HomeMy WebLinkAboutWQ0038712_Sewer Extension Permit Status Update_20210708 ,Itf y, ROY COOPER '` ^-,� • 3 Si.I fib` Governor ? i r � DIONNE DELLI-GATTI GATTI 0\ Secretary ,`"' =.'`y S.DANIEL SMITH NORTH CAROLINA Director Environmental Quality -- June 15,2021 Kim Greenwood - Town of Walnut Cove RECEIVED PO Box130 Walnut Cove,NC 27052-0130 JUL 0 8 n21 Subject: , Engineering Certification Request Town of Walnut Cove NCDEQ/DWRINPDES Stokes County Dear Permittee: Based on a review of our records for permits issued during the period of 2016 through 2017, it appears that the Division of Water Resources(Division) has not yet received a final engineering certification in accordance with 15A NCAC 02T.0116,as well as the standard conditions of the permit,for the Wastewater Collection System Extension Permit(s) listed below. • Permit No.WQ0038712: Replacement of Three Sewage Pump Stations issued on 9/2/2016 If the permitted facility,or any portion of the facility,has been constructed and is in operation,a complete engineering certification is required to be submitted prior to placing the,system into service. It should be noted that failure to certify a sewer extension permit appropriately in accordance with the provisions of 15A NCAC 02T.0116 may result in enforcement action.A complete certification is one that includes a copy of the construction record drawings(plan and profile views of all sewer lines), pump station design calculations(if applicable),and the certification form as provided with the original permit. Please note that the Division may not acknowledge the receipt of certifications, however,the status can be viewed at any time using our online Sewer Extension Permit Tracker located on the Municipal Permitting Unit website. If the permitted facility has not been constructed and will not be constructed,the Permittee may request to have the permit rescinded by returning the attached Status Update form. If the Permittee no longer owns the facility or the Permittee's name has changed, please return the attached Status Updaterequesting information for ownership/name change. Please note that Permits are not automatically transferable in the event the project site is now owned by others. The Division requests a response from the Permittee by July 14,2021. The Status Update form on the back of this letter should be completed and included with all submittals. If you have any questions regarding this outreach program,please contact Collin Geersen via e-mail at Collin.Geersen@ncdenr.gov. Alternatively,voice mail messages can be left at(919)707-3608. Sincerely, Christyn L. Fertenbaugh, P.E., Environmental Engineer Municipal Permitting Unit, Division of Water Resources cc: Winston-Salem Regional Office,Water Quality Section Regional Operations[electronic] Municipal Permitting Unit[electronic copy] ..DE 4 North512North Carolina Salisbury DepartmentStreet1 of1617 EnMailvironmentalServicecenter I Raleigh Quality I DivisionNorth of Water Resources Carona 27699-1617 NORTH CAROUNA w�o+ m re uN /`� 919.707.9000 Request for Engineering Certification Date of Letter: June 15,2021 Sewer Extension Permit Status Update Please complete the applicable portion of this form for each permit and return this form and supporting documents by July 14,2021 to the attention of Collin Geersen at the Division's Municipal Permitting Unit by the delivery method below: NCDEQ/DWR WQPS—Municipal Permitting Unit By U.S.Postal Service: By Courier/Special Delivery: By Email: 1617 Mail Service Center 512 N.Salisbury St.Suite 925 Collin Geersen Raleigh, NC 27699-1617 Raleigh, NC 27604 Collin.Geersen@ncdenr.gov Permit No.:WQ0038712 Permittee: Town of Walnut Cove Project Name: Replacement of Three Sewage Pump Stations Project Status (Complete Signature&Date section below. Check appropriate box'to indicate Permittee's response.) Name&Title(print): Signature: Date: Comments: SEWER NOT YET CONSTRUCTED ❑ The Permittee certifies that the permitted project has not been constructed but shall be constructed in the future in conformity with the approved Permit, project plans,specifications,and supporting documents.The Permittee understands that the appropriate certification documents will need to be forwarded to the Division prior to operation. Subject permit shall be maintained in Active status. NOTE: If sewer will never be built,please complete Permit Rescission Request section below. SEWER HAS BEEN CONSTRUCTED ❑ Engineer's Certification: The Permitted project has been constructed and the required Certification page and supporting documents are being submitted to the Division with this form. OWNERSHIP/NAME CHANGE ❑ The Permittee requests information to apply for ownership or name change. Please provide email and phone number below for follow-up. Permit Rescission Request The Permittee requests that the subject permit be rescinded and certifies that the permitted sewer system has not been and shall not be constructed nor made operational.By signing below,we acknowledge that should we wish to operate a non-discharge sewer system in the future,we shall apply for and receive a new Wastewater Collection System Permit. • Name&Title( t): \ Y\ \`�`(�0.�` � Signature: 1W�a ,y� Date: . _�,` Comments:C��l,t� Contact Information Updates for Permittee Updated Contact Person&Title(Print): Updated Mailing Address: Updated Email: Updated Phone: