Loading...
HomeMy WebLinkAbout20151065 Ver 1_Email_20210713Strickland, Bev From: Brad Luckey <bluckey@pilotenviro.com> Sent: Tuesday, July 13, 2021 5:07 PM To: Homewood, Sue; David.E.Bailey2@usace.army.mil Cc: Alex Rosser; Lisa Elmore; Lorin Akins; Stephen Arenson; Matt Carter; David Brame Subject: [External] RE: PTIA Taxiway culvert Follow Up Flag: Flag for follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Sue/David, Thank you both for your time today. Based on the visit today, it is our understanding that no remedial or current action needs to occur at this time regarding sediment inside culvert or within the down -gradient stream. They will continue to monitor the culvert and rock check beneath the culvert during the construction phase of the project. Following completion of construction/grading, the rock check will be removed, and the rip -rap dissipater will be maintained and repaired to constructed design plans. Please confirm any discrepancies or anything that I have not adequately summarized. Thanks. Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com bluckey@pilotenviro.com From: Alex Rosser <RosserA@gsoair.org> Sent: Wednesday, June 30, 2021 12:24 PM To: Homewood, Sue <sue.homewood@ncdenr.gov> Cc: David.E.Bailey2@usace.army.mil; Brad Luckey <bluckey@pilotenviro.com>; David Brame <dbrame@pilotenviro.com>; Lisa Elmore <ElmoreL@gsoair.org>; Lorin Akins <AkinsL@gsoair.org> Subject: RE: PTIA Taxiway culvert Sue, Please just keep it on the same schedule. I will not be there, but have asked Brad and David with Pilot to join you on our site. They are added to the email. Lisa and Lorin form the airport are also added and might join you all. Thanks! J. Alex Rosser, P.E. Chief Operating Officer Piedmont Triad Airport Authority i 1000A Ted Johnson Parkway Greensboro, NC 27409 Phone: 336.665.5600 Fax: 336.665.5694 rossera@gsoair.org dFTI PIEOMONT TRIAD AIRPORT AUTHORITY www.flyfrompti.com From: Homewood, Sue <sue.homewood@ncdenr.Rov> Sent: Friday, June 25, 2021 8:13 AM To: Alex Rosser <RosserA@gsoair.org> Cc: David.E.Bailey2@usace.army.mil Subject: PTIA Taxiway culvert Hi Alex, As I mentioned when I saw you a couple weeks ago, David Bailey and I would like to schedule a site visit to review the culverts on the PTIA taxiway project. Per referral from Kim Turney, she asked if we could comment on the lack of material in the culvert bottom as well as the condition of the channel below the culvert. David and I would like to meet out there on 7/13 at approximately 2 pm if that will work for you. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue.Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 2