HomeMy WebLinkAbout20201510 Ver 1_B-5624 Utilities_20210719 Submitted 6/3/2021
Er r 1‘
aD
c • u r>, r T.I.P. NO. SHEET N..
� ',1 • ' - `S a ,�
\ \ \ \ `�`'i PERMIT DRAWING
`GGGjG___j_i►►►, BEGIN PROJECT v SHEET 1 OF 4
B-5624 STATE OF NORTH CAROLING B-5624 Uo 1
� DATE. 3-11-2021Crass 141 4), ft ` DIVISION OF HIGHWAYS13aoliWi
, , Moon Island
_ .war , OTE.
ALL UTILITY WORK SHOWN ON THIS
IslanenSHEET WILL BE DONE BY OTHERS.
Creein9 UTILITIES BY OTHERS PLANS NO PAYMENT WILL BE MADE TO
iilk e ee or�•_ THE CONTRACTOR FOR UTILITY WORK
71 . /' lit eekSHOWN ON THIS SHEET.
, AI a I I 111 41D4 . 46 dr . BRUNSWICK COUNTY
,, a VI,
END PROJECT 1 al
• • N B-5624 i
LOCATION: REPLACE BRIDGE NO.57 OVER DRIVING CREEK
c...) VICINITY MAP N.T.S ON NC211 (GREEN SWAMP ROAD NW)rS
„„r TYPE OF WORK: RELOCATION OF COMMUNICATION LINES
#L4
PS
U0
BEGIN TIP PROJECT B-5624 _2 4 U0
_;
—L— POT STA. 10 + 44.20
END BRIDGE
o —L— POT STA. 17 + 81 +/— END TIP PROJECT B-5624
° e —L— POT STA. 24 + 47.19
cP
SITE 2 SITE 5
-/- .4
. :_ _ , _. . . StS
ue —Ke— as
i� ^ \ r SIB
O * * * 3 a
*SITE 1 BEGIN BRIDGE ► 3
1 3 \r y N * \c S
1 * 3 * * * L— POT STA: 17 + 11 +/ * tt
tx 3
I *
* 3
3
3 3 3 : 1.- -
3
ten. — via L' c. Zrll ....
� TO SR 1341 ' --� `-�_ '1 J � � .. ' -- ' — _— TO SR 1448 �
11 �.,
, :
——— i,ww. rn''mri -
il — — — v. — — — —111.6 —s KB -i•- - - - --"-- -- -- - - - —*— — — —Ill
. IL3 *
A wr —LOFT— �`
*
rs Mr •.rs..r s Mr * * * * 3
JS Mr a Mr \ it \r * 3
_ 3.
_ ` 3.
3
13. 3 3. * 3. BEGIN NSTR UC'TIQ1sI 3 * * '� 3
fiRT
y 3 3 � 3 END CON�ST1C 'ION
—L STA. 14 + 44.20 * . * —L,— *POT STA. 243447.19 =
-.� Y e,. T-_, '_� S A,* Qeyf Q�,�Q, !e LTRT_ _ _`_ _a» - - - .�� - - -- --ale . a,. ere— - -=1,IJ T=.,�'_I' - TA� 4 + 07. 78, 0.00' LT/RT
SITE 1 SITE 3
WETLAND AND SURFACE WATER IMPACTS PERMIT
(,)
.1
. c e. GRAPHIC SCALES , ' INDEX OF SHEETS , F UTILITY OWNERS WITH CONFLICTS , PREPARED IN THE OFFICE OF: \
�, DIVISION OF HIGHWAYS
50 25 0 50 100 //TM
UTILITIES UNIT
(n 1020 BIRCH RIDGE DR
I ' ' ' SHEET 11 t 0.: DESCRIPTION: - _ RALEIGH NC 27610
(A) - ,'� s' FAX PHONE(919) 250-4151
707-6690
z PLANS AT&T - COMMUNICATIONS
CO o UO-1 TITLE SHEET (B) ATMC COMMUNICATIONS �F sQ,,
(n u) 50 25 0 50 100 (C) MCNC - COMMUNICATIONS SA//s
411.OF TRPN
I I I UO-02 THR U UO-03 UBO PLAN SHEETS
w w PROFILE (HORIZONTAL) Bo Hemphill, PE EASTERN UTILITIES MANAGER
FOR THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
~ a 10 5 0 10 20
thil_
I Freddie Bunn UTILITY PROJECT MANAGER Kelvin Martin,EI SENIOR UTILITIES ENGINEER
cn• c�w
� (v) PROFILE (VERTICAL) Matthew Ward PROJECT UTILITY COORDINATOR Larry M.James,Jr. SENIOR UTILITY COORDINATOR
