HomeMy WebLinkAbout20180755 Ver 2_Additional Riprap Stabilization Permit Drawings 07.12.2021_20210712F2
E3 E4 E5 E6
E7
F6F5F4F3
F1
D5D4D3D2
D1
A1
A2 A3 A4 B3 B4
B5
B1
A5
A6
E1 E2
B2
W/BASEMENT
1SFD CONC36" WDWD
36"BST1SFD
3
6
" WD RAI
L
S
3
6" WD
R
AI
L
BKBK
S
S
84" CHLLP
S
S GATECONC
PAN
ELEC GR1SBKD
1SBKD
CONC-EL-
SR 1338 (WYNNE FORK RD) - 23’ BST
-EL-
SR 1338 (WYNNE FORK RD) - 23’ BST
S 6305’36" E
149.30’N
0
1
5
8’19
"
E
10
1.
2
6’
HARVEY ELLIS BUNCH
DB 71 PG 541
DB 165 PG 816
HARVEY ELLIS BUNCH
DB 64 PG 602
S 6325’20" E
139.63’
EIP
3.28’
S 6300’50" E
274.77’N
0
7
1
7
’
1
0
" E5
4.
7
9
’N 3747’08" E33.26’MARY BETH P. LAYTON
AND WIFE
MURIEL Q. LAYTON
DB 81 PG 238
N 6336’09" W
183.50’
N 1959’01" W54.36’N 2725’09" E45.57’N 1222’04" E37.45’
N 2018’19" E
26.12’
EIP 1.86’N 1324’48" E152.99’
S 6307’09" E
100.52’S 2304’09" E
81.25’
EIP
N
0
8
3
4
’
5
1" E1
0
1.
7
5’
1.00’
JAMES R. WHITE, JR.
DB 107 PG 494
DB 385 PG 467
AND TAMMY MAE GRIGGS
MARCUS LYNN STATEN
EIP
WD
48"
WOODS
WOODS
WOODS
S 8954’38" W
208.60’
EIP
HERBERT T. MULLEN, III
AND HUSBAND,
JAIME S. MULLEN
DB 405 PG 694
& SUPPLY COMPANY
HERTFORD LIVESTOCK
DB 29 PG 90
0.51’S
3
1
14’2
3" E2
5
7.
8
9’S 3619’23" E108.40’
S 5426’23" E
97.70’
S 7217’23" E
81.00’
N 8459’37" E
111.40’
S 1216’23" E
149.26’
DB 331 PG 204
MALEE P. VLASATY
PAULETTE D. WHITE
AND WIFE,
JAMES R. WHITE, JR.
DB 118 PG 57
S 2343’41" WN
0
1
5
5’19" W2
4
0.4
0’N 2146’41" E77.90’S
0
0
19’4
1" W9
6.4
5’S
3
3
2
7’
1
9" E9
6.70’
S
0
2
0
9’19"
E
8
4.3
5’GAS
T
ON DR -
2
1.3’ BS
T WHE
DB
E
E DR -
2
1’
B
S
T
12" CLAY
12"
C
L
AY12" CLAY 12" CLAY6" PVCUNK
END
SHARON R. LANE
AND WIFE,
ROBERT K. LANE
S 6040’14" E EIP
EIP
EIP
EIP
EIP
12"
C
L
AY(GPS MON) B56061BL3(GPS MON) B5606230.40’
E
XIS
TI
NG
R/WE
XIS
TI
NG
R/WEXISTING R/W
EXISTING R/W60.00’STEPS
E
XIS
TI
N
G
R/WE
XIS
TI
NG
R/W30.00’
S
S
WD
36"
W/LT
POLE
GUY
POLE
SERVICE
WOODS
60" CHL11 W/LT
EXISTING R/W
EXISTING R/W60.00’WOODS
T T
T
T
WATERLINE CONNECTED TO BRIDGE
FORCEMAIN CONNECTED TO BRIDGE
UNK
END4" CLAY
WET WELL MH
4" PVCUNK
END
STATION
SEWER PUMP
FOR PUMP STATION
OR DEED FOUND
NO EASEMENT
N 0946’58" E
20.22’
WOODS
JOHN DAVID COX
DB 48 PG 515
DB 128 PG 840
PATHSOIL MH
WELL
WET
US 17 (BUS)
TO
US 17 (BYP)
TO
HARVEY ELLIS BUNCH HARVEY ELLIS BUNCH
EIP
MARY BETH P. LAYTON
AND WIFE
MURIEL Q. LAYTON
EIP
EIP
JAMES R. WHITE, JR.
AND TAMMY MAE GRIGGS
MARCUS LYNN STATEN
EIP
EIP
HERBERT T. MULLEN, III
AND HUSBAND,
JAIME S. MULLEN
& SUPPLY COMPANY
HERTFORD LIVESTOCK
MALEE P. VLASATY
PAULETTE D. WHITE
AND WIFE,
JAMES R. WHITE, JR.
SHARON R. LANE
AND WIFE,
ROBERT K. LANE
EIP
EIP
EIP
EIP
EIP
DI
DIDI
DI
WATERLINE CONNECTED TO BRIDGE
JOHN DAVID COX
18" RCP
BRIDGE 11
CONC
WW
CONC
WW
CONC
-L- STA. 14+00.00
BEGIN CONSTRUCTION
-L- STA. 20+75.00
END CONSTRUCTION
(INC.)
24’
(INC.)
24’11.5’11.5’11.5’11.5’8:1 P.S.
8:1 P.S.
10’ R 10’ R
11’ DR.
(INC.)
24’+75+20+24TO BE REMOVED
EXISTING DRIVEWAY
8:1 P.S.
8:1 P.S..025.015.005.005.025SHEET 3 OF 6
PERMIT DRAWING
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
04B-5606
5/23/2018R:\Hydraulics\PERMITS_Environmental\Drawings\Perquimans 11_HYD_PRM_PSH04_WET.dgnjhopson8/17/99NOTE: FOR -L- PROFILE SEE SHEET 5
PC Sta. 17+92.54
.025.025NA 2011NAD 83/OF 12" CYPRESS
RR SPIKE IN BASE
ELEV.= 2.04’
O/S 103.22’ RT
-BL- STA 13+27.89
E: 2,746,110
N: 891,268
BM#1
MTR
DATUR
200 PR
200 PR
100 PR
100 PR
DI
DIDI
DI101520F
FF
F F
F
C
CC
CC
C
F
F
F
F
STA. 15+74.50-STA. 16+14
PROP. 39.5 LF SBG
STA. 15+60.50-STA. 15+96
PROP. 35.5 LF SBG
1
2
3
4
5
40.00’ RT
30.00’ RT
+75.00 -L-
40.00’ LT
30.00’ LT
+75.00 -L-
40.00’ LT
+92.54 -L-
40.00’ RT
+92.54 -L-
40.00’ RT
+79.02 -L-
40.00’ LT
+79.02 -L-
40.00’ RT
30.00’ RT
+00.00 -L-
L
(ON EIP)
30.00’ LT
+35.08 -L-
(ON P )
40.00’ LT
+32.64 -L-80.00’80.00’TYPE III
TYPE III
TYPE III
-L- STA. 16+05.14
BEGIN APPROACH SLAB
GREU TL-3
GREU TL-3GREU TL-3
GREU TL-3
TYPE III
029984
SEAL
E
NGINEERPROFESSIONA
L
ORTH CARO
LI
NA
N
DA
VI
D
P. BOCKERE
GI E
ES
L
O I
SEAL
NN ERPROFSIONANORTHCARLNA
15759 EDWORB .C NEHPETSSITE 1
STREAM AND WETLAND IMPACTS
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
IMPACTS
WATER
SURFACE
TEMPORARY
0.02 AC
SITE 2
FFFFF
F F
WETLANDS
PERM. FILL IN
SITE 3
WETLANDS
PERM. FILL IN
SITE 3
WETLANDS
PERM. FILL IN
SITE 2
WETLANDS
PERM. FILL IN
SITE 2
0.02 AC
0.01 AC
WETLANDS
IN
FILL
PERMANENT
WETLAND
DENOTES FILL INFF
WETLANDS
EXCAVATION IN
SITE 3
TOTAL 0.02 AC0.03 AC
SITE 3
0.05 AC
0.04 AC
0.10 AC
SURFACE WATER
TEMP. IMPACT IN
SITE 1
SURFACE WATER
TEMP. IMPACT IN
SITE 1
CLEARING
HAND
HC HC
CLEARING
DENOTES HAND
F
FF
F
E E IN WETLAND
DENOTES EXCAVATION
WETLANDS
IN
EXCAVATION
<0.01 AC
N/A N/A
<0.01 AC
N/A
N/A
N/A
ELEC. POLE
APPROX. PROP.
ELEC. POLE
APPROX. PROP.
CENTURY LINK
APPROX. PROP.
SEWER
APPROX. PROP.
WATER
APPROX. PROP.
E
& EXCAVATION
HAND CLEARING
SITE 2
& EXCAVATION
HAND CLEARING
SITE 2
E
& EXCAVATION
HAND CLEARING
SITE 3
& EXCAVATION
HAND CLEARING
SITE 3
& EXCAVATION
HAND CLEARING
SITE 3
E
<0.01 AC
12" RCP
18" CMP
12" RCP
15" CMP15" HDPE
UNK
END 12" RCP
18" HDPE
RET
WALL RACCOON CREEK
R
ACC
O
O
N CREE
K
15" RCP-IV
TB 2GI
0403
Flatter4:1 or
D2:1( Not to Scale)
SPECIAL CUT DITCH
FROM -L- STA. 19+25 TO STA. 20+25 RT
FROM -L- STA. 19+25 TO STA. 20+00 LT
DETAIL A
Min. D= 1 Ft.
Ground
Natural Slope
Ditch
Front
SEE DETAIL A
SPECIAL CUT DITCH
SEE DETAIL A
SPECIAL CUT DITCH
GEOTEXTILE, EST. 5 SY
CL B RIP RAP, EST. 1 TON
RETAIN
RETAIN
REMOVE
0405Max.
(See Cross-sections)
GEOTEXTILE, EST. 5 SY
CL B RIP RAP, EST. 1 TON
TB 2GI
0402
0401
15"
0404
15"
15"
0406
0405
TB 2GI
15"
TB 2GI
TB 2GI