAB FOR-LDET-SEE SHEET NO.2B-1 100 100 BM•I BM•2 90 -L-STA.I7+72.07 -L-STAl9+,9.32 90 3933'RT,EL.62.5/' 36 LT.EL 5522' I PI= I6+83.00 R/-SPIKE SET IN I0•CEDAR R/R SPIKE.'ET IN IO"OAK `— L_ OPEN `HDD DRILL + EL =-68.63'VC = 230' CL STA 17+46-L-, TRENCH K = l54 CL 5%f45"PSG 80 END OVERLAY Pl= 12-f95.00 ms 6o mpn 80 EL = 65.12 p w/4 7 emo BENT'APS off-BE6�I15JhLGRADE VC = 189' S W DEG ATMC TRENCH K - 300 3 X3 X3 BORE PIT & STA 12+00.00 DS = >80 mph 70 HANDHO_E PLACEMENT —� PROPOSED GRADE OPEN HDD CIAL 64•83 (+IU.Apki. n rI45-e6-Ly 70 a AT&T 5'X 6' 603E PIT 8'_ TRENCH o ° ~� FROM EXISTING EOP a. (+)0.3053X 60 _ _ ATMC \ /(' 60 Lu- iB �� '•�..� FA)N&SfINC�(r �'ND ❑ ¢ o z - m z m 19+44. / a J z U j 50 ycNC 4'X4'X3 BORE PIT F -, w Z 50 .Ez � m2 >- � ma min 10' AA,A , MCNC NE HANDHOLE TO ❑ cc o 0,40. IN I1 RCE T EXIS1 ING — Q❑ 00 - �1 I.,-,,� _1 z i— MCNC ,.Q ccr-criH �� m Q MCNC ALL E9�v ELIVIL 4949. »� 10 11 12 13 14 15 16 17 18 19 20 21 Submitted 6/3/2021 ._ PROJECT REFERENCE NO. SHEET NO. Cr B-5624 UO3 c1 50' 25' 0 50' 100' R'W SHEET NO. ROADWAY ENGINEER SIGN HYDRAULICS ENGINEER SCALE: 1"=100' HDD DRILL OPEN `ti INCOMPLETE PLANS TRENCH �O DO NOT USE FOR R/W ACQUISITION o HDD \!77 TOPENCH o, CDM �- SUNGATE DESIGN GROUP`P.A�Pnea smith ���eF" .lbS. ''�oa o''''' 890 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED x PERMIT DRAWING SITE 5 THE NATURE CONS=rVANCY± A SHEET 3 OF 4 * 1 ± A ± E DATE: 03-11-2021 O ± HDD±DRILL OPEN 0 ± 4 TRENCH ± O A 1 0 ± cVMCNC J< * ± EXISTING Riw x + yl TEL CAB S m PROP U/G(Fa.TEL CABLES ± 1 x * A PROP O MCNC NEW�HANDHQLE TO �� N •••'A Or/O�FO,rCEOOEEEAT&TA ''FOASS .NTERCEPT EXISTING . E F —` a,,.... _ _S' FO MARKE' —d'IM _—— —— ± .. T -.. c�. TFo—— TFo—— llailil ~~ =IP' AB4N DO ED NC 211-GREEN SWAMP RD NW OW W BST VARIES _ N am � we'——T Fo—— Y y _— G 2r - --- ——T FO— _ ra— I W aoP w�Fa W GTD , 27' ± Z LLI N i PaLe) -1JiG IFOI rep cna�e + .. .. .. _ o f" ATMC (TNT AT&T HtI TO INTERCEPT A a IM A A A A EXISTING ,, } A— EXISTING Riw x °` 0 X X TMC HH TO INTERCEPT r A,_ t A A A EXISTING �� x ± A THE NATURE CONSERVANCY A A 1 SITE 3 ,3X1 .25" SDR 11 \ ± ROLL PIPE @ 5 A A A A A DEEP MIN. A A A x ± x FOR-LDET-SEE SHEET NO.2B-2 100 100 OPEN HDD DRILL TRENCH 90 HOD DRILL OPEN 90 TRENCH AT 1-5X 6'IBORL PIT 8' 80 FROM EXISTING EOP 80 FED DRILL OPEN ATMC TRENCH 3'X3'X3= BORE PIT & HANDHOLE PLACEMENT 70 PROPOSER GRADE 70 f-J0.5862% 60 ATMC w 60 AT&T EXl lNG GR r cc z Q m „, o ¢ o Qo 50 > 1-j m w o v MCNC 4'X4'X3' BORE PIT 50 wOI— m-m 4,o a o I- CO a MCNC NEW HA DHOLE TO 0,40. w o 0.5 INTERCEPT ISTING- *2 40 CD Q I I 40 O.oa Z v .L ..Ir ... 21 22 23 24 25 Submitted 6/3/2021 B-5624 NEU ENVIRONMENTAL PERMIT NARRATIVE AT&T (Telephone): AT&T has an U/G fiber optic cable is in conflict throughout the project along the (North side) of NC 211 (Green Swamp Road). AT&T is encroaching within the NCDOT R/W. AT&T will place a new U/G conduit (fiber optic) cable that follows along the (North side) of NC 211 (Green Swamp Road) inside the NCDOT R/W by directional bore and trenching. New cables will tie back into existing lines by placing two new handholes at the bore pit locations. Handhole locations are at -L- Sta. 10+82 +/- and -L-Sta. 24+39 +/-. This bore will produce no permanent impacts to the wetlands. All stations are approximate in this report. Contact: Mr. Yuri Moody; Email yuri.moody@genxcgroup.com, Phone 786-519-4809. ATMC (Telephone): ATMC has an U/G fiber optic cable is in conflict throughout the project along the (South side) of NC 211 (Green Swamp Road). ATMC is encroaching within the NCDOT R/W. ATMC will place a new U/G conduit (fiber optic) cable that follows along the (South side) of NC 211 (Green Swamp Road) inside the NCDOT R/W by directional bore and trenching. New cables will tie back into existing lines by placing two new handholes at the bore pit locations. Handhole locations are at -L- Sta. 10+82 +/- and -L-Sta. 24+39 +/-. This bore will produce no permanent impacts to the wetlands. All stations are approximate in this report. Contact: Mr. Michael Barry; Email bmichael@atmc.com; Phone 910-755-1709. MCNC (Telephone): MCNC has an U/G fiber optic cable is in conflict throughout the project along the (North side) of NC 211 (Green Swamp Road). MCNC is encroaching within the NCDOT R/W. MCNC will place a new U/G conduit (fiber optic) cable that follows along the (North side) of NC 211 (Green Swamp Road) inside the NCDOT R/W by directional bore and trenching. New cables will tie back into existing lines by placing two new handholes at the bore pit locations. Handhole locations are at -L- Sta. 10+30 +/- and -L-Sta. 25+05 +/-. This bore will produce no permanent impacts to the wetlands. All stations are approximate in this report. Contact: Mr. Brett Boger; Email brettboger@telics.com Phone 336-692-6477. Conclusion (Total Impacts due to Utilities): Permanent Fill in Wetlands 0.00 acres Hand Clearing in Wetlands 0.00 acres