HomeMy WebLinkAbout20151065 Ver 1_Email_20210713Strickland, Bev
From: Brad Luckey <bluckey@pilotenviro.com>
Sent: Tuesday, July 13, 2021 5:07 PM
To: Homewood, Sue; David.E.Bailey2@usace.army.mil
Cc: Alex Rosser; Lisa Elmore; Lorin Akins; Stephen Arenson; Matt Carter; David Brame
Subject: [External] RE: PTIA Taxiway culvert
Follow Up Flag: Flag for follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Sue/David,
Thank you both for your time today. Based on the visit today, it is our understanding that no remedial or current action
needs to occur at this time regarding sediment inside culvert or within the down -gradient stream. They will continue to
monitor the culvert and rock check beneath the culvert during the construction phase of the project. Following
completion of construction/grading, the rock check will be removed, and the rip -rap dissipater will be maintained and
repaired to constructed design plans. Please confirm any discrepancies or anything that I have not adequately
summarized. Thanks.
Sincerely,
Bradley S. Luckey, PWS
336.708.4997 (c)
336.310.4527 (o)
PO Box 128
Kernersville, NC 27285
www.pilotenviro.com
bluckey@pilotenviro.com
From: Alex Rosser <RosserA@gsoair.org>
Sent: Wednesday, June 30, 2021 12:24 PM
To: Homewood, Sue <sue.homewood@ncdenr.gov>
Cc: David.E.Bailey2@usace.army.mil; Brad Luckey <bluckey@pilotenviro.com>; David Brame
<dbrame@pilotenviro.com>; Lisa Elmore <ElmoreL@gsoair.org>; Lorin Akins <AkinsL@gsoair.org>
Subject: RE: PTIA Taxiway culvert
Sue,
Please just keep it on the same schedule. I will not be there, but have asked Brad and David with Pilot to join you on our
site. They are added to the email. Lisa and Lorin form the airport are also added and might join you all.
Thanks!
J. Alex Rosser, P.E.
Chief Operating Officer
Piedmont Triad Airport Authority
i
1000A Ted Johnson Parkway
Greensboro, NC 27409
Phone: 336.665.5600
Fax: 336.665.5694
rossera@gsoair.org
dFTI
PIEOMONT TRIAD AIRPORT AUTHORITY
www.flyfrompti.com
From: Homewood, Sue <sue.homewood@ncdenr.Rov>
Sent: Friday, June 25, 2021 8:13 AM
To: Alex Rosser <RosserA@gsoair.org>
Cc: David.E.Bailey2@usace.army.mil
Subject: PTIA Taxiway culvert
Hi Alex,
As I mentioned when I saw you a couple weeks ago, David Bailey and I would like to schedule a site visit to review the
culverts on the PTIA taxiway project. Per referral from Kim Turney, she asked if we could comment on the lack of
material in the culvert bottom as well as the condition of the channel below the culvert. David and I would like to meet
out there on 7/13 at approximately 2 pm if that will work for you.
Thanks,
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue.Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
2