CO (
mw (n / \ / ` J ` J
CO (i) t
(OCO � \
Submitted 7/19/21
6 PROJECT REFERENCE NO. SHEET NO.
0-
B-5624 U0-2
50' 25' 0 50' 100' R' SHEET NO. 04
\ / ROADWAY ERSIGN HYDRAULICS
co
SCALE: 1"=100'
OPEN HDD DRILL
TRENCH \I-7,0
INCOMPLETE PLANS
l co DO NOT USE FOR R/W ACOVISITION
OPEN HDD DRILL
TRENCH \i'27
o, CDM -- SUNGATE DESIGN GROUP`P.A�Pnea
Smith e'ROV ° AI ��oa o" so
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
± s
AA
A A
PERMIT DRAWING
A A A i J MCNC 10' MINIMUM II I THE NATURE CONSERVANCY J
ATHE NATURE CONSERVANCY :.. �r BELOW STREAM 1 _IL SHEET 2 O F 4
At A m AT&T 10 MINIMUM o ±
A BELOW STREAM " DATE: 03-11-2021
* OPEN A HDD DRILL A SITE 4 * ,, I
MCIt NEW JIANDHOLE TO
TRENCH A ±
A AA a SITE�2
INTERCEPT- EXISTING `4 ± SITE 5 0
EXISTING R/W / 1 * IP h 1 A A 0
JO B� aRov orG(ro)Tc¢GaBLE x u c(ED)TEL.BLE.. PROP urc lrol TEL cadre 'FEN TEL CABLE PROP uir rol TEL Est eAo= +
w
vRov DIG(eo)T.` SC w000s ai R VIS AL
WOODS z F F _ E ,M F� C F D AT& PAN E:G B EGiF N
i8 'LE4
eTM B,M— F r E .. FiT&T�( M a' rrr r„ s ay � " .,.: »F AB.. n
Eo------
F RKER R (rm-rec DAnLLh —— r,Te jrl r
F c
REEK SWAMP RD WV "'� ICI i 15"RC•— ABANDONED I Olj
ABANDONED
I ABANDONED
_1 B57 VARIES 15 '-IV I.:::ICvm n ar
-- -- 'Irk
_— -- ET ET o , — � � � � — — "- � T Eo-
'T-�' .. -. .. — .E .— � ��-ram, _.. -.. :. -a, Bj 't���r -r'�. wL — a: .. _ JN
R I<. 'T :irrirrl Si T
T�faBL GTD + + W GTD I H 'm Fo MnRy.inir' :!...: —— GTD — ——_ ILWLIZR C 1 E1,i _ 1� IN ± wtow000s ___— �S NGNNIrC AT C m NDNMT + Z
fi
wO 9 �,,,,�. _— ..��,., . C C
CC EXISTING R/W ——— - l — — `� .o«_ mT 'r - C C 2
R MOUNTAIN TIMBERCO II LLC PEE [\ ---' ��—L =/ ('= \y\ E C E �' E V
———— '/// — leL\ —� WI R —�— `,—�— \— \ * A, ± N, Q
I I, ± ± \± PDE PDE P1DE PDE PDE \\ \I ±
AT&T iFIH TO INTERCEPT ± n THE NATURE CONSERVANC4Y SITE 2 ITE
EXISTING 3X1 .25 CDR 5' / ± ± ±\
1 ROLL±PIPE @ 5
± DEEP MIN. + A, ± 0 ,k + 1 .25" SDR 11
ATMC HH TO INTERCEJPT 1 ± A $ITE ± \\ ROLL PIPE @ 5' - A
EXISTING A A / DEEP MIN.
