Loading...
HomeMy WebLinkAboutGW1-2021-00233_Well Construction - GW1_20210705 �wn WELL CONSTRUCTION RE •RD , NORTH CAROLINA EnWronmental Quullty •rm GW-1 Well Construdon Electronic • NorthCarolina Department of • Di\Asion April 1,2021 Page 1 Submission ID# GW 1-2021-00233 CONTACT INFORMATION ..................................................................................................................................... ............................................................................................................................... Contact Name* Email Address* Jimmy Wilson wilsonwelldrilling@yahoo.com Is this a revision to the form you have previously submitted? f Yes r No WELL CONSTRUCTION INFORMATION ......................................................................................................................................................................................... 1.Who is installing these wells?* r Owner r Well Contractor 1.Well Contractor Information: Certiticate# Cert Level First Name Last Name Company Name 4303 A JAMES WILSON WILSON WELL DRILLING 2.Well Construction Permit#: W2021000303 List all applicable well construction permits(i.e.Monitoring Wells,UIC,County,CCPCUA etc.) What type of well is this?* r Injection Well r Non-Water Supply Well r Water Supply Well(includes irrigation wells) 3.Water Supply Well* r Geothermal(Heating/Cooling Supply) r Industrial/Commercial r Irrigation r Municipal/Public/Community r Residential Water Supply(single) r Residential Water Supply(shared) r Wells>100,000 GPD 4. Date well was completed and ID# Date Well Completed* Well ID# Well Yield 6/30/2021 W2021000303 1 1/2 (gallons per minute)" Page 2 5.Well Location Facility/Owne r Name* Brennan Hervey Facility ID# (Required) (If applicable) County* Parcel Identification No.(PIN) Cherokee 45500450496000 Physical Address* Street Address Dickey Rd. Address Line 2 City State/Province/Region Murphy NC Postal/ZZp Code Country 28906 USA Latitude* 35.0182100000 Longitude*84.1458500000 Decimal degrees Decimal degrees 6. Is(are)the well(s):* r Permanent r Temporary 7. Is this a repair to an existing well:* r Yes r No If this is a repair,fill out known well construction information and a)plain the nature of the repair under#21 remarks section or on the back of this form. For multiple Geoprobe/DPT or Closed-Loop Geothermal Wells having the same construction,only 1 GW-1 is needed. 8a. Indicate TOTAL NUMBER of wells drilled: 1 9.Total well depth below land surface:(ft.) 9a.What is the depth of the casing from ground 506 surface? For multiple wells Iistall depths if different 40 (example-3 a200'and 2@100') in feet 10.Static water level below top of casing:(ft.) 11. Borehole diameter: 40 6 If water level is above casing,use"+" in inches 12.Well construction method: r Auger r Air Rotary r Cable Tool r Direct Push r Mud Rotary r Rotosonic r Other 13. FOR WATER SUPPLY WELLS ONLY: 13a.Yield (gpm) 1 1/2 13a. Method of test: If applicable Air 13b. Disinfection type:* 13b.Amount:* HTH Pellets 30 Page 3 14.WATER BEARING/FRACTURE ZONES From To Description in feet in feet 15.OUTER CASING(for multi-cased wells)OR LINER(if applicable) From To Diameter Thickness Material 0.00 40.00 6.25 SDR21 PVC in feet in feet in inches 17.SCREEN From To Diameter Thickness Material in feet in feet in inches 18.GROUT From To Material Emplacment Method &Amount 0.00 20.00 Portland Gravity-4 bags in feet in feet 19.SAND/GRAVEL PACK(if applicable) From To Material Emplacment Method in feet in feet 20.DRILLING LOG From To Description (color, hardness,soil/rock type,grain size,etc.) 0.00 34.00 Decomposed Rock in feet in feet 34.00 506.00 Granite in feet in feet 21.Remarks 22.Site diagram or additional well details: You mayupload additional well construction information here. pdf only *rJ By signing this form, I hereby certify that the well(s)was(were)constructed in accordance with 15A NCAC 02C .0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy of this record has been provided to the well owner. 23.Certification* 04ww Iuw WkIdAr Signature of Certified Well Contractor Submittal Date 7/5/2021