Loading...
HomeMy WebLinkAboutSW6210204_Plan (Ex. DA)_20210422UGP UGP UGP TTTT T T UGP UGP UGP UGP UGP UGP GSANSANSANSANSAN SANSAN SAN UGTUGTUGTUGTUGT UGT UGP UGP UGP UGTUGTUGT UGT UGT UGPUGP G GG W W UGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTTTTT S TTT TT GGGX XXUGP UGPUGPUGPUGPUGPUGPUGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP G G G G G G G G G G G G G GGGGGGUCATV UCATV UCATV UCATV UCATV UCATV UCATV UCATV UCATV UCATV UCATV UCATV UCATV UCATV UCATV UCATV UCATV UC A T V UCATV UCATV UGT UGT UGT UGT UCATVUCATVUCATVUCATV INV. IN=264.36'UGPUGPT X X XXXMETAL STORAGE BUILDING FFE=266.86 270 270265 270270 OHPOHPOHPOHPOHPOHPWWWWWWWWWWWWWWOHP OHP OH P OHPOHPOHPOHPOHPOHPOHPUGP UGP INV. OUT=263.34' 18" RCP UGP XXXXXX XXXXX X X XXXXXXXCO 2 6 5265270265265265 UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVU C A T V UCATV UCATV UCATVUCATVUCATVUCATVCONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTIONLIMITSCONSTRUCTIONLIMITSCONSTRUCTIONLIMITSS1°14'17"W329.72'S1°47'43"E50.00'S9°41'43"E29.30'S86°02'17"W 496.13'N11°40'43"W411.20'N86°02'17"E 580.19'266267268269 272272 270271272273273269 269 265261261 262 262 263264 2662 6 7 267 267267267 2 6 7 2682692 6 0 2612 6 2 26126226326226 3 26 5 264 269 267268 26 6 266267 2682 6 4 26 4 263262 2682672682 6 7 263 262 261 268267268266267263262 263 264266267268269 269 267 269 268268 269268267267268269 26926726626 4266 268 269 267 267 267 267268 267267 2 6 6 266 26 7 264262 261264 268269 2672682 6 7 268268 SHWT BORING 1 ELEV.: 260.20 SHWT BORING 2 ELEV.: 260.00 SHWT BORING 3 ELEV.: 259.50 SHWT BORING 4 ELEV.: 261.33 SHWT BORING 5 ELEV.: 261.50 SHWT BORING 6 ELEV.: 262.50 ANALYSIS POINT A ANALYSIS POINT B B A SUBSURFACE DETENTION ASSEMBLY (SEE SHEET C5.6) JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.5410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICEN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E R 0 3 3 6 1 2N O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E RN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E RN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E R S E A LN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E RN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E RN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E RF R A N C I S S L I N S K Y, I I I2020-DEC-01 NCNG RAEFORD POV & MOV EXPANSION305 TEAL DRIVE RAEFORD, NORTH CAROLINA, 28376, NCNG# 3720140172 / SCO# 18-19694-01A43358 J. LEWIS F. SLINSKY F. SLINSKY PRELIMINARY PLANS FOR REVIEW ONLY DO NOT USE FOR CONSTRUCTION NAD 830 SCALE 1"=30' 60'30' C3.1 PRE-DEVLOPMENT STORMWATER MANAGEMENT PLAN1" = 30' ANALYSIS POINT A DRAINAGE AREA (Acres) COMPOSITE CPRE-DEVELOPMENT 3.82 Q1 Q10 0.62 7.24 11.42 EXISTING IMPERVIOUS (BUILT BEFORE 1997) NOTE: POST-DEVELOPMENT FLOW IS LESS THAN PRE-DEVELOPMENT FLOW AT ALL ANALYSIS POINTS. REFER TO CALCULATION BOOKLET FOR ADDITIONAL INFORMATION. Q100 14.83 EXISTING IMPERVIOUS (BUILT AFTER 1997) PRE-DEVELOPMENT IMPERVIOUS AREA AND WATER QUALITY TREATMENT PRE-DEVELOPMENT STORMWATER QUANTITY CONTROL ANALYSIS POINT B 1.34 0.65 2.15 3.49 4.66 PRE DEVELOPMENT ONSITE IMPERVIOUS SURFACES (BUILT BEFORE 1997) = 2.16± ACRES POST DEVELOPMENT ONSITE IMPERVIOUS SURFACES = 3.75± ACRES IMPERVIOUS AREA REQUIRED TO BE TREATED = 1.59± ACRES IMPERVIOUS AREA TREATED WITH STORMWATER FILTERS = 1.59 ± ACRES STORMWATER QUALITY CALCULATIONS DRAINAGE AREA TIME OF CONCENTRATION FLOW LINE TIME OF CONCENTRATION LINE AREA 'A' TIME OF CONCENTRATION LINE AREA 'B'