3X1 .25" SDR 11
ti
/ ROLL PIPE @ 10' W o
DEEP BENEATH a
STREAM BED
0
Z L\ Cu
'////, BRIDGE APPROACH SLAB
FOR-LDET-SEE SHEET NO.2B-1
100 100
BM•I BM•2
90 -L-STA.I7+72.07 -L-STAl9+,9.32 90
3933'RT,EL.62.5/' 36 LT.EL 5522'
I PI= I6+83.00 R/-SPIKE SET IN I0•CEDAR R/R SPIKE.'ET IN IO"OAK
`— L_
OPEN `HDD DRILL + EL =-68.63'VC = 230' CL STA 17+46-L-,
TRENCH K = l54 CL 5%f45"PSG
80 END OVERLAY Pl= 12-f95.00 ms 6o mpn 80
EL = 65.12 p w/4 7 emo BENT'APS
off-BE6�I15JhLGRADE VC = 189'
S W DEG
ATMC TRENCH K - 300
3 X3 X3 BORE PIT & STA 12+00.00 DS = >80 mph
70 HANDHO_E PLACEMENT —� PROPOSED GRADE
OPEN HDD CIAL 64•83 (+IU.Apki. n rI45-e6-Ly 70
a
AT&T 5'X 6' 603E PIT 8'_ TRENCH o ° ~�
FROM EXISTING EOP a. (+)0.3053X
60 _ _ ATMC \ /(' 60
Lu-
iB �� '•�..� FA)N&SfINC�(r �'ND
❑ ¢ o z - m
z m 19+44. /
a J z U j
50 ycNC 4'X4'X3 BORE PIT F -, w
Z 50
.Ez � m2 >- � ma min 10'
AA,A , MCNC NE HANDHOLE TO ❑ cc o
0,40. IN I1 RCE T EXIS1 ING — Q❑ 00 - �1
I.,-,,� _1 z i—
MCNC
,.Q ccr-criH
�� m Q MCNC
ALL
E9�v
ELIVIL
4949.
»� 10 11 12 13 14 15 16 17 18 19 20 21
Submitted 6/3/2021
._ PROJECT REFERENCE NO. SHEET NO.
Cr
B-5624 UO3
c1 50' 25' 0 50' 100' R'W SHEET NO.
ROADWAY ENGINEER SIGN HYDRAULICS ENGINEER
SCALE: 1"=100'
HDD DRILL OPEN `ti INCOMPLETE PLANS
TRENCH �O DO NOT USE FOR R/W ACQUISITION
o
HDD \!77
TOPENCH o, CDM �- SUNGATE DESIGN GROUP`P.A�Pnea
smith ���eF" .lbS. ''�oa o'''''
890
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
x PERMIT DRAWING
SITE 5 THE NATURE CONS=rVANCY± A SHEET 3 OF 4
* 1 ± A ±
E DATE: 03-11-2021
O ± HDD±DRILL OPEN
0 ± 4 TRENCH ±
O A 1
0 ± cVMCNC J< * ± EXISTING Riw x
+ yl TEL CAB S
m PROP U/G(Fa.TEL CABLES
± 1
x * A PROP O MCNC NEW�HANDHQLE TO ��
N •••'A Or/O�FO,rCEOOEEEAT&TA ''FOASS .NTERCEPT EXISTING
. E F —` a,,.... _ _S' FO MARKE' —d'IM _—— ——
±
.. T -.. c�. TFo—— TFo——
llailil
~~ =IP' AB4N DO ED NC 211-GREEN SWAMP RD NW
OW
W BST VARIES _
N am � we'——T Fo—— Y y _— G 2r - --- ——T FO—
_ ra—
I W aoP w�Fa
W GTD , 27' ±
Z LLI N i PaLe) -1JiG IFOI rep cna�e + .. .. .. _
o f" ATMC (TNT AT&T HtI TO INTERCEPT A
a IM A A A A EXISTING ,,
} A— EXISTING Riw x
°` 0 X X TMC HH TO INTERCEPT r
A,_ t A A A EXISTING ��
x
± A THE NATURE CONSERVANCY A A
1 SITE 3 ,3X1 .25" SDR 11 \
± ROLL PIPE @ 5 A A A
A
A DEEP MIN. A A A
x ± x
FOR-LDET-SEE SHEET NO.2B-2
100 100
OPEN HDD DRILL
TRENCH
90 HOD DRILL OPEN 90
TRENCH
AT 1-5X 6'IBORL PIT 8'
80 FROM EXISTING EOP 80
FED DRILL OPEN
ATMC TRENCH
3'X3'X3= BORE PIT &
HANDHOLE PLACEMENT
70 PROPOSER GRADE 70
f-J0.5862%
60 ATMC w 60
AT&T EXl lNG GR r cc z Q m
„, o ¢ o Qo
50 > 1-j m w o v MCNC 4'X4'X3' BORE PIT 50
wOI— m-m
4,o a o I- CO a MCNC NEW HA DHOLE TO
0,40. w o 0.5 INTERCEPT ISTING-
*2 40 CD Q I I 40
O.oa
Z
v .L
..Ir
... 21 22 23 24 25
Submitted 6/3/2021
B-5624 NEU ENVIRONMENTAL PERMIT NARRATIVE
AT&T (Telephone): AT&T has an U/G fiber optic cable is in conflict throughout the project along
the (North side) of NC 211 (Green Swamp Road). AT&T is encroaching within the NCDOT
R/W.
AT&T will place a new U/G conduit (fiber optic) cable that follows along the (North side) of
NC 211 (Green Swamp Road) inside the NCDOT R/W by directional bore and trenching. New
cables will tie back into existing lines by placing two new handholes at the bore pit
locations. Handhole locations are at -L- Sta. 10+82 +/- and -L-Sta. 24+39 +/-. This bore will
produce no permanent impacts to the wetlands. All stations are approximate in this report.
Contact: Mr. Yuri Moody; Email yuri.moody@genxcgroup.com, Phone 786-519-4809.
ATMC (Telephone): ATMC has an U/G fiber optic cable is in conflict throughout the project along
the (South side) of NC 211 (Green Swamp Road). ATMC is encroaching within the NCDOT
R/W.
ATMC will place a new U/G conduit (fiber optic) cable that follows along the (South side) of
NC 211 (Green Swamp Road) inside the NCDOT R/W by directional bore and trenching. New
cables will tie back into existing lines by placing two new handholes at the bore pit
locations. Handhole locations are at -L- Sta. 10+82 +/- and -L-Sta. 24+39 +/-. This bore will
produce no permanent impacts to the wetlands. All stations are approximate in this report.
Contact: Mr. Michael Barry; Email bmichael@atmc.com; Phone 910-755-1709.
MCNC (Telephone): MCNC has an U/G fiber optic cable is in conflict throughout the project along
the (North side) of NC 211 (Green Swamp Road). MCNC is encroaching within the NCDOT
R/W.
MCNC will place a new U/G conduit (fiber optic) cable that follows along the (North side) of
NC 211 (Green Swamp Road) inside the NCDOT R/W by directional bore and trenching. New
cables will tie back into existing lines by placing two new handholes at the bore pit
locations. Handhole locations are at -L- Sta. 10+30 +/- and -L-Sta. 25+05 +/-. This bore will
produce no permanent impacts to the wetlands. All stations are approximate in this report.
Contact: Mr. Brett Boger; Email brettboger@telics.com Phone 336-692-6477.
Conclusion (Total Impacts due to Utilities):
Permanent Fill in Wetlands 0.00 acres
Hand Clearing in Wetlands 0.00 acres