Loading...
HomeMy WebLinkAboutNCC214053_ESC Approval Submitted_20210712ROY COOPER Governor MICHAEL S. REGAN ~ Secretary S. DANIEL SMITH Director NORTH CAROUNA zqi&QU March 23, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Keystone Group, Inc. ATTN: W. Scott Wallace 3708 Alliance Drive Greensboro, NC 27407 RE: Project Name: Council Creek Acres Approved: 32.25 Project ID: ALAMA-2021-032, County: Alamance City: Graham Address: Council Rd. River Basin: Cape Fear Stream Classification: WS-V; NSW -Jordan Lake Watershed Submitted By: CPT Engineering and Surveying Inc. Date Received by LQS: March 08, 2021 Plan Type: Revised Dear Mr. Wallace: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above -named project. The N01 form maybe accessed at deq.nc.gov/NCG01. Please direct questions about the NOl form to Annette North Carolina 1*parrm&a of Ec3vironmemat QXWfty 1 Mist= a tneW, Mkwa "LwW Resow�ces 13+-ton-SalemReginnal0011 a 1 450 fkmls MW Roa&Suite 3001 WkmtunlaakemNorth CardnaZM ' .mow 3362%.9800 Letter of Approval with Modifications Keystone Group, Inc. March 23, 2021 Page 2 of 4 Lucas at Annette.lucas@ncdenr.goy or Paul Clark at Paul.clark@ncdenE.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. Letter of Approval with Modifications Keystone Group, Inc. March 23, 2021 Page 3 of 4 In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Jack Dalton Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval with Modifications NCG01 Fact Sheet Modifications Required for Approval cc: CPT Engineers and Surveyors, Inc. ATTN: Charles Truby 4400 Tyning Street High Point, NC 27265 Letter of Approval with Modifications Keystone Group, Inc. March 23, 2021 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Council Creek Project ID: ALAMA-2021-032 County. Alamance 1. This review is for erosion and sedimentation control and associated construction stormwater only. Due to the nature of this ESC plan (topography, construction sequence), this project may not begin until a copy of applicable 401/404 permits are obtained, and copies provided to the Winston-Salem Regional Office, Land Quality Section. Alternately, revised plans could be submitted showing phased work to be completed before and after obtaining the applicable permits/certifications. Provide either a copy of the applicable 40i/404 permits or a copy of the applications. [15A NCAC 413.0106, G.S. 113A-57(3)] 2. At no time should sheet flaw from individual lots occur over fill slopes. The installation of swales and the removal of temporary erosion control berms must be coordinated so that flow is conveyed towards a sediment treatment/retention device at all times. [G.S. 113A-57(3)] 3. Stockpile locations must be maintained such that flow to basins and erosion control devices is not hindered by the stockpile. 7/14-day soil stabilization requirements apply to stockpile areas and must be stabilized if left in place longer than 7 days. [G.S. 113A-57(3), G.S.143-215.1, 15A NCAC 413.0115] 4. Be advised the 7/14-day soil stabilization requirements apply to any section of the project where land -disturbing activities have temporarily or permanently ceased and shall supersede any less stringent stabilization requirement on the plans. A permanent groundcover must be established within the proposed permanent swales. Additional mechanical measures may be required if the vegetative cover cannot be established as proposed. [15A NCAC 4B .0115] [G.S. 143-215.1] 5. Additional measures maybe required -The applicant is responsible for the control of sediment on -site. If berms and swales along the perimeter of individual lots are not sufficient to prevent sheet flow down slopes, the applicant must take additional steps necessary to stop sediment from leaving the site in these areas. [15A NCAC 4B .011S] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities