Loading...
HomeMy WebLinkAbout8_NCS000442_EC Site Inspection_20210708CITY OF ROCKY MOUNT ENGINEERING DEPARTMENT ROCKY MOUNT Erosion Control Site Inspection Report PUBLIC WORKS Engineering Dept., One Government Plaza, PO Box 1180 THE CENTER OF IT ALL Rocky Mount, NC 27802-1180 (252) 972-1121 FAX (252) 972-1176 Project: 13010, 0414 ho :may Date: _� -• z. 7 — zo zr I Location: Time: q,,So Av-.. Responsible Party: Weather & Site Conditions: f On -Going Activities at Time of Inspection: Contact Made With (Employee/Employer:) Site currently under NOV S & E Permit Issued by CRM Rain Guage provided & monitored Measures implemented per Plan Is the site in compliance with S.P.C.A.? Yes es e Al on.t, 0 Site currently under CNOV 0 Copy of Approved Plan On -Site NPDES Records available On -Site Modifications approved by CRM rNor7lf no, check violations below: Ll Failure to take all reasonable No Approved Plan measures Failure to follow approved plan Inadequate Buffer Zone Failure to submit revised plan Graded slopes and fills too steep ❑ Failure to provide adequate ground ❑ cover Unprotected exposed slopes ❑ Insufficient measures to retain ❑ Failure to maintain erosion control sediment on site measures Other (describe) Has off -site sedimentation occurred since last inspection? Corrective Measures Needed: Yes [::] NoMDegree if yes: Deadline: 5is, b- .-t -4 ros:00% can Fro t a4goEM r-,,.,e5tj. Comments: Elf-e ACCVLWQi ram+ 6A_ C_10st4 J PO