HomeMy WebLinkAboutGW1-2021-00279_Well Construction - GW1_20210718 �wn
WELL CONSTRUCTION RE •RD ,
NORTH CAROLINA
EnWronmental Quullty
•rm GW1 Well Construdon Electronic •
North Carolina Department of En\Aronmental Quality
April 1,2021
Submission ID#
G W 1-2021-00279
Are you submitting a printed form?* r Yes
r No
CONTACT INFORMATION
.........................................................................................................................
Contact Name* Email Address*
Steve King craigswelldrilling@yahoo.com
Is this a revision to the form you have previously submitted?*
r Yes r No
WELL CONSTRUCTION INFORMATION
......... ......... ......... ......... ......... ......... .........
1.Who is installing these wells?*
r Owner r Well Contractor
1.Well Contractor Information:
Certiticate# Cert Level First Name Last Name Company Name
4055 A JOEY VELASCO CRAIG'S WELL DRILLING
2.Well Construction Permit#:
List all applicable well construction permits(i.e.IVbnitoring Wells,UIC,County,CCPCUA,etc.)
What type of well is this?* r Injection Well r Non-Water Supply Well
r Water Supply Well(includes irrigation wells)
3.Water Supply WeII* r Geothermal(Heating/Cooling Supply) C Industrial/Commercial
r Irrigation C Municipal/Public/Community
r Residential Water Supply(single) C Residential Water Supply(shared)
r Wells>100,000 GPD
4. Date well was completed and ID#
Date Well Completed* Well ID# Well Yield
4/26/2021 25
(gallons per minute)"
5.Well Location
Facility/Owner Name*
Preservation Point Partners Facility ID#
(Required) (If applicable)
County* Parcel Identification No.(PIN)
New Hanover
Physical Address* Street Address
Preservation Point
Address Line 2
City State/Province/Region
Castle Hayne NC
Postal/ZZp Code Country
28401 USA
Latitude* 34.2660440000 Longitude*-77.9381440000
Decimal degrees Decimal degrees
6. Is(are)the well(s):* F Permanent r Temporary
7. Is this a repair to an existing well:* r Yes r No
If this is a repair,fill out known well construction information and explain the nature of the
repair under#21 remarks section or on the back of this form.
For multiple Geoprobe/DPT or Closed-Loop Geothermal Wells having the same construction,only 1 GW-1 is needed.
8a. Indicate TOTAL NUMBER of wells drilled: 1
9.Total well depth below land surface:(ft.) 9a.What is the depth of the casing from ground
98 surface?
Formultplewells Iistall depths if different 68
(e)ample-3@200'and 2@100') in feet
10.Static water level below top of casing:(ft.) 11. Borehole diameter:
16 8
If water level is above casing,use"+" in inches
12.Well construction method:
r Auger r Air Rotary r Cable Tool
r Direct Push r Mud Rotary r Rotosonic
r Other
13. FOR WATER SUPPLY WELLS ONLY:
13a.Yield (gpm)
25 13a. Method of test:
If applicable Air
13b. Disinfection type:* 13b.Amount:*
HTH 2 lbs.
14.WATER BEARING/FRACTURE ZONES
From To Description
68 98 Limestone
in feet in feet
15.OUTER CASING(for multi-cased wells)OR LINER(if applicable)
From To Diameter Thickness Material
in feet in feet in inches
17.SCREEN
From To Diameter Thickness Material
in feet in feet in inches
18.GROUT
From To Material Emplacment Method &Amount
in feet in feet
19.SAND/GRAVEL PACK(if applicable)
From To Material Emplacment Method
0.00 3.00 Hole Plug Gravity 2 bags
in feet in feet
3.00 20.00 Quick Grout Pour 3 bags
in feet in feet
20.DRILLING LOG
From To Description (color, hardness,soil/rock type,grain size,etc.)
0.00 8.00 Medium Sand
in feet in feet
8.00 25.00 Gray Clay
in feet in feet
25.00 48.00 Course Sand
in feet in feet
48.00 56.00 Shells
in feet in feet
56.00 63.00 Mud Rock
in feet in feet
63.00 68.00 Rock
in feet in feet
68.00 98.00 Limestone
in feet in feet
21.Remarks
22.Site diagram or additional well details:
You may upload additional well construction information here.
pdf only
CERTIFICATION INFORMATION
*W By signing this form, I hereby certify that the well(s)was(were)constructed in accordance with 15A NCAC 02C
.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy of this record has been provided to
the well owner.
23.Certification*
C �'MI AP
Signature of Certified Well Contractor
Submittal Date 7/18/2021