Loading...
HomeMy WebLinkAboutGW1-2021-03220_Well Construction - GW1_20210624 Mt�r YVe11 tvrettiityot Mli+e 3474-A rau,r Tu uEsatl n. n; dJG Well Coi?t ice t ertif�cat+on Number IS.OUTt!ft CASING for multliasd*00.10 OR LINER fif a krlrle Barefoors W611 Drilling&Nino Service:,LLC "UM TO I plAl sup THICKNESS MATT IA1. ft. I ft. I � ;In, Comp ftyHvfic �1 !f _ 2.Vi'c11 Comitruction Perfnit NPh TO M f 0d 9 1r6R NNFR CASING t7R TU nrNMETYA�r I THICKNESS I MATERIAL; I,isi ON appplimble Nr11 ca.atntafon permits#.e VIa Cawt)s Stan Yarfa+tet ek) O 3.Well Use(chetk well rite): W!w Supply Well: MSCREEd 20M To I ®IAM R I 640T6I7y: 'THICKNUfS 1.44AMIAL Agricultoral 13Municipal/Public10 tt. in Geothermal(Heating1cooling Supply) Rtsidaifia)Water Supply(single) 0 R In fndustrial:rAxmmcrcial 131kcsidential Water Supply(sh") `VGROUt Irri a4ron i'RO?t "to MATERIAL EmnAcrm"mMETNOD6 sIOUAT ikon-Water Supply Well: � 0 I L Aloniioring Recovery Injection WellE Aquifer Recharge 0 droundwater Remed laiion CK fa lleable ' Aquifer Storage rf95ANDIGR and Recovery Salinity Barrier MINI AYELTA.To I MATFRIAr: aM»Ae�r�r+r�t+un AquifcrTest E$tortnwaterbraindgt iI. a f� tt. i iixpctimcntal Technology E)Subsiderm-Control tt, ft. Geo hernial(Closed Loop] ['Tracer 10.DRILUNG LOG Ottrsrb addl8oeal ab"Irm tkno . FROM To nFSC�II ITION ache bsrda wiYrM"r c to else see t Geothermal(HeatioglCoolin Return). f Other(e lain under`821 Remarks) 4.bate wells)Completed: well IbN Sa."Well Lotatio : •R. rt, a oL Facility/Owncr•Phme facility ION(ifs,pplicabk) RE Ell 6' Physical dd. City.aril Zip "T h ft. 21:^RERlAR1CS-", County Tercel ldcmrrtcation Na.(PIN) In l)t111 Sb:Latitude and longitude In degreW"nutes/seconds or decimal degrees: ! 0 " VVR spcil,011 (ifunellfel .aft lationgissuffickw) 22,c0tifiration; 1Y01 d ,6.Is(ort)Ibe wells) Permanent. or O7emporar} S' ofOcitificd 1Ve11 ttratror By igtiins this fwrn,] rbr test fi•Ihot.rhe�arl!(s)cone(covets)opnstn+ctnd In aocordoner 7.Is this a repair to an txlsting well: QYea or U3No Kith/Set NCACW.0100 or ISA NCAiCA?C.071V Well Construction Standards and Aaro I/Ass is a rcirwir,fil/oru linage WINconsrrartion information and explain the nature of ibe +�pl'a�lhis rYt p►d Iats bernpro>#derltoeite r<elloH�ei. rrpoirunder.'21 nwaiki section err on the Batt of ibis form, 23•Site dlo#am or additional well details: 8.For Gcoprobe/DPT or Closed-Loop Geothermal Wells having the some You may use the back of this page to provide ndditional will site details Or wellconstruction,only I GW-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also ztlech additional pages if necessary. drilled, SUBMITTAL INST tUCTIONS 9.Total well depth below landsurtaee: r�(-�" IR.) 24a,For All Wells: Submit this form within 30 dejrs of comptelion of'weil nor Multiple NWfs 14t all depths ifd errnt(example-$@200'and 2QI0Vj cobstruction lathe foNoµ9ng: 10.-Staiie water level below top otcasing:� (ft,) Division of Water Reso rees,Informailon Processing Unit, If%wer noel is obow casiaa use" 1617 Atoll Service Center,Raleigh,INC 27699-1617 #" 11.Borehole diameter: (in) 24b.For Injection Wells: In addition to striding the farm to the address in 24a 12.Well construction method: ydli r( above,also submit alit Copy of this form within 30 days of completion of well (it.mu*,ruler),cable,dircei pus4etc.) construct ion to the following: Division of Water Resou",6ndergr6und Injeedon Control Program. FQR 1Vr1'!BR SUPPLY WELLS O\'LY; 16361Nall Service Center,Rnlclgb,NC 27699.1636 k !IV f 13a.Yield i(gpm} V Method of test4-i lilt 24c�adodress(es) above,valisolsubmirt brieee : In addition to•sending the form to 6py of this form within 30 days of 13b.pisinlection type: (a:yl Amount: ��� completion of well construction tb the county hw1th department of the.county _ - 1,where constructed,